Michigan prevailing wage rates: MI20260151
Building construction in Shiawassee County.
MI20260151, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No existing rate changed amount.
2 classifications added, 2 removed or reworded
- removed DRYWALL FINISHER/TAPER: Hand work was $27.15 + $15.00 fringe
- removed DRYWALL FINISHER/TAPER: Machine work was $27.15 + $15.00 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $31.01 + $17.19 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) $31.01 + $17.29 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 | ASBE0047-005 eff. 07/01/2025 |
| BOILERMAKER | $43.50 | $37.64 | $81.14 | BOIL0169-002 eff. 07/01/2025 |
TILE SETTERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $33.31 | $23.20 | $56.51 | BRMI0009-011 eff. 08/01/2024 |
PLASTERERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $34.43 | $24.44 | $58.87 | BRMI0009-011 eff. 08/01/2024 |
BRICKLAYERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $38.00 | $26.49 | $64.49 | BRMI0009-011 eff. 08/01/2024 |
| CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER - CARPET) | $35.86 | $23.69 | $59.55 | CARP0706-011 eff. 06/01/2025 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $36.46 | $23.69 | $60.15 | CARP0706-024 eff. 06/01/2025 |
| MILLWRIGHT | $42.92 | $39.13 | $82.05 | CARP1102-003 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | ENGI0324-022 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | ENGI0324-022 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | ENGI0324-022 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | ENGI0324-022 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | ENGI0324-022 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | ENGI0324-022 eff. 06/01/2024 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | $57.45 | IRON0025-009 eff. 04/01/2025 |
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 | IRON0025-010 eff. 06/01/2025 |
| IRONWORKER, REINFORCING | $36.55 | $33.37 | $69.92 | IRON0025-010 eff. 06/01/2025 |
| LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) | $29.46 | $16.10 | $45.56 | LABO1075-012 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) | $31.01 | $17.29 | $48.30 | PAIN1052-001 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $31.01 | $17.19 | $48.20 | PAIN1052-001 eff. 05/01/2025 |
| PAINTER: SPRAY | $31.01 | $17.29 | $48.30 | PAIN1052-001 eff. 05/01/2025 |
| PAINTER: BRUSH & ROLER | $32.58 | $18.12 | $50.70 | PAIN1052-001 eff. 05/01/2025 |
| DRYWALL FINISHER/TAPER (DRYWALL SANDING) | $33.54 | $18.12 | $51.66 | PAIN1052-004 eff. 06/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $25.58 | $12.88 | $38.46 | PLAS0016-013 eff. 04/01/2014 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION & EXCLUDES HVAC SYSTEM INSTALLATION) | $46.61 | $22.95 | $69.56 | PLUM0370-008 eff. 06/01/2025 |
| PLUMBER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $46.61 | $22.95 | $69.56 | PLUM0370-008 eff. 06/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 | SFMI0669-003 eff. 01/02/2025 |
| SHEET METAL WORKER (INCLDUING HVAC DUCT & SYSTEM INSTALLATION) | $35.19 | $23.57 | $58.76 | SHEE0007-011 eff. 05/01/2023 |
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 | SUMI2011-076 eff. 02/14/2011 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | $18.77 | SUMI2011-076 eff. 02/14/2011 |
| ROOFER | $15.73 | $7.41 | $23.14 | SUMI2011-076 eff. 02/14/2011 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | SUMI2011-076 eff. 02/14/2011 |
| OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | SUMI2011-076 eff. 02/14/2011 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | SUMI2011-076 eff. 02/14/2011 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | SUMI2011-076 eff. 02/14/2011 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 EO 13658 minimum $13.65 may apply | $0.00 | $12.84 | SUMI2011-076 eff. 02/14/2011 |
| GLAZIER | $16.95 | $4.74 | $21.69 | SUMI2011-076 eff. 02/14/2011 |
| FLOOR LAYER: CARPET | $19.59 | $7.57 | $27.16 | SUMI2011-076 eff. 02/14/2011 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.