New Jersey prevailing wage rates: NJ20260007
Residential construction in Burlington County.
NJ20260007, modification 3, published 10/01/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 2
- changed CARPENTER (INCLUDES DRYWALL HANGING) base $48.27 → $48.27, fringe $5.79 → $11.38 (+$5.59) Same effective date as before (05/01/2025).
- changed IRONWORKER: REINFORCING base $53.24 → $53.24, fringe $0.40 → $40.40 (+$40.00) Same effective date as before (07/01/2025).
- changed IRONWORKER: STRUCTURAL base $54.24 → $54.24, fringe $0.40 → $40.40 (+$40.00) Same effective date as before (07/01/2025).
3 classifications added, 3 removed or reworded
- added ELECTRICIAN (BURLINGTON COUNTY - NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON-MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON-MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TOT HE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE) $63.82 + $41.99 fringe
- removed ELECTRICIAN (BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington-Mt. Holly road; then, south-southeast along the Burlington-Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line) was $61.84 + $40.32 fringe
- added LABORER: MASON TENDER, CEMENT/CONCRETE $29.35 + $23.07 fringe
- removed MASON TENDER: CEMENT/CONCRETE was $29.35 + $23.07 fringe
- added PAINTER (BRUSH & ROLLER) $22.03 + $15.62 fringe
- removed PAINTER: BRUSH AND ROLLER was $22.03 + $15.62 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BRICKLAYER | $49.60 | $37.96 | $87.56 | BRNJ0002-004 eff. 05/01/2025 |
| CEMENT MASON | $45.20 | $33.26 | $78.46 | BRNJ0005-001 eff. 05/01/2021 |
| CARPENTER (INCLUDES DRYWALL HANGING) | $48.27 | $11.38 | $59.65 | CARP0006-001 eff. 05/01/2025 |
| ELECTRICIAN (BURLINGTON COUNTY - NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON-MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON-MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TOT HE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE) | $63.82 | $41.99 | $105.81 | ELEC0269-006 eff. 01/05/2026 |
| ELECTRICIAN (BURLINGTON COUNTY - SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN EAST, ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE) | $55.05 | $48.76 | $103.81 | ELEC0351-004 eff. 09/30/2024 |
POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY.) | $58.22 | $37.50 | $95.72 | ENGI0825-006 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY.) | $56.59 | $37.50 | $94.09 | ENGI0825-006 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY.) | $61.72 | $37.50 | $99.22 | ENGI0825-006 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY.) | $60.13 | $37.50 | $97.63 | ENGI0825-006 eff. 07/01/2025 |
| IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | IRON0399-002 eff. 07/01/2025 |
| IRONWORKER: STRUCTURAL | $54.24 | $40.40 | $94.64 | IRON0399-002 eff. 07/01/2025 |
| LABORER: MASON TENDER, CEMENT/CONCRETE | $29.35 | $23.07 | $52.42 | LABO0077-001 eff. 07/01/2012 |
| PAINTER (BRUSH & ROLLER) | $22.03 | $15.62 | $37.65 | PAIN0711-001 eff. 05/01/2025 |
| PLUMBER/PIPEFITTER (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE PEMBERTON BOROUGH; THEN, SOUTH ON MAGNOLIA ROAD IN PEMBERTON TOWNSHIP TO MAGNOLIA NEW LISBON ROAD (ROUTE 545); THEN SOUTH ON MT. HOLLY MISERY ROAD TO STATE ROAD ROUTE 70 EAST; THEN, ALONG STATE ROAD ROUTE 70 EAST TO THE OCEAN COUNTY LINE) | $31.50 | $13.41 | $44.91 | PLUM0322-005 eff. 06/01/2025 |
| ROOFER (ALL TYPES) | $34.35 | $21.75 | $56.10 | ROOF0030-019 eff. 05/01/2024 |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 EO 13658 minimum $13.65 may apply | $2.34 | $15.84 | SUNJ2004-045 eff. 01/02/2009 |
| LABORER: COMMON OR GENERAL | $17.10 | $6.90 | $24.00 | SUNJ2004-045 eff. 01/02/2009 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.