New Mexico prevailing wage rates: NM20260032
Building construction in Hidalgo, Sierra Counties.
NM20260032, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (METAL STUD INSTALLATION ONLY) | $24.08 | $10.79 | $34.87 | CARP1245-004 eff. 06/01/2018 |
| ELECTRICIAN: EXCLUDING LOW VOLTAGE WIRING FOR ALARMS (HIDALGO COUNTY) | $38.00 | $9.82 | $47.82 | ELEC0583-010 eff. 01/01/2025 |
| ELECTRICIAN, EXCLUDING LOW VOLTAGE WIRING FOR ALARMS (SIERRA COUNTY). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE | $40.30 | $13.41 | $53.71 | ELEC0611-021 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR ((8) CRANE) | $31.43 | $4.65 | $36.08 | ENGI0953-007 eff. 01/01/2024 |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) | $27.70 | $4.65 | $32.35 | ENGI0953-007 eff. 01/01/2024 |
| POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | $4.65 | $31.40 | ENGI0953-007 eff. 01/01/2024 |
| IRONWORKER: ORNAMENTAL | $28.05 | $18.11 | $46.16 | IRON0495-009 eff. 01/01/2023 |
| IRONWORKER, STRUCTURAL (METAL BUILDING ERECTION ONLY) | $28.05 | $18.11 | $46.16 | IRON0495-009 eff. 01/01/2023 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $43.07 | $16.60 | $59.67 | PLUM0412-007 eff. 01/02/2025 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $43.07 | $16.60 | $59.67 | PLUM0412-007 eff. 01/02/2025 |
| SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | SHEE0049-012 eff. 01/01/2024 |
| TRUCK DRIVER: WATER TRUCK | $16.25 | $5.00 | $21.25 | SUNM2010-020 eff. 11/09/2010 |
| TRUCK DRIVER: PICKUP TRUCK | $15.91 | $3.13 | $19.04 | SUNM2010-020 eff. 11/09/2010 |
| TRUCK DRIVER: DUMP TRUCK | $15.36 | $5.00 | $20.36 | SUNM2010-020 eff. 11/09/2010 |
| TILE SETTER | $19.00 | $0.00 | $19.00 | SUNM2010-020 eff. 11/09/2010 |
| TILE FINISHER | $14.02 | $0.00 | $14.02 | SUNM2010-020 eff. 11/09/2010 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | $31.66 | SUNM2010-020 eff. 11/09/2010 |
| ROOFER | $13.24 EO 13658 minimum $13.65 may apply | $0.50 | $13.74 | SUNM2010-020 eff. 11/09/2010 |
| PLASTERER | $17.65 | $7.15 | $24.80 | SUNM2010-020 eff. 11/09/2010 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $16.58 | $1.75 | $18.33 | SUNM2010-020 eff. 11/09/2010 |
| OPERATOR: GRADER/BLADE | $21.39 | $4.94 | $26.33 | SUNM2010-020 eff. 11/09/2010 |
| OPERATOR: FORKLIFT | $21.13 | $4.83 | $25.96 | SUNM2010-020 eff. 11/09/2010 |
| OPERATOR: BACKHOE | $22.13 | $4.30 | $26.43 | SUNM2010-020 eff. 11/09/2010 |
| LABORER: PIPELAYER | $13.78 | $2.20 | $15.98 | SUNM2010-020 eff. 11/09/2010 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.51 EO 13658 minimum $13.65 may apply | $0.85 | $12.36 | SUNM2010-020 eff. 11/09/2010 |
| LABORER: MASON TENDER - BRICK | $13.77 | $4.35 | $18.12 | SUNM2010-020 eff. 11/09/2010 |
| LABORER: LANDSCAPE & IRRIGATION | $10.60 EO 13658 minimum $13.65 may apply | $0.24 | $10.84 | SUNM2010-020 eff. 11/09/2010 |
| LABORER: COMMON OR GENERAL | $13.12 EO 13658 minimum $13.65 may apply | $3.79 | $16.91 | SUNM2010-020 eff. 11/09/2010 |
| IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION | $22.20 | $8.06 | $30.26 | SUNM2010-020 eff. 11/09/2010 |
| IRONWORKER, REINFORCING | $20.84 | $7.68 | $28.52 | SUNM2010-020 eff. 11/09/2010 |
| INSULATOR - BATT | $24.44 | $8.43 | $32.87 | SUNM2010-020 eff. 11/09/2010 |
| GLAZIER | $20.15 | $3.95 | $24.10 | SUNM2010-020 eff. 11/09/2010 |
| FLOOR LAYER: CARPET | $22.31 | $0.30 | $22.61 | SUNM2010-020 eff. 11/09/2010 |
| DRYWALL FINISHER/TAPER | $19.64 | $2.75 | $22.39 | SUNM2010-020 eff. 11/09/2010 |
| CEMENT MASON/CONCRETE FINISHER | $17.72 | $3.72 | $21.44 | SUNM2010-020 eff. 11/09/2010 |
| ELECTRICIAN (Low Voltage Wiring for Alarms) | $28.25 | $6.62 | $34.87 | SUNM2010-020 eff. 11/09/2010 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $22.13 | $4.03 | $26.16 | SUNM2010-020 eff. 11/09/2010 |
| CARPENTER (FORM WORK ONLY) | $19.79 | $6.14 | $25.93 | SUNM2010-020 eff. 11/09/2010 |
| CARPENTER (DRYWALL HANGING ONLY) | $21.39 | $2.85 | $24.24 | SUNM2010-020 eff. 11/09/2010 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.79 | $0.00 | $20.79 | SUNM2010-020 eff. 11/09/2010 |
| BRICKLAYER | $20.36 | $5.74 | $26.10 | SUNM2010-020 eff. 11/09/2010 |
| BOILERMAKER | $21.77 | $3.98 | $25.75 | SUNM2010-020 eff. 11/09/2010 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.