MO20260028, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed POWER EQUIPMENT OPERATOR: Bulldozer was $36.93 + $20.10 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (ATCHISON COUNTY) | $38.26 | $20.54 | $58.80 | ASBE0039-001 eff. 06/28/2024 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (ADAIR COUNTY) | $32.37 | $20.17 | $52.54 | ASBE0074-003 eff. 08/01/2024 |
| TILE SETTER (ATCHISON COUNTY) | $40.53 | $15.99 | $56.52 | BRMO0003-006 eff. 06/01/2023 |
| TILE SETTER (ADAIR COUNTY) | $32.79 | $21.31 | $54.10 | BRMO0011-007 eff. 04/01/2023 |
| BRICKLAYER (ADAIR COUNTY) | $32.79 | $21.31 | $54.10 | BRMO0011-007 eff. 04/01/2023 |
| BRICKLAYER (ATCHISON COUNTY) | $36.33 | $19.73 | $56.06 | BRMO0015-008 eff. 05/01/2023 |
| CARPENTER, EXCLUDES FORM WORK (ADAIR COUNTY) | $31.51 | $22.25 | $53.76 | CARP0010-006 eff. 05/01/2024 |
| CARPENTER, EXCLUDES FORM WORK (ATCHISON COUNTY) | $39.59 | $22.40 | $61.99 | CARP0110-001 eff. 05/01/2024 |
| ELECTRICIAN (ADAIR COUNTY) | $37.60 | $22.14 | $59.74 | ELEC0350-004 eff. 12/01/2024 |
| ELECTRICIAN | $43.20 | $21.50 | $64.70 | ELEC0545-005 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: ROLLER (ATCHISON COUNTY) | $45.48 | $22.42 | $67.90 | ENGI0101-011 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: PAVER (ATCHISON COUNTY) | $45.48 | $22.42 | $67.90 | ENGI0101-011 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: LOADER (ATCHISON COUNTY) | $45.48 | $22.42 | $67.90 | ENGI0101-011 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ATCHISON COUNTY) | $45.48 | $22.42 | $67.90 | ENGI0101-011 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: ROLLER (ADAIR COUNTY) | $39.06 | $30.38 | $69.44 | ENGI0513-011 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: PAVER (ADAIR COUNTY) | $39.06 | $30.38 | $69.44 | ENGI0513-011 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: LOADER (ADAIR COUNTY) | $39.06 | $30.38 | $69.44 | ENGI0513-011 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ADAIR COUNTY) | $39.06 | $30.38 | $69.44 | ENGI0513-011 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (ADAIR COUNTY) | $39.06 | $30.38 | $69.44 | ENGI0513-011 eff. 05/01/2025 |
| IRONWORKER, REINFORCING AND STRUCTURAL (ATCHISON COUNTY) | $39.00 | $34.25 | $73.25 | IRON0010-026 eff. 04/01/2025 |
| IRONWORKER, REINFORCING AND STRUCTURAL (ADAIR COUNTY) | $36.30 | $25.80 | $62.10 | IRON0577-012 eff. 12/30/2025 |
| LABORER: COMMON OR GENERAL & LANDSCAPE (ATCHISON COUNTY) | $32.31 | $15.75 | $48.06 | LABO0579-001 eff. 05/01/2025 |
| LABORER: BRICK MASON TENDER (ATCHISON COUNTY) | $32.51 | $15.75 | $48.26 | LABO0579-001 eff. 05/01/2025 |
| LABORER: COMMON OR GENERAL & LANDSCAPE (ADAIR COUNTY) | $28.78 | $16.05 | $44.83 | LABO0955-003 eff. 03/01/2025 |
| LABORER: BRICK MASON TENDER (ADAIR COUNTY) | $30.78 | $16.05 | $46.83 | LABO0955-003 eff. 03/01/2025 |
| PAINTER: BRUSH & ROLLER ONLY (ADAIR COUNTY) | $28.56 | $17.21 | $45.77 | PAIN1185-001 eff. 04/01/2025 |
| PAINTER: BRUSH & ROLLER ONLY (ATCHISON COUNTY) | $36.18 | $19.97 | $56.15 | PAIN2012-005 eff. 04/01/2025 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ATCHISON COUNTY) | $49.45 | $26.65 | $76.10 | PLUM0045-004 eff. 08/01/2025 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ATCHISON COUNTY) | $49.45 | $26.65 | $76.10 | PLUM0045-004 eff. 08/01/2025 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (ADAIR COUNTY) | $46.66 | $21.99 | $68.65 | PLUM0562-013 eff. 07/01/2024 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (ADAIR COUNTY) | $46.66 | $21.99 | $68.65 | PLUM0562-013 eff. 07/01/2024 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION (ADAIR COUNTY) | $50.60 | $30.13 | $80.73 | PLUM0562-013 eff. 07/01/2024 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (ADAIR COUNTY) | $48.66 | $22.79 | $71.45 | PLUM0562-013 eff. 07/01/2024 |
| ROOFER (ATCHISON COUNTY) | $34.50 | $19.74 | $54.24 | ROOF0020-022 eff. 06/01/2024 |
| ROOFER (ADAIR COUNTY) | $33.60 | $19.99 | $53.59 | ROOF0020-028 eff. 09/19/2023 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (ATCHISON COUNTY) | $47.20 | $26.28 | $73.48 | SHEE0002-015 eff. 07/01/2023 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (ADAIR COUNTY) | $36.51 | $22.39 | $58.90 | SHEE0036-022 eff. 07/01/2025 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | SUMO2010-027 eff. 03/08/2010 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | SUMO2010-027 eff. 03/08/2010 |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | $0.00 | $31.12 | SUMO2010-027 eff. 03/08/2010 |
| GLAZIER | $14.19 | $5.19 | $19.38 | SUMO2010-027 eff. 03/08/2010 |
| FORM WORKER | $26.44 | $0.00 | $26.44 | SUMO2010-027 eff. 03/08/2010 |
| CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 | $26.36 | SUMO2010-027 eff. 03/08/2010 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.