Minnesota prevailing wage rates: MN20260008
Residential construction in McLeod, Sibley Counties.
MN20260008, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
2 classifications added, 2 removed or reworded
- removed CARPENTER was $36.71 + $20.17 fringe
- added CARPENTER (MCLEOD) $36.71 + $20.17 fringe
- added CARPENTER: WOOD FRAME CONSTRUCTION (MCLEOD) $36.71 + $20.17 fringe
- removed Wood Frame Construction was $36.71 + $20.17 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $55.34 | $34.03 | $89.37 | ASBE0034-004 eff. 06/09/2025 |
| BOILERMAKER | $48.00 | $31.14 | $79.14 | BOIL0647-003 eff. 01/01/2025 |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, CAULKER, CLEANER, POINTER, STONEMASON (SIBLEY COUNTY) | $45.11 | $25.61 | $70.72 | BRMN0001-007 eff. 05/01/2023 |
| MARBLE SETTER | $45.47 | $26.33 | $71.80 | BRMN0001-009 eff. 05/01/2023 |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (MCLEOD COUNTY) | $45.11 | $25.61 | $70.72 | BRMN0001-012 eff. 05/01/2023 |
| TILE LAYER (SIBLEY COUNTY) | $34.92 | $21.81 | $56.73 | BRMN0001-020 eff. 05/01/2023 |
| TILE LAYER (MCLEOD COUNTY) | $39.17 | $10.16 | $49.33 | BRMN0001-020 eff. 05/01/2023 |
| TILE FINISHER | $28.50 | $8.20 | $36.70 | BRMN0001-023 eff. 05/01/2023 |
| TERRAZZO WORKER/SETTER (MECHANIC) | $44.36 | $22.35 | $66.71 | BRMN0001-035 eff. 05/02/2022 |
| TERRAZZO WORKER/SETTER (FINISHER) | $42.67 | $22.04 | $64.71 | BRMN0001-035 eff. 05/02/2022 |
| TERRAZZO WORKER/SETTER (BASE MACHINE) | $40.60 | $21.94 | $62.54 | BRMN0001-035 eff. 05/02/2022 |
| LATHER | $39.55 | $28.63 | $68.18 | CARP0068-001 eff. 05/05/2025 |
| SOFT FLOOR LAYER (MCLEOD (E. PART, INCLUDING WINSTED, SILVER LAKE, LESTER PRAIRIE, PLATO & GLENCOE) & SIBLEY (NE PART, INCLUDING GREEN ISLE)) | $39.03 | $25.00 | $64.03 | CARP0068-004 eff. 04/29/2024 |
| MILLWRIGHT | $42.95 | $36.81 | $79.76 | CARP0548-004 eff. 05/01/2025 |
| CARPENTER: WOOD FRAME CONSTRUCTION (MCLEOD) | $36.71 | $20.17 | $56.88 | CARP0930-018 eff. 04/29/2024 |
| CARPENTER (MCLEOD) | $36.71 | $20.17 | $56.88 | CARP0930-018 eff. 04/29/2024 |
| CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY (EASTERN 1/3)) | $36.71 | $20.17 | $56.88 | CARP1382-003 eff. 04/29/2024 |
| CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY (WESTERN 2/3 INCLUDING GREEN ISLE, NEW AUBURN, AND GAYLORD)) | $36.71 | $20.17 | $56.88 | CARP1382-011 eff. 04/29/2024 |
| ELECTRICIAN ELECTRICAL CONTRACTS UNDER $5MILLION (MCLEOD COUNTY) CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $43.67 | $22.35 | $66.02 | ELEC0292-008 eff. 07/01/2023 |
| ELECTRICIAN ELECTRICAL CONTRACTS $ 5 MILLION AND OVER (MCLEOD COUNTY) CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $44.12 | $22.57 | $66.69 | ELEC0292-008 eff. 07/01/2023 |
| ELECTRICIAN (SIBLEY COUNTY) | $40.25 | $23.32 | $63.57 | ELEC0343-004 eff. 09/01/2025 |
ELEVATOR MECHANIC A.PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAIDScope and notesHOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $62.52 | $38.44 | $100.96 | ELEV0009-005 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR GROUP 8 MECHANICAL SPACE HEATER (TEMPORARY HEAT); OILER OR GREASER; & ELEVATOR | $28.29 | $15.95 | $44.24 | ENGI0049-012 eff. 05/01/2012 |
| POWER EQUIPMENT OPERATOR GROUP 7 AIR COMPRESSOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR; BRAKEMAN; PICK-UP SWEEPER (1 CU. YD. & OVER HOPPER CAPACITY); TRUCK CRANE OILER; & WELDING MACHINE, FIREMAN TEMPORARY HEAT | $30.30 | $15.95 | $46.25 | ENGI0049-012 eff. 05/01/2012 |
