Minnesota prevailing wage rates: MN20260026
Residential construction in Cook, Koochiching, Lake Counties.
MN20260026, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $53.18 | $23.83 | $77.01 | ASBE0049-006 eff. 05/05/2025 |
| BOILERMAKER | $48.00 | $31.14 | $79.14 | BOIL0647-002 eff. 01/01/2025 |
| MARBLE SETTER | $45.47 | $26.33 | $71.80 | BRMN0001-004 eff. 05/01/2023 |
| TILE LAYER (KOOCHICHING) | $32.54 | $30.66 | $63.20 | BRMN0001-017 eff. 05/01/2023 |
| TILE FINISHER | $25.23 | $22.05 | $47.28 | BRMN0001-021 eff. 05/01/2023 |
| BRICKLAYER (COOK, LAKE) | $42.19 | $31.19 | $73.38 | BRMN0003-002 eff. 05/01/2023 |
| TILE LAYER (COOK, LAKE) | $32.54 | $30.66 | $63.20 | BRMN0003-003 eff. 05/01/2023 |
| BRICKLAYER (KOOCHICHING COUNTY) | $39.35 | $26.73 | $66.08 | BRMN0015-002 eff. 05/01/2023 |
| CEMENT MASON/CONCRETE FINISHER (KOOCHICHING COUNTY) | $39.35 | $26.73 | $66.08 | BRMN0015-004 eff. 05/01/2023 |
| SOFT FLOOR LAYER | $43.25 | $24.19 | $67.44 | CARP0068-003 eff. 05/01/2024 |
| CARPENTER (COOK, LAKE (SOUTH PART, EXCLUDING SAWBILL LANDING)) | $31.52 | $17.64 | $49.16 | CARP0361-001 eff. 04/29/2024 |
| LATHER | $33.55 | $26.08 | $59.63 | CARP0361-022 eff. 05/02/2022 |
| CARPENTER (KOOCHICHING, LAKE (NORTHERN PART, INCLUDING SAWBILL LANDING)) | $28.29 | $22.88 | $51.17 | CARP0606-011 eff. 04/29/2024 |
| MILLWRIGHT (COOK, KOOCHICHING, LAKE) | $40.55 | $27.36 | $67.91 | CARP1348-005 eff. 05/01/2024 |
COMMUNICATIONS SYSTEM, SOUND, SIGNAL & COMMUNICATIONS WORK: TECHNICIAN (INSTALLATION OF CONTROLLER).Scope and notesFOOTNOTES: A. 1 YEAR SERVICE - 5 DAYS PAID VACATION; 2 YEARS SERVICE - 10 DAYS PAID VACATION; 5 YEARS SERVICE - 12 DAYS PAID VACATION; 7 YEARS SERVICE - 14 DAYS PAID VACATION; 9 YEARS SERVICE - 16 DAYS PAID VACATION; 11 YEARS SERVICE - 18 DAYS PAID VACATION; 12 YEARS SERVICE - 20 DAYS PAID VACATION B. 8 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; 4TH OF JULY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; THE NORMAL WORK DAY PRECEDING CHRISTMAS DAY; & CHRISTMAS DAY | $38.97 | $17.14 | $56.11 | ELEC0110-006 eff. 07/01/2018 |
COMMUNICATIONS SYSTEM, SOUND, SIGNAL & COMMUNICATIONS WORK: INSTALLER.Scope and notesFOOTNOTES: A. 1 YEAR SERVICE - 5 DAYS PAID VACATION; 2 YEARS SERVICE - 10 DAYS PAID VACATION; 5 YEARS SERVICE - 12 DAYS PAID VACATION; 7 YEARS SERVICE - 14 DAYS PAID VACATION; 9 YEARS SERVICE - 16 DAYS PAID VACATION; 11 YEARS SERVICE - 18 DAYS PAID VACATION; 12 YEARS SERVICE - 20 DAYS PAID VACATION B. 8 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; 4TH OF JULY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; THE NORMAL WORK DAY PRECEDING CHRISTMAS DAY; & CHRISTMAS DAY | $27.30 | $14.31 | $41.61 | ELEC0110-006 eff. 07/01/2018 |
| ELECTRICIAN (COOK, LAKE) | $47.46 | $33.34 | $80.80 | ELEC0242-019 eff. 06/01/2025 |
| ELECTRICIANS:: (2) ALL OTHER WORK (KOOCHICHING) | $45.83 | $32.90 | $78.73 | ELEC0294-014 eff. 06/01/2025 |
| ELECTRICIANS:: (1) UP TO & INCLUDING 6-PLEX UNDER ONE ROOF (KOOCHICHING) | $39.18 | $29.68 | $68.86 | ELEC0294-014 eff. 06/01/2025 |
ELEVATOR MECHANICScope and notesFOOTNOTE: A.PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $62.52 | $38.44 | $100.96 | ELEV0009-001 eff. 01/01/2025 |
