Michigan prevailing wage rates: MI20260110
Building construction in Branch County.
MI20260110, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed LABORER: Pipelayer was $20.34 + $12.85 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BOILERMAKER | $43.50 | $37.64 | $81.14 | BOIL0169-002 eff. 07/01/2025 |
TILE SETTERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $35.83 | $22.18 | $58.01 | BRMI0009-005 eff. 08/01/2024 |
BRICKLAYERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $35.83 | $22.18 | $58.01 | BRMI0009-005 eff. 08/01/2024 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $28.29 | $21.42 | $49.71 | CARP0525-014 eff. 06/01/2023 |
| MILLWRIGHT | $40.04 | $26.47 | $66.51 | CARP1102-005 eff. 06/01/2025 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $41.00 | $25.74 | $66.74 | ELEC0445-002 eff. 06/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | ENGI0324-028 eff. 06/01/2024 |
POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | ENGI0324-028 eff. 06/01/2024 |
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | ENGI0324-028 eff. 06/01/2024 |
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | ENGI0324-028 eff. 06/01/2024 |
POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | ENGI0324-028 eff. 06/01/2024 |
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | ENGI0324-028 eff. 06/01/2024 |
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 | IRON0025-005 eff. 06/01/2025 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 | IRON0025-005 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | $57.45 | IRON0025-009 eff. 04/01/2025 |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $30.72 | $12.95 | $43.67 | LABO0355-016 eff. 06/01/2025 |
| LABORER : COMMON OR GENERAL; SANDBLASTER | $27.21 | $13.45 | $40.66 | LABO0355-016 eff. 06/01/2025 |
| PAINTER: SPRAY | $27.07 | $16.56 | $43.63 | PAIN0845-013 eff. 06/01/2025 |
| PAINTER: DRYWALL FINISHING/TAPING | $27.32 | $16.72 | $44.04 | PAIN0845-013 eff. 06/01/2025 |
| PAINTER: BRUSH AND ROLLER | $27.07 | $16.46 | $43.53 | PAIN0845-013 eff. 06/01/2025 |
| PLASTERER | $21.18 | $12.43 | $33.61 | PLAS0016-008 eff. 04/01/2014 |
| CEMENT MASON/CONCRETE FINISHER | $24.63 | $12.88 | $37.51 | PLAS0016-008 eff. 04/01/2014 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $46.29 | $25.43 | $71.72 | PLUM0333-005 eff. 06/01/2025 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $46.29 | $25.43 | $71.72 | PLUM0333-005 eff. 06/01/2025 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $46.29 | $25.43 | $71.72 | PLUM0333-005 eff. 06/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 | SFMI0669-003 eff. 01/02/2025 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 | $64.27 | SHEE0007-001 eff. 05/01/2024 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 | $64.27 | SHEE0007-001 eff. 05/01/2024 |
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 | SUMI2011-035 eff. 02/14/2011 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | $18.77 | SUMI2011-035 eff. 02/14/2011 |
| ROOFER | $15.73 | $7.41 | $23.14 | SUMI2011-035 eff. 02/14/2011 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | SUMI2011-035 eff. 02/14/2011 |
| OPERATOR: ROLLER | $26.64 | $8.09 | $34.73 | SUMI2011-035 eff. 02/14/2011 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | SUMI2011-035 eff. 02/14/2011 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | SUMI2011-035 eff. 02/14/2011 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 EO 13658 minimum $13.65 may apply | $0.00 | $12.84 | SUMI2011-035 eff. 02/14/2011 |
| GLAZIER | $16.95 | $4.74 | $21.69 | SUMI2011-035 eff. 02/14/2011 |
| FLOOR LAYER: CARPET | $19.59 | $7.57 | $27.16 | SUMI2011-035 eff. 02/14/2011 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 | $27.13 | SUMI2011-035 eff. 02/14/2011 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.