New Mexico prevailing wage rates: NM20260022

Building construction in Los Alamos County.

NM20260022, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No existing rate changed amount.

0 classifications added, 1 removed or reworded
  • removed Power Equipment Operator: (4) Bobcat/Skid Loader was $22.81 + $6.10 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

NM20260022 wage rates
ClassificationBaseFringeTotalRate ID
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORMWORK)$24.08$10.79$34.87CARP1353-007
eff. 06/01/2018
ELECTRICIAN$46.35$13.65$60.00ELEC0611-017
eff. 01/01/2025
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID L27.70ADER)$27.70$4.65$32.35ENGI0953-010
eff. 01/01/2024
POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION))$26.75$4.65$31.40ENGI0953-010
eff. 01/01/2024
IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL$28.05$18.11$46.16IRON0495-008
eff. 01/01/2023
LABORER, MASON TENDER BRICK$23.69$7.89$31.58LABO0016-005
eff. 06/01/2024
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67PLUM0412-007
eff. 01/02/2025
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$43.07$16.60$59.67PLUM0412-007
eff. 01/02/2025
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY)$37.50$18.51$56.01SHEE0049-012
eff. 01/01/2024
TRUCK DRIVER: WATER TRUCK$15.16$4.69$19.85SUNM2010-010
eff. 11/09/2010
TRUCK DRIVER: PICKUP TRUCK$15.91$3.13$19.04SUNM2010-010
eff. 11/09/2010
TRUCK DRIVER: DUMP TRUCK$11.00
EO 13658 minimum $13.65 may apply
$0.00$11.00SUNM2010-010
eff. 11/09/2010
TILE SETTER$14.30$1.02$15.32SUNM2010-010
eff. 11/09/2010
TILE FINISHER$14.02$0.00$14.02SUNM2010-010
eff. 11/09/2010
SPRINKLER FITTER (FIRE SPRINKLERS)$20.00$4.16$24.16SUNM2010-010
eff. 11/09/2010
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$22.01$9.65$31.66SUNM2010-010
eff. 11/09/2010
ROOFER$18.84$0.00$18.84SUNM2010-010
eff. 11/09/2010
PLASTERER$17.65$5.29$22.94SUNM2010-010
eff. 11/09/2010
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$16.10$1.79$17.89SUNM2010-010
eff. 11/09/2010
OPERATOR: LOADER (FRONT END)$19.76$4.84$24.60SUNM2010-010
eff. 11/09/2010
OPERATOR: GRADER/BLADE$20.33$4.94$25.27SUNM2010-010
eff. 11/09/2010
OPERATOR: FORKLIFT$20.86$4.60$25.46SUNM2010-010
eff. 11/09/2010
OPERATOR: CRANE$24.38$4.60$28.98SUNM2010-010
eff. 11/09/2010
OPERATOR: BACKHOE$18.79$3.47$22.26SUNM2010-010
eff. 11/09/2010
LABORER: PIPELAYER$13.78$2.20$15.98SUNM2010-010
eff. 11/09/2010
LABORER: MASON TENDER - CEMENT/CONCRETE$11.51
EO 13658 minimum $13.65 may apply
$0.85$12.36SUNM2010-010
eff. 11/09/2010
LABORER: LANDSCAPE & IRRIGATION$12.42
EO 13658 minimum $13.65 may apply
$1.47$13.89SUNM2010-010
eff. 11/09/2010
LABORER: COMMON OR GENERAL$12.99
EO 13658 minimum $13.65 may apply
$3.56$16.55SUNM2010-010
eff. 11/09/2010
LABORER: ASPHALT RAKER$10.25
EO 13658 minimum $13.65 may apply
$0.00$10.25SUNM2010-010
eff. 11/09/2010
GLAZIER$20.15$3.63$23.78SUNM2010-010
eff. 11/09/2010
FLOOR LAYER: CARPET$18.05$4.49$22.54SUNM2010-010
eff. 11/09/2010
DRYWALL FINISHER/TAPER$13.00
EO 13658 minimum $13.65 may apply
$0.00$13.00SUNM2010-010
eff. 11/09/2010
CEMENT MASON/CONCRETE FINISHER$16.27$3.94$20.21SUNM2010-010
eff. 11/09/2010
CARPENTER (FORM WORK ONLY)$18.80$5.61$24.41SUNM2010-010
eff. 11/09/2010
CARPENTER (DRYWALL HANGING ONLY)$19.13$0.00$19.13SUNM2010-010
eff. 11/09/2010
CARPENTER (BATT INSULATION ONLY)$26.07$5.96$32.03SUNM2010-010
eff. 11/09/2010
BRICKLAYER$20.80$5.10$25.90SUNM2010-010
eff. 11/09/2010
BOILERMAKER$21.77$3.98$25.75SUNM2010-010
eff. 11/09/2010
ACOUSTICAL CEILING MECHANIC$12.00
EO 13658 minimum $13.65 may apply
$0.00$12.00SUNM2010-010
eff. 11/09/2010

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.