| OPERATOR: POWER EQUIPMENT GROUP 8 MECHANICAL SPACE HEATER (TEMPORARY HEAT); OILER OR GREASER; & ELEVATOR OPERATOR | $39.88 | $25.20 | $65.08 | ENGI0049-003 eff. 05/01/2023 |
| OPERATOR: POWER EQUIPMENT GROUP 7 AIR COMPRESSOR OPERATOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR OPERATOR; BRAKEMAN; PICK-UP SWEEPER (1 CU. YD. & OVER HOPPER CAPACITY); TRUCK CRANE OILER; & WELDING MACHINE OPERATOR, FIREMAN TEMPORARY HEAT | $42.06 | $25.20 | $67.26 | ENGI0049-003 eff. 05/01/2023 |
| OPERATOR: POWER EQUIPMENT GROUP 6 CONCRETE BATCH PLANT OPERATOR; GUNITE OPERATOR; TRACTOR OPERATOR D2 OR SIMILAR SIZE; & FRONT END LOADER OPERATOR, UP TO 1 CU. YD | $43.28 | $25.20 | $68.48 | ENGI0049-003 eff. 05/01/2023 |
| OPERATOR: POWER EQUIPMENT GROUP 5 AIR COMPRESSOR OPERATOR 450 CFM OR OVER (2 OR MORE MACHINES); PUMP OPERATOR AND/OR CONVEYOR OPERATOR (2 OR MORE MACHINES); MECHANIC; PUMPCRETE OR COMPLACO TYPE MACHINE OPERATOR; FORKLIFT; BOOM TRUCK UP TO 100 FT.; CONCRETE MIXER OPERATOR; DRILL RIG - HEAVY ROTARY OR CHURN WHEN USED FOR CAISSON DRILLING FOR ELEVATOR CYLINDER OR BUILDING CONSTRUCTION; FRONT END LOADER (OVER 1 CU. YD.); HOIST ENGINEER (1 OR 2 DRUMS); STRADDLE CARRIER OPERATOR; POWER PLANT ENGINEER (100 KW & OVER ON MULTIPLES EQUAL TO 100KW & OVER); TRACTOR OPERATOR OVER D2; & WELL POINT PUMP OPERATOR | $44.91 | $25.20 | $70.11 | ENGI0049-003 eff. 05/01/2023 |
| OPERATOR: POWER EQUIPMENT GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER (3 DRUMS OR MORE); LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR (INSIDE BUILDING PERIMETER); & TRACTOR OPERATOR WITH BOOM | $46.99 | $25.20 | $72.19 | ENGI0049-003 eff. 05/01/2023 |
| OPERATOR: POWER EQUIPMENT GROUP 3 TRAVELING TOWER CRANE; MASTER MECHANIC; PILE DRIVING OPERATOR (WHEN 3 DRUMS ARE USED); TRUCK & CRAWLER CRANE, UP TO BUT NOT INCLUDING 150' OF BOOM, INCLUDING JIB; DERRICK (GUY & STIFFLEG); TOWER CRANE (STATIONARY) UP TO 200'; & ALLTERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT | $47.35 | $25.20 | $72.55 | ENGI0049-003 eff. 05/01/2023 |
| OPERATOR: POWER EQUIPMENT GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & OVER, CONCRETE PUMP 164 FT BOOM | $48.88 | $25.20 | $74.08 | ENGI0049-003 eff. 05/01/2023 |
| OPERATOR: POWER EQUIPMENT GROUP 1 HELICOPTER OPERATOR; TRUCK & CRAWLER CRANE WITH 200' OF BOOM & OVER, INCLUDING JIB ($.50 PREMIUM WITH 300' OF BOOM & OVER, INCLUDING JIB); & TOWER CRANE 250' & OVER | $49.25 | $25.20 | $74.45 | ENGI0049-003 eff. 05/01/2023 |
| IRONWORKER | $39.14 | $34.11 | $73.25 | IRON0512-037 eff. 04/30/2023 |
| LANDSCAPE LABORER (COOK AND LAKE COUNTIES) | $26.89 | $19.31 | $46.20 | LABO1091-003 eff. 05/01/2022 |
| LABORERS: GROUP 4 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTERS OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC.; ASBESTOS ABATEMENT WORKER; & HAZARDOUS WASTE WORKER: (COOK, LAKE) | $30.62 | $21.69 | $52.31 | LABO1091-017 eff. 05/01/2022 |
| LABORERS: GROUP 3 CAISSON WORK; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK - OPEN DITCH OR EXCAVATION 8' BELOW GRADE; UNDERPINNING; & HOD CARRIER (COOK, LAKE) | $30.32 | $21.69 | $52.01 | LABO1091-017 eff. 05/01/2022 |
| LABORERS: GROUP 2 CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING, EXCLUDING REMODELING; GUNITE, SANDBLASTING MACHINE OPERATOR; MASON TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOLS,JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING "PATENT" SCAFFOLDING); TORCHMAN - GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE; & HYDROBLAST (COOK, LAKE) | $30.07 | $21.69 | $51.76 | LABO1091-017 eff. 05/01/2022 |
