New Mexico prevailing wage rates: NM20260022
Building construction in Los Alamos County.
NM20260022, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed Power Equipment Operator: (4) Bobcat/Skid Loader was $22.81 + $6.10 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORMWORK) | $24.08 | $10.79 | $34.87 | CARP1353-007 eff. 06/01/2018 |
| ELECTRICIAN | $46.35 | $13.65 | $60.00 | ELEC0611-017 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID L27.70ADER) | $27.70 | $4.65 | $32.35 | ENGI0953-010 eff. 01/01/2024 |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | $4.65 | $31.40 | ENGI0953-010 eff. 01/01/2024 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $28.05 | $18.11 | $46.16 | IRON0495-008 eff. 01/01/2023 |
| LABORER, MASON TENDER BRICK | $23.69 | $7.89 | $31.58 | LABO0016-005 eff. 06/01/2024 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $43.07 | $16.60 | $59.67 | PLUM0412-007 eff. 01/02/2025 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $43.07 | $16.60 | $59.67 | PLUM0412-007 eff. 01/02/2025 |
| SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | SHEE0049-012 eff. 01/01/2024 |
| TRUCK DRIVER: WATER TRUCK | $15.16 | $4.69 | $19.85 | SUNM2010-010 eff. 11/09/2010 |
| TRUCK DRIVER: PICKUP TRUCK | $15.91 | $3.13 | $19.04 | SUNM2010-010 eff. 11/09/2010 |
| TRUCK DRIVER: DUMP TRUCK | $11.00 EO 13658 minimum $13.65 may apply | $0.00 | $11.00 | SUNM2010-010 eff. 11/09/2010 |
| TILE SETTER | $14.30 | $1.02 | $15.32 | SUNM2010-010 eff. 11/09/2010 |
| TILE FINISHER | $14.02 | $0.00 | $14.02 | SUNM2010-010 eff. 11/09/2010 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $20.00 | $4.16 | $24.16 | SUNM2010-010 eff. 11/09/2010 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | SUNM2010-010 eff. 11/09/2010 |
| ROOFER | $18.84 | $0.00 | $18.84 | SUNM2010-010 eff. 11/09/2010 |
| PLASTERER | $17.65 | $5.29 | $22.94 | SUNM2010-010 eff. 11/09/2010 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $16.10 | $1.79 | $17.89 | SUNM2010-010 eff. 11/09/2010 |
| OPERATOR: LOADER (FRONT END) | $19.76 | $4.84 | $24.60 | SUNM2010-010 eff. 11/09/2010 |
| OPERATOR: GRADER/BLADE | $20.33 | $4.94 | $25.27 | SUNM2010-010 eff. 11/09/2010 |
| OPERATOR: FORKLIFT | $20.86 | $4.60 | $25.46 | SUNM2010-010 eff. 11/09/2010 |
| OPERATOR: CRANE | $24.38 | $4.60 | $28.98 | SUNM2010-010 eff. 11/09/2010 |
| OPERATOR: BACKHOE | $18.79 | $3.47 | $22.26 | SUNM2010-010 eff. 11/09/2010 |
| LABORER: PIPELAYER | $13.78 | $2.20 | $15.98 | SUNM2010-010 eff. 11/09/2010 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 EO 13658 minimum $13.65 may apply | $0.85 | $12.36 | SUNM2010-010 eff. 11/09/2010 |
| LABORER: LANDSCAPE & IRRIGATION | $12.42 EO 13658 minimum $13.65 may apply | $1.47 | $13.89 | SUNM2010-010 eff. 11/09/2010 |
| LABORER: COMMON OR GENERAL | $12.99 EO 13658 minimum $13.65 may apply | $3.56 | $16.55 | SUNM2010-010 eff. 11/09/2010 |
| LABORER: ASPHALT RAKER | $10.25 EO 13658 minimum $13.65 may apply | $0.00 | $10.25 | SUNM2010-010 eff. 11/09/2010 |
| GLAZIER | $20.15 | $3.63 | $23.78 | SUNM2010-010 eff. 11/09/2010 |
| FLOOR LAYER: CARPET | $18.05 | $4.49 | $22.54 | SUNM2010-010 eff. 11/09/2010 |
| DRYWALL FINISHER/TAPER | $13.00 EO 13658 minimum $13.65 may apply | $0.00 | $13.00 | SUNM2010-010 eff. 11/09/2010 |
| CEMENT MASON/CONCRETE FINISHER | $16.27 | $3.94 | $20.21 | SUNM2010-010 eff. 11/09/2010 |
| CARPENTER (FORM WORK ONLY) | $18.80 | $5.61 | $24.41 | SUNM2010-010 eff. 11/09/2010 |
| CARPENTER (DRYWALL HANGING ONLY) | $19.13 | $0.00 | $19.13 | SUNM2010-010 eff. 11/09/2010 |
| CARPENTER (BATT INSULATION ONLY) | $26.07 | $5.96 | $32.03 | SUNM2010-010 eff. 11/09/2010 |
| BRICKLAYER | $20.80 | $5.10 | $25.90 | SUNM2010-010 eff. 11/09/2010 |
| BOILERMAKER | $21.77 | $3.98 | $25.75 | SUNM2010-010 eff. 11/09/2010 |
| ACOUSTICAL CEILING MECHANIC | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUNM2010-010 eff. 11/09/2010 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.