Michigan prevailing wage rates: MI20260100
Building construction in Washtenaw County.
MI20260100, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF ANN ARBOR, AUGUSTA, LODI, NORTHFIELD, PITTSFIELD, SALEM, SALINE, SCIO, SUPERIOR, WEBSTER, YPSILANTI & YORK) | $40.74 | $32.59 | $73.33 | ASBE0025-003 eff. 06/01/2025 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF BRIDGEWATER, DEXTER, FREEDOM, LIMS, LYNDON, MANCHESTER, SHARON & SYLVAN) | $40.00 | $23.65 | $63.65 | ASBE0047-001 eff. 07/01/2025 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 | BOIL0169-001 eff. 07/01/2025 |
| TILE SETTER | $40.53 | $23.62 | $64.15 | BRMI0009-010 eff. 08/01/2024 |
| TILE FINISHER | $33.50 | $23.52 | $57.02 | BRMI0009-010 eff. 08/01/2024 |
| BRICKLAYER | $40.71 | $28.21 | $68.92 | BRMI0009-010 eff. 08/01/2024 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $42.44 | $31.43 | $73.87 | CARP0687-001 eff. 06/01/2025 |
| CARPENTER (FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING) | $36.76 | $21.11 | $57.87 | CARP1045-001 eff. 06/01/2025 |
| MILLWRIGHT | $42.92 | $39.13 | $82.05 | CARP1102-002 eff. 06/01/2025 |
| ELECTRICIAN | $56.05 | $30.52 | $86.57 | ELEC0252-010 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 9 OILERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $35.29 | $25.35 | $60.64 | ENGI0324-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFTScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $43.63 | $25.35 | $68.98 | ENGI0324-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $45.34 | $25.35 | $70.69 | ENGI0324-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATORScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $46.31 | $25.35 | $71.66 | ENGI0324-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $47.17 | $25.35 | $72.52 | ENGI0324-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $47.99 | $25.35 | $73.34 | ENGI0324-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $48.29 | $25.35 | $73.64 | ENGI0324-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $48.79 | $25.35 | $74.14 | ENGI0324-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $51.29 | $25.35 | $76.64 | ENGI0324-017 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 | IRON0025-019 eff. 06/01/2025 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 | IRON0025-019 eff. 06/01/2025 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | LABO0334-005 eff. 06/01/2025 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | LABO0334-005 eff. 06/01/2025 |
| LABORER: PIPELAYER | $38.47 | $15.45 | $53.92 | LABO0499-005 eff. 08/01/2025 |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 | $53.78 | LABO0499-005 eff. 08/01/2025 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $38.11 | $15.45 | $53.56 | LABO0499-005 eff. 08/01/2025 |
| PAINTER: SPRAY | $26.86 | $17.66 | $44.52 | PAIN0022-003 eff. 06/01/2022 |
| PAINTER: DRYWALL FINISHING/TAPING | $32.85 | $20.41 | $53.26 | PAIN0022-003 eff. 06/01/2022 |
| PAINTER: BRUSH AND ROLLER | $32.85 | $20.41 | $53.26 | PAIN0022-003 eff. 06/01/2022 |
GLAZIERScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE FIRST FULL REGULAR SCHEDULED WORK DAY FOLLOWING THE HOLIDAY, PROVIDED THE EMPLOYEE IS PHYSICALLY ABLE TO WORK | $42.00 | $25.55 | $67.55 | PAIN0357-002 eff. 06/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $32.23 | $22.11 | $54.34 | PLAS0514-006 eff. 06/01/2023 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $51.30 | $25.87 | $77.17 | PLUM0190-004 eff. 06/01/2025 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $51.30 | $25.87 | $77.17 | PLUM0190-004 eff. 06/01/2025 |
| ROOFER | $42.67 | $21.62 | $64.29 | ROOF0070-001 eff. 05/08/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $53.57 | $33.95 | $87.52 | SFMI0704-001 eff. 08/01/2025 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $42.51 | $35.77 | $78.28 | SHEE0080-001 eff. 06/01/2024 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 EO 13658 minimum $13.65 may apply | $1.18 | $14.75 | SUMI2011-025 eff. 02/01/2011 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 | SUMI2011-025 eff. 02/01/2011 |
TRUCK DRIVER: GROUP 3 LOWBOYScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | $31.28 | $0.70 | $31.98 | TEAM0247-001 eff. 06/01/2025 |
TRUCK DRIVER: GROUP 2 SEMIScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | $31.18 | $0.70 | $31.88 | TEAM0247-001 eff. 06/01/2025 |
TRUCK DRIVER: GROUP 1 FLATBED; PICKUP; DUMP & TANDEMScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | $31.03 | $0.70 | $31.73 | TEAM0247-001 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.