Missouri prevailing wage rates: MO20260029
Building construction in Barry, Barton, Benton Counties.
MO20260029, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 2 removed or reworded
- removed PAINTER: Brush & Roller Only was $19.75 + $11.76 fringe
- removed POWER EQUIPMENT OPERATOR: Bulldozer was $38.93 + $20.10 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 | $45.97 | ASBE0063-002 eff. 11/01/2024 |
| TILE SETTER (BENTON COUNTY) | $32.79 | $21.31 | $54.10 | BRMO0011-008 eff. 04/01/2023 |
| BRICKLAYER (BENTON COUNTY) | $32.79 | $21.31 | $54.10 | BRMO0011-008 eff. 04/01/2023 |
| BRICKLAYER (BARRY & BARTON COUNTIES) | $33.67 | $19.48 | $53.15 | BRMO0015-005 eff. 06/01/2023 |
| TILE SETTER (BARRY & BARTON COUNTIES) | $26.47 | $14.89 | $41.36 | BRMO0015-005 eff. 06/01/2023 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (BENTON COUNTY) | $31.51 | $22.25 | $53.76 | CARP0010-003 eff. 05/01/2024 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (BARRY & BARTON COUNTIES) | $29.50 | $21.50 | $51.00 | CARP0311-002 eff. 05/01/2024 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BARRY & BARTON COUNTIES) | $32.25 | $20.81 | $53.06 | ELEC0095-002 eff. 06/01/2025 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BENTON COUNTY) | $51.01 | $26.25 | $77.26 | ELEC0124-023 eff. 08/26/2024 |
ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 | ELEV0012-001 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR: ROLLER (BARRY & BARTON COUNTIES) | $30.91 | $18.07 | $48.98 | ENGI0101-007 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: LOADER (BARRY & BARTON COUNTIES) | $31.62 | $18.07 | $49.69 | ENGI0101-007 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BARRY & BARTON COUNTIES) | $31.62 | $18.07 | $49.69 | ENGI0101-007 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (BARRY & BARTON COUNTIES) | $31.62 | $18.07 | $49.69 | ENGI0101-007 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: ROLLER (BENTON COUNTY) | $45.48 | $22.42 | $67.90 | ENGI0101-017 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: LOADER (BENTON COUNTY) | $45.48 | $22.42 | $67.90 | ENGI0101-017 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BENTON COUNTY) | $45.48 | $22.42 | $67.90 | ENGI0101-017 eff. 04/01/2025 |
| IRONWORKER: REINFORCING AND STRUCTURAL (BARRY COUNTY) | $36.00 | $34.25 | $70.25 | IRON0010-005 eff. 04/01/2025 |
| IRONWORKER, REINFORCING AND STRUCTURAL (BARTON & BENTON COUNTIES) | $36.00 | $34.25 | $70.25 | IRON0010-027 eff. 04/01/2025 |
| LABORER: COMMON OR GENERAL & LANDSCAPE (BARTON & BENTON COUNTIES) | $26.50 | $13.18 | $39.68 | LABO0663-004 eff. 04/01/2025 |
| LABORER: BRICK MASON TENDER (BARTON & BENTON COUNTIES) | $28.00 | $13.18 | $41.18 | LABO0663-004 eff. 04/01/2025 |
| LABORER: COMMON OR GENERAL & LANDSCAPE (BARRY COUNTY) | $27.05 | $13.62 | $40.67 | LABO0663-008 eff. 04/01/2025 |
| LABORER: BRICK MASON TENDER (BARRY COUNTY) | $29.78 | $13.62 | $43.40 | LABO0663-008 eff. 04/01/2025 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY (BENTON COUNTY) | $25.39 | $17.76 | $43.15 | PAIN0003-012 eff. 04/01/2019 |
| PAINTER: BRUSH & ROLLER ONLY (BENTON COUNTY) | $24.43 | $17.76 | $42.19 | PAIN0003-012 eff. 04/01/2019 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $25.79 | $15.35 | $41.14 | PAIN2015-004 eff. 05/01/2024 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (BENTON COUNTY) | $58.38 | $25.29 | $83.67 | PLUM0008-010 eff. 06/01/2025 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS OVER $750,000) | $34.25 | $15.32 | $49.57 | PLUM0178-010 eff. 11/01/2023 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS $750,000 & UNDER) | $31.28 | $15.32 | $46.60 | PLUM0178-010 eff. 11/01/2023 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARRY COUNTY | $37.15 | $15.42 | $52.57 | PLUM0178-010 eff. 11/01/2023 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS OVER $750,000) | $35.75 | $15.32 | $51.07 | PLUM0178-010 eff. 11/01/2023 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY (PROJECTS $750,000 & UNDER) | $32.78 | $15.32 | $48.10 | PLUM0178-010 eff. 11/01/2023 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARRY COUNTY | $37.15 | $15.42 | $52.57 | PLUM0178-010 eff. 11/01/2023 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (BENTON COUNTY) | $57.51 | $28.35 | $85.86 | PLUM0533-007 eff. 06/01/2025 |
| ROOFER | $30.73 | $14.51 | $45.24 | ROOF0020-003 eff. 02/01/2025 |
| SHEET METAL WORKER (BARTON & BENTON COUNTIES) | $47.20 | $26.28 | $73.48 | SHEE0002-020 eff. 07/01/2023 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (BARRY COUNTY) | $34.43 | $17.86 | $52.29 | SHEE0036-026 eff. 07/01/2025 |
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | SUMO2010-028 eff. 03/08/2010 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | SUMO2010-028 eff. 03/08/2010 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 | SUMO2010-028 eff. 03/08/2010 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | $24.47 | SUMO2010-028 eff. 03/08/2010 |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | $7.47 | $31.02 | SUMO2010-028 eff. 03/08/2010 |
| GLAZIER | $22.71 | $0.00 | $22.71 | SUMO2010-028 eff. 03/08/2010 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 | SUMO2010-028 eff. 03/08/2010 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.