Missouri prevailing wage rates: MO20260018
Building construction in Phelps County.
MO20260018, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 | $70.72 | ASBE0001-005 eff. 10/07/2024 |
| TILE SETTER | $32.79 | $21.31 | $54.10 | BRMO0011-009 eff. 04/01/2023 |
| CARPENTER (INCLUDING DRYWALL HANGING & FORM WORK) | $44.19 | $21.85 | $66.04 | CARP0012-002 eff. 05/01/2024 |
| CARPENTER (FLOOR LAYER) (RESILIENT & VINYL FLOORING ONLY) | $40.08 | $21.85 | $61.93 | CARP1310-003 eff. 05/01/2024 |
| ELECTRICIAN | $40.50 | $23.26 | $63.76 | ELEC0257-011 eff. 03/01/2025 |
| POWER EQUIPMENT OPERATOR: ROLLER | $35.76 | $30.38 | $66.14 | ENGI0513-001 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | $30.38 | $69.44 | ENGI0513-001 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 | $69.44 | ENGI0513-001 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | $30.38 | $69.44 | ENGI0513-001 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | $30.38 | $69.44 | ENGI0513-001 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | $30.38 | $69.44 | ENGI0513-001 eff. 05/01/2025 |
| LABORER (COMMON OR GENERAL & LANDSCAPE) | $30.33 | $15.30 | $45.63 | LABO0840-003 eff. 03/01/2025 |
| LABORER (BRICK MASON TENDER) | $32.23 | $15.30 | $47.53 | LABO0840-003 eff. 03/01/2025 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $34.90 | $17.21 | $52.11 | PAIN1185-012 eff. 04/01/2025 |
| PAINTER (BRUSH & ROLLER ONLY) | $33.90 | $17.21 | $51.11 | PAIN1185-012 eff. 04/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $36.63 | $9.85 | $46.48 | PLAS0527-006 eff. 04/01/2023 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | PLUM0562-011 eff. 07/01/2025 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | PLUM0562-011 eff. 07/01/2025 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | PLUM0562-011 eff. 07/01/2025 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | PLUM0562-011 eff. 07/01/2025 |
| ROOFER | $33.60 | $19.99 | $53.59 | ROOF0020-012 eff. 09/19/2023 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.94 | $27.53 | $73.47 | SFMO0669-003 eff. 04/01/2025 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 | $79.12 | SHEE0036-017 eff. 08/01/2025 |
| TRUCK DRIVER: DUMP TRUCK | $25.57 | $0.00 | $25.57 | SUMO2010-017 eff. 03/08/2010 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | SUMO2010-017 eff. 03/08/2010 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $24.90 | $0.00 | $24.90 | SUMO2010-017 eff. 03/08/2010 |
| IRONWORKER, STRUCTURAL | $26.58 | $13.15 | $39.73 | SUMO2010-017 eff. 03/08/2010 |
| IRONWORKER, REINFORCING | $21.02 | $9.49 | $30.51 | SUMO2010-017 eff. 03/08/2010 |
| GLAZIER | $29.87 | $1.47 | $31.34 | SUMO2010-017 eff. 03/08/2010 |
| BRICKLAYER | $27.66 | $5.88 | $33.54 | SUMO2010-017 eff. 03/08/2010 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.