Minnesota prevailing wage rates: MN20260024
Residential construction in Clay, Houston, Polk Counties.
MN20260024, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No existing rate changed amount.
5 classifications added, 5 removed or reworded
- removed LABORER (Projects $760,000 & over:): GROUP 1 was $28.07 + $21.74 fringe
- removed LABORER (Projects $760,000 & over:): GROUP 2 was $28.47 + $21.74 fringe
- removed LABORER (Projects under $760,000:): GROUP 1 was $23.86 + $21.74 fringe
- removed LABORER (Projects under $760,000:): GROUP 2 was $24.20 + $21.74 fringe
- added LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) $28.07 + $21.74 fringe
- added LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) $23.86 + $21.74 fringe
- added LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) $28.47 + $21.74 fringe
- added LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) $24.20 + $21.74 fringe
- added OPERATOR: POWER EQUIPMENT GROUP 8OILER. (HOUSTON) $28.29 + $15.85 fringe
- removed OPERATOR: Power Equipment: GROUP 8 was $28.29 + $15.85 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (HOUSTON) | $36.71 | $20.17 | $56.88 | CARP1382-030 eff. 04/29/2024 |
| CARPENTER (CLAY, POLK) | $31.14 | $20.69 | $51.83 | CARP1934-004 eff. 04/29/2024 |
| ELECTRICIAN (HOUSTON) | $40.25 | $23.32 | $63.57 | ELEC0343-017 eff. 09/01/2025 |
| ELECTRICIAN (CLAY, POLK) | $37.41 | $18.61 | $56.02 | ELEC1426-019 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT GROUP 8 OILER. (CLAY, POLK) | $26.80 | $15.85 | $42.65 | ENGI0049-062 eff. 05/01/2011 |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (CLAY, POLK) | $29.75 | $15.85 | $45.60 | ENGI0049-062 eff. 05/01/2011 |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2. (CLAY, POLK) | $31.17 | $15.85 | $47.02 | ENGI0049-062 eff. 05/01/2011 |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (CLAY, POLK) | $31.33 | $15.85 | $47.18 | ENGI0049-062 eff. 05/01/2011 |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (CLAY, POLK) | $32.98 | $15.85 | $48.83 | ENGI0049-062 eff. 05/01/2011 |
| OPERATOR: POWER EQUIPMENT GROUP 8OILER. (HOUSTON) | $28.29 | $15.85 | $44.14 | ENGI0049-063 eff. 05/01/2011 |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (HOUSTON) | $31.42 | $15.85 | $47.27 | ENGI0049-063 eff. 05/01/2011 |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2.(HOUSTON) | $32.93 | $15.85 | $48.78 | ENGI0049-063 eff. 05/01/2011 |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (HOUSTON) | $33.10 | $15.85 | $48.95 | ENGI0049-063 eff. 05/01/2011 |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (HOUSTON) | $34.85 | $15.85 | $50.70 | ENGI0049-063 eff. 05/01/2011 |
| IRONWORKER: STRUCTURAL (CLAY, POLK) | $42.89 | $36.86 | $79.75 | IRON0512-039 eff. 04/04/2025 |
| IRONWORKER: STRUCTURAL (HOUSTON) | $46.35 | $36.86 | $83.21 | IRON0512-040 eff. 04/04/2025 |
| LABORERS: (3) MASON TENDER (BRICK, CEMENT/CONCRETE) (HOUSTON) | $25.42 | $17.52 | $42.94 | LABO0405-016 eff. 05/01/2019 |
| LABORERS: (2) PIPELAYER (HOUSTON) | $27.95 | $17.52 | $45.47 | LABO0405-016 eff. 05/01/2019 |
| LABORERS: (1) COMMON OR GENERAL (HOUSTON) | $27.25 | $17.52 | $44.77 | LABO0405-016 eff. 05/01/2019 |
| LABORERS GROUP 2 PIPELAYER (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | $20.96 | $14.97 | $35.93 | LABO0563-024 eff. 05/01/2012 |
| LABORERS GROUP 1 COMMON OR GENERAL; MASON TENDER (BRICK, CEMENT/CONCRETE) (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR | $20.21 | $14.97 | $35.18 | LABO0563-024 eff. 05/01/2012 |
| LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (CLAY (CITY OF MOORHEAD) COUNTY | $18.60 | $13.44 | $32.04 | LABO0563-025 eff. 05/01/2012 |
| LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (POLK (CITY OF EAST GRAND FORKS) COUNTY) | $20.87 | $17.39 | $38.26 | LABO1097-006 eff. 05/01/2017 |
| LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) | $24.20 | $21.74 | $45.94 | LABO1097-021 eff. 05/01/2023 |
| LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) | $28.47 | $21.74 | $50.21 | LABO1097-021 eff. 05/01/2023 |
| LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:) | $23.86 | $21.74 | $45.60 | LABO1097-021 eff. 05/01/2023 |
| LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over) | $28.07 | $21.74 | $49.81 | LABO1097-021 eff. 05/01/2023 |
| PAINTER: SPRAY (HOUSTON) | $19.00 | $3.00 | $22.00 | PAIN0681-024 eff. 05/05/2025 |
| PAINTER: SPRAY (CLAY, POLK) | $22.61 | $8.66 | $31.27 | PAIN0884-027 eff. 06/01/2010 |
| PLUMBER (HOUSTON) | $47.50 | $30.33 | $77.83 | PLUM0006-012 eff. 05/01/2024 |
| PLUMBER (CLAY, POLK) | $48.74 | $21.34 | $70.08 | PLUM0011-026 eff. 05/01/2025 |
| ROOFER (CLAY, POLK) | $36.01 | $16.72 | $52.73 | ROOF0096-059 eff. 05/01/2017 |
| ROOFER (HOUSTON) | $32.71 | $16.99 | $49.70 | ROOF0096-060 eff. 06/01/2024 |
| SHEET METAL WORKER (POLK) | $35.37 | $21.12 | $56.49 | SHEE0010-089 eff. 06/02/2025 |
| SHEET METAL WORKER (CLAY) | $35.76 | $23.17 | $58.93 | SHEE0010-090 eff. 06/01/2025 |
| SHEET METAL WORKER (HOUSTON) | $40.03 | $28.95 | $68.98 | SHEE0010-091 eff. 05/01/2025 |
| LABORER: LANDSCAPE | $11.50 EO 13658 minimum $13.65 may apply | $0.00 | $11.50 | SUMN2009-061 eff. 07/27/2009 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.