Michigan prevailing wage rates: MI20260158
Heavy construction in Alcona, Alger, Allegan, Alpena, Antrim, Arenac, Baraga, Barry, Bay, Benzie, Berrien, Branch, Calhoun, Cass, Charlevoix, Cheboygan, Chippewa, Clare, Clinton, Crawford, Delta, Dickinson, Eaton, Emmet, Genesee, Gladwin, Gogebic, Grand Traverse, Gratiot, Hillsdale, Houghton, Huron, Ingham, Ionia, Iosco, Iron, Isabella, Jackson, Kalamazoo, Kalkaska, Kent, Keweenaw, Lake, Lapeer, Leelanau, Lenawee, Livingston, Luce, Mackinac, Macomb, Manistee, Marquette, Mason, Mecosta, Menominee, Midland, Missaukee, Monroe, Montcalm, Montmorency, Muskegon, Newaygo, Oakland, Oceana, Ogemaw, Ontonagon, Osceola, Oscoda, Otsego, Ottawa, Presque Isle, Roscommon, Saginaw, Sanilac, Schoolcraft, Shiawassee, St Clair, St Joseph, St Joseph, Tuscola, Van Buren, Washtenaw, Wayne, Wexford Counties.
MI20260158, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
45 classifications added, 52 removed or reworded
- removed Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE AND WEXFORD COUNTIES - Zone 10): class a was $17.64 + $12.90 fringe
- removed Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE AND WEXFORD COUNTIES - Zone 10): class b was $18.64 + $12.90 fringe
- removed Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE AND WEXFORD COUNTIES - Zone 10): Levels A, B or C was $17.45 + $12.75 fringe
- removed Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE AND WEXFORD COUNTIES - Zone 10): Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D was $16.45 + $12.75 fringe
- removed Laborers - hazardous waste abatement: (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - Zone 11): Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D was $22.58 + $12.90 fringe
- removed Laborers - hazardous waste abatement: (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - Zone 8): Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D was $20.80 + $12.90 fringe
- removed Laborers - hazardous waste abatement: (CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (City of Portland); LIVINGSTON COUNTY (west of Oak Grove Rd., including the City of Howell) - Zone 6): Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D was $24.64 + $12.90 fringe
- removed Laborers - hazardous waste abatement: (HILLSDALE, JACKSON AND LENAWEE COUNTIES - Zone 4): Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D was $24.17 + $12.90 fringe
- removed Laborers - hazardous waste abatement: (SANILAC AND ST. CLAIR COUNTIES - Zone 5): Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D was $24.75 + $16.35 fringe
- added LABORERS - HAZARDOUS WASTE ABATEMENT: class a $17.64 + $12.90 fringe
- added LABORERS - HAZARDOUS WASTE ABATEMENT: class b $18.64 + $12.90 fringe
- added LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 (LEVELS A, B OR C) $24.20 + $13.80 fringe
- added LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D $23.20 + $13.80 fringe
- added LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 (LEVELS A, B OR C) $31.75 + $14.90 fringe
- added LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D $31.75 + $14.90 fringe
- removed Levels A, B or C was $24.20 + $13.80 fringe
- removed Levels A, B or C was $31.75 + $14.90 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): CAPPING LANDFILL: Engineer when operating crane with boom and jib or leads 140' or longer was $32.18 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): CAPPING LANDFILL: Engineer when operating crane with boom and jib or leads 220' or longer was $32.48 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): CAPPING LANDFILL: GROUP 1 was $29.53 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): CAPPING LANDFILL: GROUP 2 was $25.30 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): CAPPING LANDFILL: Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator was $29.88 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): Engineer when operating crane with boom and jib or leads 140' or longer was $34.68 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): Engineer when operating crane with boom and jib or leads 140' or longer was $33.73 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): Engineer when operating crane with boom and jib or leads 140' or longer was $32.43 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): Engineer when operating crane with boom and jib or leads 220' or longer was $34.98 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): Engineer when operating crane with boom and jib or leads 220' or longer was $34.03 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): Engineer when operating crane with boom and jib or leads 220' or longer was $32.73 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): GROUP 1 was $32.03 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): GROUP 1 was $31.08 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): GROUP 1 was $29.78 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): GROUP 2 was $27.80 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): GROUP 2 was $26.85 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): GROUP 2 was $25.55 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator was $33.00 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 1): Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator was $30.75 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): CAPPING LANDFILL: Engineer when operating crane with boom and jib or leads 140' or longer was $30.47 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): CAPPING LANDFILL: Engineer when operating crane with boom and jib or leads 220' or longer was $30.77 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): CAPPING LANDFILL: GROUP 1 was $27.82 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): CAPPING LANDFILL: GROUP 2 was $23.43 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): CAPPING LANDFILL: Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator was $28.79 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): Engineer when operating crane with boom and jib or leads 140' or longer was $32.97 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): Engineer when operating crane with boom and jib or leads 140' or longer was $31.91 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): Engineer when operating crane with boom and jib or leads 140' or longer was $30.72 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): Engineer when operating crane with boom and jib or leads 220' or longer was $33.27 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): Engineer when operating crane with boom and jib or leads 220' or longer was $32.23 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): Engineer when operating crane with boom and jib or leads 220' or longer was $31.02 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): GROUP 1 was $30.32 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): GROUP 1 was $29.37 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): GROUP 1 was $28.07 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): GROUP 2 was $25.92 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): GROUP 2 was $24.98 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): GROUP 2 was $23.68 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator was $31.29 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator was $30.34 + $19.70 fringe
