New Jersey prevailing wage rates: NJ20260033
Building construction in Hudson County.
NJ20260033, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement) | $51.74 | $46.20 | $97.94 | ASBE0032-008 eff. 09/19/2024 |
| BRICKLAYER (INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional | $49.60 | $37.96 | $87.56 | BRNJ0002-014 eff. 05/01/2025 |
MASONScope and notesWork on high stacks: 22% per hour additional | $49.60 | $37.96 | $87.56 | BRNJ0002-016 eff. 05/01/2025 |
| MARBLE SETTER | $64.66 | $40.97 | $105.63 | BRNJ0007-003 eff. 07/07/2025 |
| TILE SETTER | $64.90 | $37.28 | $102.18 | BRNJ0007-022 eff. 06/02/2025 |
TILEScope and notesWork grouting all epoxy: $10.00 additional per day | $50.05 | $33.90 | $83.95 | BRNJ0007-022 eff. 06/02/2025 |
| CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 | $91.59 | CARP0006-009 eff. 05/01/2025 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION) | $57.42 | $34.17 | $91.59 | CARP0006-010 eff. 05/01/2025 |
| SOFT FLOOR LAYER | $57.42 | $34.17 | $91.59 | CARP0029-008 eff. 05/01/2025 |
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildingsScope and notesthe first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $58.84 | $35.06 | $93.90 | CARP0715-007 eff. 05/01/2025 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE Work on line voltage of 440 or 480 volts: 10% per hour Work from trusses, scaffolds, frames, ladders and poles, 40 ft. or more above the ground or floor (does not include work from a manlift): 20% per hour Work on radio towers, transmission towers and smokestacks: 21% per hour additional | $62.90 | $39.31 | $102.21 | ELEC0164-006 eff. 06/03/2024 |
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) CABLEScope and notesWork on line voltage of 440 or 480 volts: 10% per hour Work from trusses, scaffolds, frames, ladders and poles, 40 ft. or more above the ground or floor (does not include work from a manlift): 20% per hour Work on radio towers, transmission towers and smokestacks: 21% per hour additional | $73.59 | $45.99 | $119.58 | ELEC0164-006 eff. 06/03/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $52.88 | $37.50 | $90.38 | ENGI0825-020 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 | ENGI0825-020 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 | ENGI0825-020 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 | ENGI0825-020 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 | ENGI0825-020 eff. 07/01/2025 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | IRON0011-012 eff. 07/01/2025 |
| IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | IRON0011-012 eff. 07/01/2025 |
| ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants) | $28.37 | $21.62 | $49.99 | LABO0008-001 eff. 05/01/2011 |
| LABORER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 | $66.72 | LABO0077-002 eff. 05/01/2022 |
| LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 | $65.97 | LABO0077-006 eff. 05/01/2022 |
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 | $75.02 | PAIN0711-018 eff. 05/01/2025 |
| PAINTER (BRUSH & ROLLER) | $45.55 | $29.86 | $75.41 | PAIN0711-019 eff. 05/01/2025 |
| PAINTER (SPRAY) | $45.55 | $29.86 | $75.41 | PAIN0711-019 eff. 05/01/2025 |
| Work welding or using a cutting torch: $1.00 per hour additional. Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet: $1.00 per hour additional | $52.68 | $31.29 | $83.97 | PAIN0711-021 eff. 05/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $54.64 | $30.95 | $85.59 | PLAS0029-002 eff. 05/01/2025 |
| PLASTERER | $54.64 | $30.95 | $85.59 | PLAS0029-003 eff. 05/01/2025 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $62.09 | $45.05 | $107.14 | PLUM0024-001 eff. 05/01/2025 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION) (HUDSON COUNTY (City of Bayonne; Borough of East Newark; Towns of Guttenberg and Harrison; Cities of Hoboken and Jersey City; Town of Kearney; Township of North Bergen; Town of Secaucus; City of Union City; Township of Weehawken; Town of West New York)) | $57.97 | $40.22 | $98.19 | PLUM0274-001 eff. 05/01/2022 |
| ROOFER (INCLUDES ALL TYPES OF ROOFERS) | $44.52 | $32.25 | $76.77 | ROOF0004-007 eff. 06/01/2024 |
| ROOFER (ALL TYPES) (HUDSON COUNTY (EAST OF THE HACKENSACK RIVER)) | $50.25 | $39.62 | $89.87 | ROOF0008-005 eff. 05/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $67.97 | $39.35 | $107.32 | SFNJ0696-006 eff. 01/01/2025 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $51.30 | $51.55 | $102.85 | SHEE0025-005 eff. 06/01/2024 |
| LABORER: PIPELAYER | $38.85 | $0.14 | $38.99 | SUNJ2004-009 eff. 01/02/2009 |
| ELEVATOR MECHANIC | $40.21 | $11.22 | $51.43 | SUNJ2004-009 eff. 01/02/2009 |
TRUCK DRIVER: DUMP TRUCK HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level B, C or D personal protection for any workers other than the truck driver: $1.00 per hourScope and notesPAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the employee has been assigned to work, or, "shapes", one day of the calendar week during which the holiday occurs | $47.36 | $44.02 | $91.38 | TEAM0560-002 eff. 05/01/2025 |
TRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level B, C or D personal protection for any workers other than the truck driver: $1.00 per hourScope and notesPAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the employee has been assigned to work, or, "shapes", one day of the calendar week during which the holiday occurs | $47.51 | $44.02 | $91.53 | TEAM0560-002 eff. 05/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.