Missouri prevailing wage rates: MO20260013
Building construction in Lawrence County.
MO20260013, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed PAINTER: Brush & Roller Only was $19.75 + $11.76 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 | $45.97 | ASBE0063-002 eff. 11/01/2024 |
| BRICKLAYER | $33.67 | $19.48 | $53.15 | BRMO0015-004 eff. 04/01/2023 |
| TILE SETTER | $26.47 | $14.89 | $41.36 | BRMO0015-018 eff. 06/01/2023 |
| CARPENTER (DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY) | $29.50 | $21.50 | $51.00 | CARP0311-004 eff. 05/01/2024 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) | $32.25 | $20.81 | $53.06 | ELEC0095-007 eff. 06/01/2025 |
ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 | ELEV0012-001 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR: ROLLER | $30.91 | $18.07 | $48.98 | ENGI0101-008 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.62 | $18.07 | $49.69 | ENGI0101-008 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $31.62 | $18.07 | $49.69 | ENGI0101-008 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $31.62 | $18.07 | $49.69 | ENGI0101-008 eff. 04/01/2025 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.00 | $34.25 | $70.25 | IRON0010-004 eff. 04/01/2025 |
| LABORER (LANDSCAPE) | $27.05 | $13.62 | $40.67 | LABO0663-007 eff. 04/01/2025 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY (DADE, DOUGLAS, HICKORY, OZARK, ST. CLAIR, STONE, & TANEY COUNTIES) | $25.79 | $15.35 | $41.14 | PAIN2015-005 eff. 05/01/2024 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $39.35 | $15.72 | $55.07 | PLUM0178-009 eff. 11/01/2024 |
| ROOFER | $30.73 | $14.51 | $45.24 | ROOF0020-003 eff. 02/01/2025 |
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) | $34.43 | $17.86 | $52.29 | SHEE0036-029 eff. 07/01/2025 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | SUMO2010-012 eff. 03/08/2010 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $23.31 | $9.05 | $32.36 | SUMO2010-012 eff. 03/08/2010 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $22.25 | $9.77 | $32.02 | SUMO2010-012 eff. 03/08/2010 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | SUMO2010-012 eff. 03/08/2010 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 | SUMO2010-012 eff. 03/08/2010 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | $24.47 | SUMO2010-012 eff. 03/08/2010 |
| OPERATOR: BACKHOE/TRACKHOE | $19.80 | $7.47 | $27.27 | SUMO2010-012 eff. 03/08/2010 |
| LABORER: MASON TENDER - BRICK | $15.80 | $7.31 | $23.11 | SUMO2010-012 eff. 03/08/2010 |
| LABORER: COMMON OR GENERAL | $14.99 | $6.99 | $21.98 | SUMO2010-012 eff. 03/08/2010 |
| GLAZIER | $20.26 | $2.45 | $22.71 | SUMO2010-012 eff. 03/08/2010 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 | SUMO2010-012 eff. 03/08/2010 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $18.22 | $7.85 | $26.07 | SUMO2010-012 eff. 03/08/2010 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.