PrevailCrew

Michigan prevailing wage rates: MI20260149

Building construction in Sanilac County.

MI20260149, modification 2, published 08/13/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

  • changed PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC SYSTEM INSTALLATION) base $40.30 → $45.96 (+$5.66), fringe $38.80 → $43.90 (+$5.10) New rates effective 05/04/2026 (previously 06/05/2024).

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

MI20260149 wage rates
ClassificationBaseFringeTotalRate ID
BOILERMAKER$43.50$37.64$81.14BOIL0169-002
eff. 07/01/2025
BRICKLAYER$38.87$25.18$64.05BRMI0001-005
eff. 06/01/2022
TILE SETTER$37.88$22.67$60.55BRMI0001-005
eff. 06/01/2022
CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION)$42.44$31.43$73.87CARP0687-010
eff. 06/01/2025
MILLWRIGHT$42.92$39.13$82.05CARP1102-003
eff. 06/01/2025
ELECTRICIAN, LOW VOLTAGE WIRING ONLY (INSTALLER)$30.12$14.57$44.69ELEC0058-005
eff. 07/02/2021
ELECTRICIAN, LOW VOLTAGE WIRING ONLY (TECHNICIAN)$37.62$14.80$52.42ELEC0058-005
eff. 07/02/2021
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$51.32$28.44$79.76ELEC0058-005
eff. 06/28/2024
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$44.13$24.85$68.98ENGI0324-023
eff. 06/01/2022
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$38.18$24.85$63.03ENGI0324-023
eff. 06/01/2022
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$40.83$24.85$65.68ENGI0324-023
eff. 06/01/2022
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$36.47$24.85$61.32ENGI0324-023
eff. 06/01/2022
OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$30.61$24.85$55.46ENGI0324-023
eff. 06/01/2022
OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$26.13$24.85$50.98ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A)$28.86$24.85$53.71ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C)$40.83$24.85$65.68ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL)$36.47$24.85$61.32ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D)$42.38$24.85$67.23ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A)$42.38$24.85$67.23ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C)$26.13$24.85$50.98ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL)$44.13$24.85$68.98ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D)$34.72$24.85$59.57ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A)$40.83$24.85$65.68ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C)$44.13$24.85$68.98ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL)$28.86$24.85$53.71ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D)$38.18$24.85$63.03ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A)$36.43$24.85$61.28ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C)$36.47$24.85$61.32ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL)$30.61$24.85$55.46ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D)$39.08$24.85$63.93ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A)$30.61$24.85$55.46ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL)$26.13$24.85$50.98ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D)$26.38$24.85$51.23ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A)$42.38$24.85$67.23ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C)$26.13$24.85$50.98ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A)$34.72$24.85$59.57ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C)$36.47$24.85$61.32ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D)$34.72$24.85$59.57ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A)$39.08$24.85$63.93ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C)$30.61$24.85$55.46ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D)$26.38$24.85$51.23ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A)$26.38$24.85$51.23ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C)$44.13$24.85$68.98ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL)$36.43$24.85$61.28ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D)$39.08$24.85$63.93ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A)$28.86$24.85$53.71ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C)$36.43$24.85$61.28ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL)$40.83$24.85$65.68ENGI0324-023
eff. 06/01/2022
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D)$38.18$24.85$63.03ENGI0324-023
eff. 06/01/2022
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY)$30.02$27.43$57.45IRON0025-009
eff. 04/01/2025
IRONWORKER, REINFORCING$36.55$33.37$69.92IRON0025-010
eff. 06/01/2025
IRONWORKER, STRUCTURAL$36.55$35.93$72.48IRON0025-010
eff. 06/01/2025
LABORER: COMMON OR GENERAL; MASON TENDER - BRICK; PIPELAYER; AND SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION$31.30$18.40$49.70LABO1075-013
eff. 06/01/2025
PAINTER: BRUSH, ROLLER AND SPRAY$23.79$12.02$35.81PAIN1474-007
eff. 06/01/2010
PAINTER: DRYWALL FINISHING/TAPING$23.79$12.02$35.81PAIN1474-007
eff. 06/01/2010
PLASTERER$30.63$14.07$44.70PLAS0067-005
eff. 04/01/2014
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC SYSTEM INSTALLATION)$45.96$43.90$89.86PLUM0636-011
eff. 05/04/2026
SPRINKLER FITTER (FIRE SPRINKLERS)$41.34$27.39$68.73SFMI0669-003
eff. 01/02/2025
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION)$42.51$35.77$78.28SHEE0080-007
eff. 06/01/2024
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION)$42.51$35.77$78.28SHEE0080-007
eff. 06/01/2024
ASBESTOS WORKER/HEAT & FROST INSULATOR$19.82$7.31$27.13SUMI2011-074
eff. 02/14/2011
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYING-CARPET$15.38$2.31$17.69SUMI2011-074
eff. 02/14/2011
CEMENT MASON/CONCRETE FINISHER$19.33$6.80$26.13SUMI2011-074
eff. 02/14/2011
FLOOR LAYER: CARPET$19.59$7.57$27.16SUMI2011-074
eff. 02/14/2011
GLAZIER$16.95$4.74$21.69SUMI2011-074
eff. 02/14/2011
LABORER: LANDSCAPE & IRRIGATION$12.84
EO 13658 minimum $13.65 may apply
$0.00$12.84SUMI2011-074
eff. 02/14/2011
LABORER: MASON TENDER - CEMENT/CONCRETE$16.11$4.51$20.62SUMI2011-074
eff. 02/14/2011
OPERATOR: BACKHOE/EXCAVATOR$20.34$14.59$34.93SUMI2011-074
eff. 02/14/2011
OPERATOR: BULLDOZER$22.34$1.22$23.56SUMI2011-074
eff. 02/14/2011
OPERATOR: GRADER/BLADE$24.04$6.03$30.07SUMI2011-074
eff. 02/14/2011
OPERATOR: ROLLER$28.02$7.07$35.09SUMI2011-074
eff. 02/14/2011
OPERATOR: TRACTOR$19.60$7.31$26.91SUMI2011-074
eff. 02/14/2011
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION$16.13$3.67$19.80SUMI2011-074
eff. 02/14/2011
ROOFER$15.73$7.41$23.14SUMI2011-074
eff. 02/14/2011
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK$15.65$3.12$18.77SUMI2011-074
eff. 02/14/2011
TRUCK DRIVER: FLATBED TRUCK$16.80$3.97$20.77SUMI2011-074
eff. 02/14/2011

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 08/13/2026. We format and check the official text; the determination in your contract is what applies.