Minnesota prevailing wage rates: MN20260020
Residential construction in Anoka, Carver, Dakota, Ramsey, Scott, Sherburne, Washington Counties.
MN20260020, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, SHERBURNE (EXCLUDING ST. CLOUD & EXTENDING 5 MILES BEYOND THE CITY LIMITS OF ST. CLOUD), WASHINGTON) | $40.63 | $28.42 | $69.05 | CARP0322-011 eff. 04/29/2024 |
| CARPENTER (SHERBURNE (NW PORTION EXTENDING 5 MILES BEYOND THE CITY LIMITS)) | $40.63 | $28.42 | $69.05 | CARP0322-013 eff. 04/29/2024 |
| CARPENTER (SHERBURNE (EXTREME NW PORTION, INCLUDING ST. CLOUD & EXTENDING 5 MILES BEYOND THE CITY LIMITS)) | $36.71 | $20.17 | $56.88 | CARP0930-014 eff. 04/29/2024 |
| ELECTRICIAN (ANOKA (EXCEPT ANOKA & FRIDLEY TOWNSHIPS & THE CITIES OF ANDOVER, ANOKA, COLUMBIA HEIGHTS, COON RAPIDS, FRIDLEY, HILLTOP, RAMSEY & SPRING LAKE PARK), DAKOTA, RAMSEY, SHERBURNE (EAST OF BECKER AND SANTIAGO TWPS), AND WASHINGTON COUNTIES) | $53.91 | $36.48 | $90.39 | ELEC0110-001 eff. 05/01/2024 |
| ELECTRICIAN (ANOKA (ANOKA & FRIDLEY TOWNSHIPS & THE CITIES OF ANDOVER, ANOKA, COLUMBIA HEIGHTS, COON RAPIDS, FRIDLEY, HILLTOP, RAMSEY & SPRING LAKE PARK), CARVER, SCOTT, SHERBURNE (EAST OF HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSISSIPPI RIVER)) | $59.00 | $35.79 | $94.79 | ELEC0292-001 eff. 05/01/2025 |
| ELECTRICIAN: ELECTRICAL CONTRACTS UNDER $5 MILLION: (SHERBURNE (WEST OF STATE HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSSISSIPPI RIVER)) | $43.67 | $22.35 | $66.02 | ELEC0292-023 eff. 07/01/2023 |
| ELECTRICIAN: ELECTRICAL CONTRACTS $5 MILLION AND OVER: (SHERBURNE (WEST OF STATE HWY 25 TO HWY 10 AND AN IMAGINARY LINE STRAIGHT WEST TO THE MISSSISSIPPI RIVER)) | $44.12 | $22.57 | $66.69 | ELEC0292-023 eff. 07/01/2023 |
| OPERATOR: POWER EQUIPMENT GROUP 8 OILER | $28.29 | $15.95 | $44.24 | ENGI0049-059 eff. 05/01/2012 |
| OPERATOR: POWER EQUIPMENT GROUP 7 SELF PROPELLED VIBRATING PACKER | $30.30 | $15.95 | $46.25 | ENGI0049-059 eff. 05/01/2012 |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE | $31.42 | $15.95 | $47.37 | ENGI0049-059 eff. 05/01/2012 |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 | $32.93 | $15.95 | $48.88 | ENGI0049-059 eff. 05/01/2012 |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE | $33.10 | $15.95 | $49.05 | ENGI0049-059 eff. 05/01/2012 |
| OPERATOR: POWER EQUIPMENT GROUP 3 DRAGLINE | $33.44 | $15.95 | $49.39 | ENGI0049-059 eff. 05/01/2012 |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE | $34.85 | $15.95 | $50.80 | ENGI0049-059 eff. 05/01/2012 |
| IRONWORKER: STRUCTURAL | $46.35 | $36.86 | $83.21 | IRON0512-001 eff. 04/04/2025 |
| LABORER GROUP 2 BOTTOM PERSON, MASON TENDER (BRICK, CEMENT/CONCRETE), PIPELAYER (DAKOTA, RAMSEY, SCOTT, AND WASHINGTON COUNTIES) | $32.91 | $17.44 | $50.35 | LABO0132-035 eff. 05/09/2016 |
| LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER (BRICK, CEMENT/CONCRETE), PLASTER TENDER, TOP PERSON (DAKOTA, RAMSEY, SCOTT, AND WASHINGTON COUNTIES) | $32.41 | $17.44 | $49.85 | LABO0132-035 eff. 05/09/2016 |
| LABORER GROUP 2 BOTTOM PERSON, MASON TENDER (BRICK, CEMENT/CONCRETE), PIPELAYER | $28.96 | $15.82 | $44.78 | LABO0563-044 eff. 05/01/2012 |
| LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER (BRICK, CEMENT/CONCRETE), PLASTER TENDER, TOP PERSON | $28.46 | $15.82 | $44.28 | LABO0563-044 eff. 05/01/2012 |
| PAINTER: SPRAY (DAKOTA, RAMSEY, WASHINGTON COUNTIES) | $31.89 | $17.41 | $49.30 | PAIN0061-001 eff. 05/01/2012 |
| PAINTER: SPRAY (ANOKA, CARVER, SCOTT) | $31.45 | $17.85 | $49.30 | PAIN0386-019 eff. 05/01/2012 |
| PAINTER: SPRAY (SHERBURNE (SOUTH AND EAST OF A LINE DRAWN BETWEEN THE TOWN OF SANTIAGO IN SHERBURNE COUNTY AND THE TOWN OF CLEARWATER IN WRIGHT COUNTY)) | $31.45 | $17.85 | $49.30 | PAIN0386-022 eff. 05/01/2012 |
| PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE | $24.91 | $13.31 | $38.22 | PAIN0884-028 eff. 06/01/2010 |
PLUMBER (ANOKA, CARVER, SCOTT & SHERBURNE (EAST OF A LINE RUNNING NORTHEASTERLY FROM THE POINT OF WRIGHT COUNTY THAT LIES FURTHEST NORTH TO THAT PONT OF MILLE LACS COUNTY THAT IS SOUTH BY WEST))Scope and notesFOOTNOTE: PAID HOLIDAY: LABOR DAY | $59.54 | $33.26 | $92.80 | PLUM0015-018 eff. 05/01/2025 |
PLUMBER (SHERBURNE (REMAINING WESTERN PORTION))Scope and notesFOOTNOTE: PAID HOLIDAY: LABOR DAY | $53.16 | $32.21 | $85.37 | PLUM0015-025 eff. 05/01/2025 |
PLUMBER (DAKOTA, RAMSEY, WASHINGTON).Scope and notesFOOTNOTE: PAID HOLIDAY: LABOR DAY | $50.23 | $37.52 | $87.75 | PLUM0034-017 eff. 05/01/2025 |
| PIPEFITTER (DAKOTA, RAMSEY, WASHINGTON) | $51.70 | $42.45 | $94.15 | PLUM0455-002 eff. 05/01/2025 |
| PIPEFITTER (SHERBURNE COUNTY (WEST OF A LINE RUNNING NORTHEASTERLY FROM THE NORTHERN POINT OF WRIGHT COUNTY TO THE SOUTHWESTERN TIP OF MILLE LACS COUNTY)) | $48.33 | $40.46 | $88.79 | PLUM0539-007 eff. 05/01/2024 |
| PIPEFITTER (ANOKA, CARVER, SCOTT, SHERBURNE (EAST OF A LINE RUNNING NORTHEASTERLY FROM THE POINT OF WRIGHT COUNTY THAT LIES FURTHEST NORTH TO THAT PONT OF MILLE LACS COUNTY THAT IS SOUTH BY WEST)) | $48.33 | $40.46 | $88.79 | PLUM0539-015 eff. 05/01/2024 |
ROOFER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, WASHINGTON)Scope and notesFOOTNOTE: PAID HOLIDAY: LABOR DAY | $48.32 | $25.54 | $73.86 | ROOF0096-051 eff. 05/05/2025 |
| ROOFER (SHERBURNE) | $39.01 | $21.99 | $61.00 | ROOF0096-053 eff. 06/01/2023 |
SHEET METAL WORKER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, WASHINGTON)Scope and notesFOOTNOTE: PAID HOLIDAY: LABOR DAY | $45.01 | $26.53 | $71.54 | SHEE0010-087 eff. 05/01/2025 |
| SHEET METAL WORKER (SHERBURNE) | $35.60 | $25.14 | $60.74 | SHEE0010-088 eff. 04/28/2025 |
| LABORER: LANDSCAPE | $11.50 EO 13658 minimum $13.65 may apply | $0.00 | $11.50 | SUMN2009-057 eff. 07/27/2009 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.