PrevailCrew

Michigan prevailing wage rates: MI20260085

Building construction in Ionia County.

MI20260085, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No existing rate changed amount.

1 classifications added, 3 removed or reworded
  • removed ELECTRICIAN: Low Voltage Wiring was $24.94 + $14.65 fringe
  • removed ELECTRICIAN: Low Voltage Wiring was $29.02 + $10.85 fringe
  • added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $42.74 + $21.53 fringe
  • removed SHEET METAL WORKER (Including HVAC Duct Installation; Excluding HVAC System Installation) was $42.74 + $21.53 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

MI20260085 wage rates
ClassificationBaseFringeTotalRate ID
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65ASBE0047-002
eff. 07/01/2025
BOILERMAKER$43.50$36.74$80.24BOIL0169-001
eff. 07/01/2025
TILE SETTER$32.20$23.46$55.66BRMI0009-008
eff. 08/01/2024
TILE FINISHER$27.94$21.15$49.09BRMI0009-008
eff. 08/01/2024
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK (EXCLUDING TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA)$28.29$21.42$49.71CARP0525-011
eff. 06/01/2023
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK (TOWNSHIPS OF DANBY, ORANGE, PORTLAND & SEBEWA)$36.21$20.91$57.12CARP1004-019
eff. 06/01/2025
MILLWRIGHT$40.04$26.47$66.51CARP1102-001
eff. 06/01/2025
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF BERLIN, BOSTON, CAMPBELL, EASTON, IONIA, KEENE, LYONS, NORTH PLAINS, ODESSA, ORLEANS, OTISCO & RONALD)$36.52$25.15$61.67ELEC0275-017
eff. 06/01/2024
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF ORANGE, PORTLAND, SEBEWA AND DANBY)$42.98$29.75$72.73ELEC0665-006
eff. 05/31/2024
OPERATOR: POWER EQUIPMENT: GROUP 5 OILER
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$31.23$25.25$56.48ENGI0324-034
eff. 06/01/2024
OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$33.71$25.25$58.96ENGI0324-034
eff. 06/01/2024
OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING)
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$39.57$25.25$64.82ENGI0324-034
eff. 06/01/2024
OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$39.57$25.25$64.82ENGI0324-034
eff. 06/01/2024
OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.28$25.25$66.53ENGI0324-034
eff. 06/01/2024
IRONWORKER, REINFORCING$36.55$29.51$66.06IRON0025-013
eff. 02/01/2025
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (EXCLUDING THE CITY OF PORTLAND)$24.90$12.95$37.85LABO0355-021
eff. 06/01/2021
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (CITY OF PORTLAND)$32.53$13.45$45.98LABO0499-011
eff. 06/01/2025
PAINTER: BRUSH AND SPRAY$28.75$18.68$47.43PAIN0845-007
eff. 06/01/2025
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (REMAINDER OF COUNTY)$47.40$23.35$70.75PLUM0174-005
eff. 07/01/2025
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (REMAINDER OF COUNTY)$47.40$23.35$70.75PLUM0174-005
eff. 07/01/2025
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (TOWNSHIPS OF DANBY & PORTLAND)
Scope and notes

FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING

$46.29$25.43$71.72PLUM0333-002
eff. 06/01/2025
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION
Scope and notes

FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING

$46.29$25.43$71.72PLUM0333-002
eff. 06/01/2025
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL)$42.74$21.53$64.27SHEE0007-004
eff. 05/01/2024
TRUCK DRIVER: TRACTOR HAUL TRUCK$13.57
EO 13658 minimum $13.65 may apply
$1.18$14.75SUMI2011-010
eff. 02/01/2011
TRUCK DRIVER: DUMP TRUCK$17.00$5.71$22.71SUMI2011-010
eff. 02/01/2011
SPRINKLER FITTER (FIRE SPRINKLERS)$17.88$4.73$22.61SUMI2011-010
eff. 02/01/2011
ROOFER$13.86$6.11$19.97SUMI2011-010
eff. 02/01/2011
PAINTER: ROLLER$16.21$2.81$19.02SUMI2011-010
eff. 02/01/2011
OPERATOR: LOADER$17.16$4.05$21.21SUMI2011-010
eff. 02/01/2011
OPERATOR: TRACTOR$15.72$1.92$17.64SUMI2011-010
eff. 02/01/2011
OPERATOR: CRANE$19.28$7.55$26.83SUMI2011-010
eff. 02/01/2011
OPERATOR: BULLDOZER$18.50$5.81$24.31SUMI2011-010
eff. 02/01/2011
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$16.50$6.17$22.67SUMI2011-010
eff. 02/01/2011
LABORER: PIPELAYER$18.32$3.28$21.60SUMI2011-010
eff. 02/01/2011
LABORER: MASON TENDER - CEMENT/CONCRETE$14.01$2.45$16.46SUMI2011-010
eff. 02/01/2011
LABORER: MASON TENDER - BRICK$18.87$2.16$21.03SUMI2011-010
eff. 02/01/2011
LABORER: LANDSCAPE & IRRIGATION$10.47
EO 13658 minimum $13.65 may apply
$0.00$10.47SUMI2011-010
eff. 02/01/2011
IRONWORKER, STRUCTURAL$18.13$4.88$23.01SUMI2011-010
eff. 02/01/2011
IRONWORKER, ORNAMENTAL$18.48$7.93$26.41SUMI2011-010
eff. 02/01/2011
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT)$16.75$2.75$19.50SUMI2011-010
eff. 02/01/2011
GLAZIER$15.29$2.68$17.97SUMI2011-010
eff. 02/01/2011
DRYWALL FINISHER/TAPER$15.91$2.92$18.83SUMI2011-010
eff. 02/01/2011
CEMENT MASON/CONCRETE FINISHER$17.16$4.25$21.41SUMI2011-010
eff. 02/01/2011
CARPENTER (FORM WORK ONLY)$18.62$6.42$25.04SUMI2011-010
eff. 02/01/2011
CARPENTER (DRYWALL HANGING ONLY)$17.26$2.69$19.95SUMI2011-010
eff. 02/01/2011
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$18.49$2.69$21.18SUMI2011-010
eff. 02/01/2011
BRICKLAYER$21.45$5.00$26.45SUMI2011-010
eff. 02/01/2011

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.