| POWER EQUIPMENT OPERATOR GROUP 6 CONCRETE BATCH PLANT; GUNITE; TRACTOR D2 OR SIMILAR SIZE; & FRONT END LOADER, UP TO 1 CU. YD | $31.42 | $15.95 | $47.37 | ENGI0049-012 eff. 05/01/2012 |
| POWER EQUIPMENT OPERATOR GROUP 5 AIR COMPRESSOR 450 CFM OR OVER (2 OR MORE MACHINES); PUMP AND/OR CONVEYOR (2 OR MORE MACHINES); MECHANIC; PUMPCRETE OR COMPLACO TYPE MACHINE; FORKLIFT; BOOM TRUCK UP TO 100 FT.; CONCRETE MIXER; DRILL RIG - HEAVY ROTARY OR CHURN WHEN USED FOR CAISSON DRILLING FOR ELEVATOR CYLINDER OR BUILDING CONSTRUCTION; FRONT END LOADER (OVER 1 CU. YD.); HOIST ENGINEER (1 OR 2 DRUMS); STRADDLE CARRIER; POWER PLANT ENGINEER (100 KW & OVER ON MULTIPLES EQUAL TO 100KW & OVER); TRACTOR OVER D2; & WELL POINT PUMP | $32.93 | $15.95 | $48.88 | ENGI0049-012 eff. 05/01/2012 |
| POWER EQUIPMENT OPERATOR GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER (3 DRUMS OR MORE); LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR (INSIDE BUILDING PERIMETER); & TRACTOR OPERATOR WITH BOOM | $33.10 | $15.95 | $49.05 | ENGI0049-012 eff. 05/01/2012 |
| POWER EQUIPMENT OPERATOR GROUP 3 TRAVELING TOWER CRANE; MASTER MECHANIC; PILE DRIVING (WHEN 3 DRUMS ARE USED); TRUCK & CRAWLER CRANE, UP TO BUT NOT INCLUDING 150' OF BOOM, INCLUDING JIB; DERRICK (GUY & STIFFLEG); TOWER CRANE (STATIONARY) UP TO 200'; & ALL TERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT | $33.44 | $15.95 | $49.39 | ENGI0049-012 eff. 05/01/2012 |
| POWER EQUIPMENT OPERATOR GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & OVER, CONCRETE PUMP 164 FT BOOM | $34.85 | $15.95 | $50.80 | ENGI0049-012 eff. 05/01/2012 |
| POWER EQUIPMENT OPERATOR GROUP 1 HELICOPTER; TRUCK & CRAWLER CRANE WITH 200' OF BOOM & OVER, INCLUDING JIB ($.50 PREMIUM WITH 300' OF BOOM & OVER, INCLUDING JIB); & TOWER CRANE 250' & OVER | $35.19 | $15.95 | $51.14 | ENGI0049-012 eff. 05/01/2012 |
| IRONWORKER | $43.00 | $34.11 | $77.11 | IRON0512-004 eff. 04/30/2023 |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (MCLEOD COUNTY) | $16.26 | $9.68 | $25.94 | LABO0132-001 eff. 05/01/2008 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $19.17 | $15.79 | $34.96 | LABO0132-005 eff. 05/09/2016 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (MCLEOD COUNTY) | $21.88 | $15.79 | $37.67 | LABO0132-005 eff. 05/09/2016 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (MCLEOD COUNTY) | $21.97 | $15.79 | $37.76 | LABO0132-005 eff. 05/09/2016 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING "PATENT" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (MCLEOD COUNTY) | $21.17 | $15.79 | $36.96 | LABO0132-005 eff. 05/09/2016 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $20.84 | $16.57 | $37.41 | LABO0132-005 eff. 05/09/2016 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (MCLEOD COUNTY) | $23.54 | $16.57 | $40.11 | LABO0132-005 eff. 05/09/2016 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (MCLEOD COUNTY) | $23.64 | $16.57 | $40.21 | LABO0132-005 eff. 05/09/2016 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING "PATENT" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (MCLEOD COUNTY) | $22.84 | $16.57 | $39.41 | LABO0132-005 eff. 05/09/2016 |
| LABORER (ASBESTOS ABATEMENT) | $30.83 | $17.61 | $48.44 | LABO0132-008 eff. 01/01/2017 |