- removed Power equipment operators - hazardous waste removal: (AREA 2): Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator was $29.04 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) $34.68 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) $33.73 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $32.18 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) $32.43 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) $34.98 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) $34.03 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $32.48 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) $32.73 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) $32.03 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) $31.08 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $29.53 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) $29.78 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) $27.80 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) $26.85 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $25.30 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) $25.55 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) $33.00 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $29.88 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) $30.75 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) $32.97 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) $31.91 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $30.47 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) $30.72 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) $33.27 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) $32.23 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $30.77 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) $31.02 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) $30.32 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) $29.37 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $27.82 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) $28.07 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) $25.92 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) $24.98 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $23.43 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) $23.68 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) $31.29 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) $30.34 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $28.79 + $19.70 fringe
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) $29.04 + $19.70 fringe
- removed Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D was $23.20 + $13.80 fringe
- removed Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D was $31.75 + $14.90 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) | $29.04 | $19.70 | $48.74 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $28.79 | $19.70 | $48.49 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) | $30.34 | $19.70 | $50.04 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) | $31.29 | $19.70 | $50.99 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) | $23.68 | $19.70 | $43.38 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $23.43 | $19.70 | $43.13 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) | $24.98 | $19.70 | $44.68 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) | $25.92 | $19.70 | $45.62 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) | $28.07 | $19.70 | $47.77 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $27.82 | $19.70 | $47.52 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) | $29.37 | $19.70 | $49.07 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) | $30.32 | $19.70 | $50.02 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) | $31.02 | $19.70 | $50.72 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $30.77 | $19.70 | $50.47 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) | $32.23 | $19.70 | $51.93 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) | $33.27 | $19.70 | $52.97 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) | $30.72 | $19.70 | $50.42 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $30.47 | $19.70 | $50.17 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) | $31.91 | $19.70 | $51.61 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) | $32.97 | $19.70 | $52.67 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, PWER SHOVEL OPERATOR | $32.05 | $19.70 | $51.75 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) | $30.75 | $19.70 | $50.45 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $29.88 | $19.70 | $49.58 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) | $33.00 | $19.70 | $52.70 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) | $25.55 | $19.70 | $45.25 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $25.30 | $19.70 | $45.00 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) | $26.85 | $19.70 | $46.55 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) | $27.80 | $19.70 | $47.50 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) | $29.78 | $19.70 | $49.48 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $29.53 | $19.70 | $49.23 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) | $31.08 | $19.70 | $50.78 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) | $32.03 | $19.70 | $51.73 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) | $32.73 | $19.70 | $52.43 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $32.48 | $19.70 | $52.18 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) | $34.03 | $19.70 | $53.73 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) | $34.98 | $19.70 | $54.68 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) | $32.43 | $19.70 | $52.13 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $32.18 | $19.70 | $51.88 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) | $33.73 | $19.70 | $53.43 | ENGI0325-011 eff. 10/01/2011 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) | $34.68 | $19.70 | $54.38 | ENGI0325-011 eff. 10/01/2011 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 (LEVELS A, B OR C) | $29.93 | $16.90 | $46.83 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 (LEVEL A, B, C) | $29.93 | $16.90 | $46.83 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $31.75 | $14.90 | $46.65 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 (LEVELS A, B OR C) | $31.75 | $14.90 | $46.65 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $14.20 | $43.13 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 (LEVELS A, B OR C) | $29.93 | $14.20 | $44.13 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $23.20 | $13.80 | $37.00 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 (LEVELS A, B OR C) | $24.20 | $13.80 | $38.00 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class b | $18.64 | $12.90 | $31.54 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class a | $17.64 | $12.90 | $30.54 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5 (LEVELS A, B OR C) | $26.21 | $16.62 | $42.83 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4 (LEVELS A, B OR C) | $27.13 | $14.95 | $42.08 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); LIVINGSTON COUNTY (WEST OF OAK GROVE RD., INCLUDING THE CITY OF HOWELL) - ZONE 6 (LEVELS A, B OR C) | $26.33 | $12.95 | $39.28 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - ZONE 8 (LEVELS A, B OR C) | $23.74 | $12.95 | $36.69 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $20.80 | $12.90 | $33.70 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 (LEVELS A, B OR C) | $21.88 | $13.26 | $35.14 | LABO0005-006 eff. 10/01/2022 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - ZONE 11 (LEVELS A, B OR C) | $25.18 | $12.90 | $38.08 | LABO0005-006 eff. 10/01/2022 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.