New Mexico prevailing wage rates: NM20260021
Building construction in Lincoln County.
NM20260021, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | $10.79 | $34.87 | CARP1245-004 eff. 06/01/2018 |
| ELECTRICIAN, EXCLUDING LOW VOLTAGE WIRING FOR ALARMS (ZONE 1). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE | $40.30 | $13.41 | $53.71 | ELEC0611-020 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | $4.65 | $36.08 | ENGI0953-007 eff. 01/01/2024 |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | $4.65 | $32.35 | ENGI0953-007 eff. 01/01/2024 |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | $4.65 | $31.40 | ENGI0953-007 eff. 01/01/2024 |
| IRONWORKER: ORNAMENTAL | $28.05 | $18.11 | $46.16 | IRON0495-009 eff. 01/01/2023 |
| IRONWORKER, STRUCTURAL (METAL BUILDING ERECTION ONLY) | $28.05 | $18.11 | $46.16 | IRON0495-009 eff. 01/01/2023 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $43.07 | $16.60 | $59.67 | PLUM0412-007 eff. 01/02/2025 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $43.07 | $16.60 | $59.67 | PLUM0412-007 eff. 01/02/2025 |
| SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | SHEE0049-012 eff. 01/01/2024 |
| TRUCK DRIVER: WATER TRUCK | $16.25 | $5.00 | $21.25 | SUNM2010-009 eff. 11/09/2010 |
| TRUCK DRIVER: PICKUP TRUCK | $15.91 | $3.13 | $19.04 | SUNM2010-009 eff. 11/09/2010 |
| TRUCK DRIVER: DUMP TRUCK | $15.36 | $5.00 | $20.36 | SUNM2010-009 eff. 11/09/2010 |
| TILE SETTER | $19.00 | $0.00 | $19.00 | SUNM2010-009 eff. 11/09/2010 |
| TILE FINISHER | $14.02 | $0.00 | $14.02 | SUNM2010-009 eff. 11/09/2010 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | SUNM2010-009 eff. 11/09/2010 |
| ROOFER | $13.24 EO 13658 minimum $13.65 may apply | $0.50 | $13.74 | SUNM2010-009 eff. 11/09/2010 |
| PLASTERER | $17.65 | $7.15 | $24.80 | SUNM2010-009 eff. 11/09/2010 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $17.89 | $0.35 | $18.24 | SUNM2010-009 eff. 11/09/2010 |
| OPERATOR: GRADER/BLADE | $21.39 | $4.94 | $26.33 | SUNM2010-009 eff. 11/09/2010 |
| OPERATOR: FORKLIFT | $21.13 | $4.83 | $25.96 | SUNM2010-009 eff. 11/09/2010 |
| OPERATOR: BACKHOE | $23.89 | $2.61 | $26.50 | SUNM2010-009 eff. 11/09/2010 |
| LABORER: PIPELAYER | $13.78 | $2.20 | $15.98 | SUNM2010-009 eff. 11/09/2010 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 EO 13658 minimum $13.65 may apply | $0.85 | $12.36 | SUNM2010-009 eff. 11/09/2010 |
| LABORER: MASON TENDER - BRICK | $13.77 | $4.35 | $18.12 | SUNM2010-009 eff. 11/09/2010 |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 EO 13658 minimum $13.65 may apply | $0.24 | $10.84 | SUNM2010-009 eff. 11/09/2010 |
| LABORER: COMMON OR GENERAL | $13.12 EO 13658 minimum $13.65 may apply | $3.79 | $16.91 | SUNM2010-009 eff. 11/09/2010 |
| IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION | $29.35 | $0.53 | $29.88 | SUNM2010-009 eff. 11/09/2010 |
| IRONWORKER, REINFORCING | $20.84 | $7.68 | $28.52 | SUNM2010-009 eff. 11/09/2010 |
| INSULATOR - BATT | $24.44 | $8.43 | $32.87 | SUNM2010-009 eff. 11/09/2010 |
| GLAZIER | $20.15 | $5.50 | $25.65 | SUNM2010-009 eff. 11/09/2010 |
| FLOOR LAYER: CARPET | $22.31 | $0.30 | $22.61 | SUNM2010-009 eff. 11/09/2010 |
| DRYWALL FINISHER/TAPER | $19.64 | $2.75 | $22.39 | SUNM2010-009 eff. 11/09/2010 |
| CEMENT MASON/CONCRETE FINISHER | $24.47 | $0.20 | $24.67 | SUNM2010-009 eff. 11/09/2010 |
| ELECTRICIAN (Low Voltage Wiring for Alarms) | $28.25 | $6.62 | $34.87 | SUNM2010-009 eff. 11/09/2010 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $27.11 | $0.35 | $27.46 | SUNM2010-009 eff. 11/09/2010 |
| CARPENTER (FORM WORK ONLY) | $20.86 | $6.60 | $27.46 | SUNM2010-009 eff. 11/09/2010 |
| CARPENTER (DRYWALL HANGING ONLY) | $27.11 | $0.35 | $27.46 | SUNM2010-009 eff. 11/09/2010 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $27.11 | $0.35 | $27.46 | SUNM2010-009 eff. 11/09/2010 |
| BRICKLAYER | $20.36 | $5.74 | $26.10 | SUNM2010-009 eff. 11/09/2010 |
| BOILERMAKER | $21.77 | $3.98 | $25.75 | SUNM2010-009 eff. 11/09/2010 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.