Michigan prevailing wage rates: MI20260131
Building construction in Lenawee County.
MI20260131, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed IRONWORKER: Metal Building Erection was $24.60 + $21.87 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF BLISSFIELD, CLINTON, DEERFIELD, FAIRFIELD, MACON, OGDEN, PALMYRA, RAISIN, RIDGEWAY, RIGA, & TECUMSEH) | $36.00 | $20.15 | $56.15 | ASBE0045-003 eff. 07/01/2023 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF ADRIAN, CAMBRIDGE, DOVER, FRANKLIN, HUDSON, MADISON, MADINA, ROLLIN, ROME, SENECA, & WOODSTOCK) | $36.62 | $19.78 | $56.40 | ASBE0047-007 eff. 07/01/2023 |
| BOILERMAKER | $43.50 | $37.64 | $81.14 | BOIL0085-004 eff. 01/06/2025 |
TILE SETTERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $35.83 | $22.18 | $58.01 | BRMI0009-005 eff. 08/01/2024 |
BRICKLAYERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $35.83 | $22.18 | $58.01 | BRMI0009-005 eff. 08/01/2024 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $35.41 | $21.06 | $56.47 | CARP1004-021 eff. 06/01/2025 |
| MILLWRIGHT | $42.92 | $39.13 | $82.05 | CARP1102-003 eff. 06/01/2025 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $48.40 | $17.79 | $66.19 | ELEC0008-004 eff. 05/25/2024 |
POWER EQUIPMENT OPERATOR: GROUP 9 OILERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $35.29 | $25.35 | $60.64 | ENGI0324-019 eff. 06/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFTScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $43.63 | $25.35 | $68.98 | ENGI0324-019 eff. 06/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 7 BOBCAT/SKID LOADER; LOADER;PAVER; SCRAPERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $45.34 | $25.35 | $70.69 | ENGI0324-019 eff. 06/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 6 REGULAR CRANE OPERATORScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $46.31 | $25.35 | $71.66 | ENGI0324-019 eff. 06/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $47.17 | $25.35 | $72.52 | ENGI0324-019 eff. 06/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $47.99 | $25.35 | $73.34 | ENGI0324-019 eff. 06/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $48.29 | $25.35 | $73.64 | ENGI0324-019 eff. 06/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $49.79 | $25.35 | $75.14 | ENGI0324-019 eff. 06/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | $51.29 | $25.35 | $76.64 | ENGI0324-019 eff. 06/01/2025 |
| IRONWORKER: REINFORCING & STRUCTURAL | $35.50 | $29.20 | $64.70 | IRON0055-004 eff. 07/01/2024 |
| LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) | $32.35 | $13.45 | $45.80 | LABO0499-007 eff. 06/01/2025 |
| PAINTER: SPRAY | $26.86 | $17.66 | $44.52 | PAIN0022-003 eff. 06/01/2022 |
| PAINTER: DRYWALL FINISHING/TAPING | $32.85 | $20.41 | $53.26 | PAIN0022-003 eff. 06/01/2022 |
| PAINTER: BRUSH AND ROLLER | $32.85 | $20.41 | $53.26 | PAIN0022-003 eff. 06/01/2022 |
| PLASTERER | $27.41 | $16.10 | $43.51 | PLAS0886-007 eff. 07/01/2014 |
| CEMENT MASON/CONCRETE FINISHER | $27.18 | $18.11 | $45.29 | PLAS0886-007 eff. 07/01/2014 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $42.26 | $23.70 | $65.96 | PLUM0190-002 eff. 06/01/2025 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $49.43 | $24.36 | $73.79 | PLUM0190-002 eff. 06/01/2025 |
| PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $51.30 | $25.87 | $77.17 | PLUM0190-002 eff. 06/01/2025 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $46.29 | $25.43 | $71.72 | PLUM0333-009 eff. 06/01/2025 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $46.29 | $25.43 | $71.72 | PLUM0333-009 eff. 06/01/2025 |
| PIPEFITTER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH) | $46.29 | $25.43 | $71.72 | PLUM0333-009 eff. 06/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 | SFMI0669-003 eff. 01/02/2025 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $30.80 | $21.51 | $52.31 | SHEE0033-033 eff. 07/01/2011 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $30.80 | $21.51 | $52.31 | SHEE0033-033 eff. 07/01/2011 |
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 | SUMI2011-056 eff. 02/14/2011 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.50 | $0.00 | $15.50 | SUMI2011-056 eff. 02/14/2011 |
| ROOFER | $15.73 | $7.41 | $23.14 | SUMI2011-056 eff. 02/14/2011 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | SUMI2011-056 eff. 02/14/2011 |
| OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | SUMI2011-056 eff. 02/14/2011 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | SUMI2011-056 eff. 02/14/2011 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | SUMI2011-056 eff. 02/14/2011 |
| OPERATOR: BACKHOE/EXCAVATOR | $29.04 | $9.76 | $38.80 | SUMI2011-056 eff. 02/14/2011 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 EO 13658 minimum $13.65 may apply | $0.00 | $12.84 | SUMI2011-056 eff. 02/14/2011 |
| GLAZIER | $16.95 | $4.74 | $21.69 | SUMI2011-056 eff. 02/14/2011 |
| FLOOR LAYER: CARPET | $19.59 | $7.57 | $27.16 | SUMI2011-056 eff. 02/14/2011 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.