PrevailCrew

Minnesota prevailing wage rates: MN20260024

Residential construction in Clay, Houston, Polk Counties.

MN20260024, modification 2, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

No existing rate changed amount.

5 classifications added, 5 removed or reworded
  • removed LABORER (Projects $760,000 & over:): GROUP 1 was $28.07 + $21.74 fringe
  • removed LABORER (Projects $760,000 & over:): GROUP 2 was $28.47 + $21.74 fringe
  • removed LABORER (Projects under $760,000:): GROUP 1 was $23.86 + $21.74 fringe
  • removed LABORER (Projects under $760,000:): GROUP 2 was $24.20 + $21.74 fringe
  • added LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) $28.07 + $21.74 fringe
  • added LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) $23.86 + $21.74 fringe
  • added LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) $28.47 + $21.74 fringe
  • added LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) $24.20 + $21.74 fringe
  • added OPERATOR: POWER EQUIPMENT GROUP 8OILER. (HOUSTON) $28.29 + $15.85 fringe
  • removed OPERATOR: Power Equipment: GROUP 8 was $28.29 + $15.85 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

MN20260024 wage rates
ClassificationBaseFringeTotalRate ID
CARPENTER (HOUSTON)$36.71$20.17$56.88CARP1382-030
eff. 04/29/2024
CARPENTER (CLAY, POLK)$31.14$20.69$51.83CARP1934-004
eff. 04/29/2024
ELECTRICIAN (HOUSTON)$40.25$23.32$63.57ELEC0343-017
eff. 09/01/2025
ELECTRICIAN (CLAY, POLK)$37.41$18.61$56.02ELEC1426-019
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT GROUP 8 OILER. (CLAY, POLK)$26.80$15.85$42.65ENGI0049-062
eff. 05/01/2011
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (CLAY, POLK)$29.75$15.85$45.60ENGI0049-062
eff. 05/01/2011
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2. (CLAY, POLK)$31.17$15.85$47.02ENGI0049-062
eff. 05/01/2011
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (CLAY, POLK)$31.33$15.85$47.18ENGI0049-062
eff. 05/01/2011
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (CLAY, POLK)$32.98$15.85$48.83ENGI0049-062
eff. 05/01/2011
OPERATOR: POWER EQUIPMENT GROUP 8OILER. (HOUSTON)$28.29$15.85$44.14ENGI0049-063
eff. 05/01/2011
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (HOUSTON)$31.42$15.85$47.27ENGI0049-063
eff. 05/01/2011
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2.(HOUSTON)$32.93$15.85$48.78ENGI0049-063
eff. 05/01/2011
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (HOUSTON)$33.10$15.85$48.95ENGI0049-063
eff. 05/01/2011
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (HOUSTON)$34.85$15.85$50.70ENGI0049-063
eff. 05/01/2011
IRONWORKER: STRUCTURAL (CLAY, POLK)$42.89$36.86$79.75IRON0512-039
eff. 04/04/2025
IRONWORKER: STRUCTURAL (HOUSTON)$46.35$36.86$83.21IRON0512-040
eff. 04/04/2025
LABORERS: (3) MASON TENDER (BRICK, CEMENT/CONCRETE) (HOUSTON)$25.42$17.52$42.94LABO0405-016
eff. 05/01/2019
LABORERS: (2) PIPELAYER (HOUSTON)$27.95$17.52$45.47LABO0405-016
eff. 05/01/2019
LABORERS: (1) COMMON OR GENERAL (HOUSTON)$27.25$17.52$44.77LABO0405-016
eff. 05/01/2019
LABORERS GROUP 2 PIPELAYER (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR$20.96$14.97$35.93LABO0563-024
eff. 05/01/2012
LABORERS GROUP 1 COMMON OR GENERAL; MASON TENDER (BRICK, CEMENT/CONCRETE) (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR$20.21$14.97$35.18LABO0563-024
eff. 05/01/2012
LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (CLAY (CITY OF MOORHEAD) COUNTY$18.60$13.44$32.04LABO0563-025
eff. 05/01/2012
LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (POLK (CITY OF EAST GRAND FORKS) COUNTY)$20.87$17.39$38.26LABO1097-006
eff. 05/01/2017
LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:)$24.20$21.74$45.94LABO1097-021
eff. 05/01/2023
LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over)$28.47$21.74$50.21LABO1097-021
eff. 05/01/2023
LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:)$23.86$21.74$45.60LABO1097-021
eff. 05/01/2023
LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over)$28.07$21.74$49.81LABO1097-021
eff. 05/01/2023
PAINTER: SPRAY (HOUSTON)$19.00$3.00$22.00PAIN0681-024
eff. 05/05/2025
PAINTER: SPRAY (CLAY, POLK)$22.61$8.66$31.27PAIN0884-027
eff. 06/01/2010
PLUMBER (HOUSTON)$47.50$30.33$77.83PLUM0006-012
eff. 05/01/2024
PLUMBER (CLAY, POLK)$48.74$21.34$70.08PLUM0011-026
eff. 05/01/2025
ROOFER (CLAY, POLK)$36.01$16.72$52.73ROOF0096-059
eff. 05/01/2017
ROOFER (HOUSTON)$32.71$16.99$49.70ROOF0096-060
eff. 06/01/2024
SHEET METAL WORKER (POLK)$35.37$21.12$56.49SHEE0010-089
eff. 06/02/2025
SHEET METAL WORKER (CLAY)$35.76$23.17$58.93SHEE0010-090
eff. 06/01/2025
SHEET METAL WORKER (HOUSTON)$40.03$28.95$68.98SHEE0010-091
eff. 05/01/2025
LABORER: LANDSCAPE$11.50
EO 13658 minimum $13.65 may apply
$0.00$11.50SUMN2009-061
eff. 07/27/2009

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.