New Jersey prevailing wage rates: NJ20260051
Heavy construction in Cumberland County.
NJ20260051, modification 2, published 08/13/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
CARPENTER: INCLUDING FORM WORKScope and notes(THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) | $57.42 | $34.17 | $91.59 | CARP0006-013 eff. 05/01/2025 |
PILEDRIVERMAN (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS ANY OF THE THREE DAYS IN THE FIVE-DAY WORK WEEK PRECEDING THE HOLIDAY AND THE FIRST WORK DAY AFTER THE HOLIDAY.) | $46.73 | $41.69 | $88.42 | CARP0454-009 eff. 05/01/2023 |
| MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) | $58.84 | $35.06 | $93.90 | CARP0715-007 eff. 05/01/2025 |
| ELECTRICIAN AND CABLE SPLICER | $55.05 | $48.76 | $103.81 | ELEC0351-013 eff. 09/30/2024 |
POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $52.88 | $37.50 | $90.38 | ENGI0825-019 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 | ENGI0825-019 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 | ENGI0825-019 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 2 CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 | ENGI0825-019 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE) (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 | ENGI0825-019 eff. 07/01/2025 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 | IRON0399-006 eff. 07/01/2024 |
| IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | IRON0399-006 eff. 07/01/2024 |
| LABORER: MASON TENDER: CEMENT/CONCRETE | $29.35 | $23.07 | $52.42 | LABO0077-008 eff. 07/01/2012 |
LABORER: PIPELAYER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $51.65 | $38.53 | $90.18 | LABO0172-007 eff. 03/01/2025 |
LABORER: LANDSACPE LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $50.95 | $38.53 | $89.48 | LABO0172-007 eff. 03/01/2025 |
| PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION) | $58.28 | $33.85 | $92.13 | PAIN0711-023 eff. 05/01/2023 |
| PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) | $29.05 | $18.91 | $47.96 | PAIN0711-024 eff. 05/01/2017 |
| PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION) | $40.19 | $22.72 | $62.91 | PAIN0711-024 eff. 05/01/2017 |
| CEMENT MASON/CONCRETE FINISHER | $53.21 | $33.42 | $86.63 | PLAS0592-036 eff. 05/01/2025 |
| PIPEFITTER | $56.30 | $50.76 | $107.06 | PLUM0322-010 eff. 05/01/2025 |
| OPERATOR: BACKHOE LOADER COMBO | $31.28 | $20.79 | $52.07 | SUNJ2004-027 eff. 01/02/2009 |
| LABORER: COMMON OR GENERAL | $25.30 | $11.92 | $37.22 | SUNJ2004-027 eff. 01/02/2009 |
TRUCK DRIVER: OFF THE ROAD TRUCK; FLATBED TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL.) SHIFT WORK: AN OWNER MANDATED IRREGULAR SHIFT STARING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE $1.00 PER HOUR, FOR EACH HOUR WORKED, IN ADDITION TO THE REGULAR RATE OF PAY.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE HOLIDAY OCCURS.BEREAVEMENT PAY: IN CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMIY (MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE BURIAL DAY FALLS ON A REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS | $44.65 | $34.11 | $78.76 | TEAM0676-005 eff. 05/01/2025 |
TRUCK DRIVER: DUMP TRUCK; PICKUP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS NOT REQUIRED: $1.00 PER HOUR ADDITIONAL.) SHIFT WORK: AN OWNER MANDATED IRREGULAR SHIFT STARING ANY TIME OTHER THAN BETWEEN 6:00 AM AND 8:00 AM TO RECEIVE $1.00 PER HOUR, FOR EACH HOUR WORKED, IN ADDITION TO THE REGULAR RATE OF PAY.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY (OR THE DAY AFTER THANKSGIVING, AT THE OPTION OF THE CONTRACTOR), THANKSGIVING DAY, THE AFTERNOON OF THE DAY BEFORE CHRISTMAS (DEC. 24) PROVIDED THAT THE WORKER WORKS IN THE MORNING, AND CHRISTMAS DAY, PROVIDED THAT THE WORKER WORKS OR IS AVAILABLE FOR WORK ON AT LEAST TWO DAYS IN THE WEEK IN WHICH THE HOLIDAY OCCURS. BEREAVEMENT PAY: IN CASE OF A DEATH IN THE WORKER'S IMMEDIATE FAMIY (MOTHER, FATHER, WIFE, HUSBAND, CHILDREN, BROTHER, SISTER, CURRENT MOTHER-IN-LAW, CURRENT FATHER-IN-LAW, GRANDPARENTS), THE WORKER SHALL BE ALLOWED LEAVE NOT TO EXCEED THREE (3) DAYS STRAIGHT-TIME PAY, PROVIDED THAT HE OR SHE SHALL RECEIVE NO PAY UNLESS THE DAY OF DEATH AND THE BURIAL DAY FALLS ON A REGULAR WORK DAY, AND NOT ON DAYS OFF, HOLIDAYS, VACATION, SATURDAYS OR SUNDAYS | $44.30 | $34.11 | $78.41 | TEAM0676-005 eff. 05/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 08/13/2026. We format and check the official text; the determination in your contract is what applies.