| PLASTER TENDER | $21.97 | $15.79 | $37.76 | LABO0132-017 eff. 05/09/2016 |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (SIBLEY COUNTY) | $28.25 | $16.20 | $44.45 | LABO0563-004 eff. 01/01/2021 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $16.35 | $13.94 | $30.29 | LABO0563-005 eff. 05/01/2012 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (SIBLEY COUNTY) | $19.06 | $13.94 | $33.00 | LABO0563-005 eff. 05/01/2012 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (SIBLEY COUNTY) | $19.15 | $13.94 | $33.09 | LABO0563-005 eff. 05/01/2012 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING "PATENT" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (SIBLEY COUNTY) | $18.35 | $13.94 | $32.29 | LABO0563-005 eff. 05/01/2012 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $18.04 | $14.70 | $32.74 | LABO0563-005 eff. 05/01/2012 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (SIBLEY COUNTY) | $20.74 | $14.70 | $35.44 | LABO0563-005 eff. 05/01/2012 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (SIBLEY COUNTY) | $20.84 | $14.70 | $35.54 | LABO0563-005 eff. 05/01/2012 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING "PATENT" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (SIBLEY COUNTY) | $20.04 | $14.70 | $34.74 | LABO0563-005 eff. 05/01/2012 |
| PAINTERS: SPRAY; STEEL; SANDBLASTER; SWING STAGE & EPOXY (MCLEOD) | $31.45 | $17.85 | $49.30 | PAIN0386-005 eff. 05/01/2012 |
| PAINTERS: BRUSH; ROLLER; & WALLPAPER HANGER (MCLEOD) | $31.45 | $17.85 | $49.30 | PAIN0386-005 eff. 05/01/2012 |
| DRYWALL: SANDER (MCLEOD) | $22.63 | $18.67 | $41.30 | PAIN0386-006 eff. 05/01/2012 |
| DRYWALL: FINISHER (MCLEOD) | $30.17 | $18.67 | $48.84 | PAIN0386-006 eff. 05/01/2012 |
| DRYWALL TAPER/FINISHER (SIBLEY COUNTY) | $19.00 | $25.79 | $44.79 | PAIN0681-003 eff. 05/05/2025 |
| PAINTERS: 4 STORIES: BRUSH & ROLLER (SIBLEY COUNTY) PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OTHER TOXIC MATERIALS - $0.25 PER HOUR ADDITIONAL | $35.28 | $25.49 | $60.77 | PAIN0681-009 eff. 05/01/2025 |
| PAINTERS: 1 TO 3 STORIES: BRUSH & ROLLER (SIBLEY COUNTY) PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OTHER TOXIC MATERIALS - $0.25 PER HOUR ADDITIONAL | $19.00 | $3.00 | $22.00 | PAIN0681-009 eff. 05/01/2025 |
| GLAZIER | $50.98 | $27.35 | $78.33 | PAIN1324-003 eff. 06/02/2025 |
| PLASTERER | $42.52 | $30.37 | $72.89 | PLAS0265-003 eff. 06/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $46.46 | $23.47 | $69.93 | PLAS0633-006 eff. 05/01/2023 |
PLUMBER (MCLEOD)Scope and notesFOOTNOTE: PAID HOLIDAY: LABOR DAY | $59.54 | $33.26 | $92.80 | PLUM0015-003 eff. 05/01/2025 |
PLUMBER: INCLUDES GAS FITTERSScope and notesFOOTNOTE: PAID HOLIDAY: LABOR DAY | $36.78 | $34.51 | $71.29 | PLUM0034-008 eff. 05/01/2025 |
| PIPEFITTER (SIBLEY COUNTY) | $37.05 | $30.27 | $67.32 | PLUM0455-009 eff. 05/01/2024 |
| PIPEFITTER (MCLEOD) | $48.33 | $40.46 | $88.79 | PLUM0539-003 eff. 05/01/2024 |
ROOFERScope and notesFOOTNOTE: PAID HOLIDAY - LABOR DAY | $48.32 | $25.54 | $73.86 | ROOF0096-007 eff. 05/05/2025 |
| SPRINKLER FITTER | $42.94 | $27.26 | $70.20 | SFMN0669-003 eff. 01/01/2025 |
SHEET METAL WORKERScope and notesFOOTNOTE: PAID HOLIDAY - LABOR DAY | $45.01 | $26.53 | $71.54 | SHEE0010-006 eff. 05/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.