| LABORERS: GROUP 1 GENERAL; CARPENTER TENDER; CONCRETE LABORER; DAMP PROOFER BELOW GRADE; DRILL RUNNER TENDER; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; MATERIAL HANDLER (ALL TYPES POWER BUGGY); FIRE CONTROL; ASBESTOS REMOVAL; & HAZARDOUS WASTE, FLAG PERSON (COOK, LAKE) | $29.92 | $21.69 | $51.61 | LABO1091-017 eff. 05/01/2022 |
| LANDSCAPE LABORER (KOOCHICHING COUNTY) | $26.89 | $19.31 | $46.20 | LABO1097-001 eff. 05/01/2022 |
| LABORER GROUP 4 (KOOCHICHING) | $22.62 | $16.25 | $38.87 | LABO1097-019 eff. 05/01/2012 |
| LABORER GROUP 3 (KOOCHICHING) | $21.32 | $16.25 | $37.57 | LABO1097-019 eff. 05/01/2012 |
| LABORER GROUP 2 (KOOCHICHING) | $21.02 | $16.25 | $37.27 | LABO1097-019 eff. 05/01/2012 |
| LABORER GROUP 1 (KOOCHICHING) | $20.62 | $16.25 | $36.87 | LABO1097-019 eff. 05/01/2012 |
| PAINTER (PAPERHANGING; SPRAY; STEEL; TAPING; & LEAD BASE PAINT REMOVAL & ABATEMENT WITH OTHER THAN BASIC HAND TOOLS) | $28.96 | $16.35 | $45.31 | PAIN0106-017 eff. 05/02/2016 |
| PAINTER (BRUSH; ROLLER; & LEAD BASE PAINT REMOVAL & ABATEMENT WITH BASIC HAND TOOLS SUCH AS SCRAPERS) | $28.36 | $16.35 | $44.71 | PAIN0106-017 eff. 05/02/2016 |
GLAZIER:Scope and notesFOOTNOTE: 1 TO 4 YEARS' SERVICE - 1 WEEK'S PAID VACATION; 5 TO 11 YEARS SERVICE - 2 WEEKS PAID VACATION; 11 OR MORE YEARS SERVICE - 3 WEEKS PAID VACATION | $30.17 | $17.47 | $47.64 | PAIN0106-018 eff. 05/02/2016 |
| PLASTERER (KOOCHICHING) | $30.72 | $18.33 | $49.05 | PLAS0633-047 eff. 05/01/2023 |
| PLASTERER (COOK, LAKE) | $38.24 | $23.23 | $61.47 | PLAS0633-050 eff. 05/01/2023 |
| CEMENT MASON/CONCRETE FINISHER (COOK, LAKE) | $39.91 | $21.63 | $61.54 | PLAS0633-065 eff. 05/01/2023 |
| PLUMBER, PIPEFITTER, STEAMFITTER (COOK (A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR), LAKE (A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR)S) | $52.24 | $27.56 | $79.80 | PLUM0011-024 eff. 05/05/2025 |
| PLUMBER, PIPEFITTER, STEAMFITTER (COOK (EXCEPT A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR), KOOCHICHING, LAKE (EXCEPT A STRIP 20 MILES INLAND ALONG THE SHORES OF LAKE SUPERIOR)) | $48.55 | $29.33 | $77.88 | PLUM0589-010 eff. 05/01/2025 |
| ROOFER (COOK, LAKE) | $45.12 | $23.15 | $68.27 | ROOF0096-049 eff. 07/07/2025 |
| ROOFER (KOOCHICHING) | $40.39 | $20.53 | $60.92 | ROOF0096-050 eff. 04/28/2025 |
| SPRINKLER FITTER | $42.94 | $27.26 | $70.20 | SFMN0669-001 eff. 01/01/2025 |
| SHEET METAL WORKER (COOK, LAKE) | $33.36 | $24.25 | $57.61 | SHEE0010-085 eff. 05/01/2025 |
| SHEET METAL WORKER (KOOCHICHING) | $29.85 | $24.33 | $54.18 | SHEE0010-086 eff. 05/01/2025 |
| TRUCK DRIVER GROUP 4 DUMPMAN, FARM TRACTOR, SINGLE OR 2 AXLE TRUCK | $35.79 | $24.13 | $59.92 | TEAM0346-001 eff. 05/01/2025 |
| TRUCK DRIVER GROUP 3 FORK LIFT, MECHANIC, TANDEM OR 3 AXLE TRUCK | $36.06 | $24.13 | $60.19 | TEAM0346-001 eff. 05/01/2025 |
| TRUCK DRIVER GROUP 2 READY MIX, TRACTOR TRAILOR | $36.27 | $24.13 | $60.40 | TEAM0346-001 eff. 05/01/2025 |
| TRUCK DRIVER GROUP 1 BOOM TRUCK | $37.95 | $24.13 | $62.08 | TEAM0346-001 eff. 05/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.