NM20260023, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No base or fringe rates changed. The modification may have changed notes or other text.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

NM20260023 wage rates
ClassificationBaseFringeTotalRate ID
CARPENTER (METAL STUD INSTALLATION ONLY)$24.08$10.79$34.87CARP1245-004
eff. 06/01/2018
ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING FOR ALARMS)$38.00$9.82$47.82ELEC0583-009
eff. 01/01/2025
POWER EQUIPMENT OPERATOR ((8)CRANE)$31.43$4.65$36.08ENGI0953-011
eff. 01/01/2024
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END))$27.70$4.65$32.35ENGI0953-011
eff. 01/01/2024
IRONWORKER: ORNAMENTAL$28.05$18.11$46.16IRON0495-009
eff. 01/01/2023
IRONWORKER, STRUCTURAL (METAL BUILDING ERECTION ONLY)$28.05$18.11$46.16IRON0495-009
eff. 01/01/2023
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67PLUM0412-007
eff. 01/02/2025
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$43.07$16.60$59.67PLUM0412-007
eff. 01/02/2025
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY)$37.50$18.51$56.01SHEE0049-012
eff. 01/01/2024
TRUCK DRIVER: WATER TRUCK$16.25$5.00$21.25SUNM2010-011
eff. 11/09/2010
TRUCK DRIVER: PICKUP TRUCK$15.91$3.13$19.04SUNM2010-011
eff. 11/09/2010
TRUCK DRIVER: DUMP TRUCK$15.36$5.00$20.36SUNM2010-011
eff. 11/09/2010
TILE SETTER$19.00$0.00$19.00SUNM2010-011
eff. 11/09/2010
TILE FINISHER$14.02$0.00$14.02SUNM2010-011
eff. 11/09/2010
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION$22.01$9.65$31.66SUNM2010-011
eff. 11/09/2010
ROOFER$13.24
EO 13658 minimum $13.65 may apply
$0.50$13.74SUNM2010-011
eff. 11/09/2010
PLASTERER$17.65$7.15$24.80SUNM2010-011
eff. 11/09/2010
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$16.58$1.75$18.33SUNM2010-011
eff. 11/09/2010
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION)$16.80$4.43$21.23SUNM2010-011
eff. 11/09/2010
OPERATOR: GRADER/BLADE$21.39$4.94$26.33SUNM2010-011
eff. 11/09/2010
OPERATOR: FORKLIFT$21.13$4.83$25.96SUNM2010-011
eff. 11/09/2010
OPERATOR: BACKHOE$22.13$4.30$26.43SUNM2010-011
eff. 11/09/2010
LABORER: PIPELAYER$13.78$2.20$15.98SUNM2010-011
eff. 11/09/2010
LABORER: MASON TENDER - CEMENT/CONCRETE$11.51
EO 13658 minimum $13.65 may apply
$0.85$12.36SUNM2010-011
eff. 11/09/2010
LABORER: MASON TENDER - BRICK$13.77$4.35$18.12SUNM2010-011
eff. 11/09/2010
LABORER: LANDSCAPE & IRRIGATION$10.60
EO 13658 minimum $13.65 may apply
$0.24$10.84SUNM2010-011
eff. 11/09/2010
LABORER: COMMON OR GENERAL$13.12
EO 13658 minimum $13.65 may apply
$3.79$16.91SUNM2010-011
eff. 11/09/2010
IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION$22.20$8.06$30.26SUNM2010-011
eff. 11/09/2010
IRONWORKER, REINFORCING$20.84$7.68$28.52SUNM2010-011
eff. 11/09/2010
INSULATOR - BATT$24.44$8.43$32.87SUNM2010-011
eff. 11/09/2010
GLAZIER$20.15$3.95$24.10SUNM2010-011
eff. 11/09/2010
FLOOR LAYER: CARPET$22.31$0.30$22.61SUNM2010-011
eff. 11/09/2010
DRYWALL FINISHER/TAPER$19.64$2.75$22.39SUNM2010-011
eff. 11/09/2010
CEMENT MASON/CONCRETE FINISHER$17.72$3.72$21.44SUNM2010-011
eff. 11/09/2010
ELECTRICIAN (Low Voltage Wiring for Alarms)$28.25$6.62$34.87SUNM2010-011
eff. 11/09/2010
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION$20.86$1.30$22.16SUNM2010-011
eff. 11/09/2010
CARPENTER (FORM WORK ONLY)$19.79$6.14$25.93SUNM2010-011
eff. 11/09/2010
CARPENTER (DRYWALL HANGING ONLY)$21.39$2.85$24.24SUNM2010-011
eff. 11/09/2010
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$20.79$0.00$20.79SUNM2010-011
eff. 11/09/2010
BRICKLAYER$20.36$5.74$26.10SUNM2010-011
eff. 11/09/2010
BOILERMAKER$21.77$3.98$25.75SUNM2010-011
eff. 11/09/2010

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.