Mississippi prevailing wage rates: MS20260136
Highway construction in Lamar County.
MS20260136, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $14.36 | $0.00 | $14.36 | SUMS2010-059 eff. 08/04/2014 |
| TRUCK DRIVER: DUMP TRUCK (ALL TYPES) | $14.26 | $0.00 | $14.26 | SUMS2010-059 eff. 08/04/2014 |
| TRUCK DRIVER: WATER TRUCK | $17.08 | $0.00 | $17.08 | SUMS2010-059 eff. 08/04/2014 |
| TRUCK DRIVER: MECHANIC | $12.31 EO 13658 minimum $13.65 may apply | $0.00 | $12.31 | SUMS2010-059 eff. 08/04/2014 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.07 | $0.00 | $14.07 | SUMS2010-059 eff. 08/04/2014 |
| TRUCK DRIVER: FLATBED TRUCK | $14.72 | $0.00 | $14.72 | SUMS2010-059 eff. 08/04/2014 |
| SURVEYOR (STAKING, MARKING AND BRUSH CLEARING) | $11.56 EO 13658 minimum $13.65 may apply | $0.00 | $11.56 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: TRACTOR | $10.71 EO 13658 minimum $13.65 may apply | $0.00 | $10.71 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: SCRAPER | $14.00 | $0.00 | $14.00 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: ROLLER (ALL TYPES) | $10.82 EO 13658 minimum $13.65 may apply | $0.00 | $10.82 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $14.67 | $0.00 | $14.67 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: OILER | $12.22 EO 13658 minimum $13.65 may apply | $0.00 | $12.22 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: MILLING MACHINE | $12.83 EO 13658 minimum $13.65 may apply | $0.00 | $12.83 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: MECHANIC | $13.00 EO 13658 minimum $13.65 may apply | $0.00 | $13.00 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: LOADER | $13.99 | $0.00 | $13.99 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: GRADER/BLADE | $15.60 | $0.00 | $15.60 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: DISTRIBUTOR | $11.46 EO 13658 minimum $13.65 may apply | $0.00 | $11.46 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: CRANE | $14.80 | $0.00 | $14.80 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: CONCRETE SAW | $14.55 | $0.00 | $14.55 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: BULLDOZER | $16.99 | $0.00 | $16.99 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: BROOM/SWEEPER | $10.73 EO 13658 minimum $13.65 may apply | $0.00 | $10.73 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $11.86 EO 13658 minimum $13.65 may apply | $0.00 | $11.86 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.36 | $0.00 | $16.36 | SUMS2010-059 eff. 08/04/2014 |
| OPERATOR: ASPHALT SPREADER | $14.71 | $0.00 | $14.71 | SUMS2010-059 eff. 08/04/2014 |
| LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $13.69 | $0.00 | $13.69 | SUMS2010-059 eff. 08/04/2014 |
| LABORER: PIPELAYER | $14.50 | $0.00 | $14.50 | SUMS2010-059 eff. 08/04/2014 |
| LABORER: LUTEMAN | $12.88 EO 13658 minimum $13.65 may apply | $0.00 | $12.88 | SUMS2010-059 eff. 08/04/2014 |
| LABORER: GRADE CHECKER | $14.82 | $0.00 | $14.82 | SUMS2010-059 eff. 08/04/2014 |
| LABORER: FLAGGER | $11.42 EO 13658 minimum $13.65 may apply | $0.00 | $11.42 | SUMS2010-059 eff. 08/04/2014 |
| LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING AND SPREADING; AND MASON TENDING CEMENT/CONCRETE | $11.00 EO 13658 minimum $13.65 may apply | $0.00 | $11.00 | SUMS2010-059 eff. 08/04/2014 |
| IRONWORKER, REINFORCING | $16.44 | $0.00 | $16.44 | SUMS2010-059 eff. 08/04/2014 |
| INSTALLER: GUARDRAIL | $12.39 EO 13658 minimum $13.65 may apply | $0.00 | $12.39 | SUMS2010-059 eff. 08/04/2014 |
| INSTALLER - SIGN | $12.19 EO 13658 minimum $13.65 may apply | $0.00 | $12.19 | SUMS2010-059 eff. 08/04/2014 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK) | $14.55 | $0.00 | $14.55 | SUMS2010-059 eff. 08/04/2014 |
| ELECTRICIAN | $26.68 | $0.00 | $26.68 | SUMS2010-059 eff. 08/04/2014 |
| CEMENT MASON/CONCRETE FINISHER | $11.54 EO 13658 minimum $13.65 may apply | $1.63 | $13.17 | SUMS2010-059 eff. 08/04/2014 |
| CARPENTER (FORM WORK ONLY) | $12.72 EO 13658 minimum $13.65 may apply | $0.00 | $12.72 | SUMS2010-059 eff. 08/04/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.