New Mexico prevailing wage rates: NM20260037
Highway construction in Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Quay, Rio Arriba, San Miguel, Taos, Union Counties.
NM20260037, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $13.13 EO 13658 minimum $13.65 may apply | $0.26 | $13.39 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: PICKUP AND PILOT CAR | $12.74 EO 13658 minimum $13.65 may apply | $0.26 | $13.00 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: FLATBED TRUCK (RIO ARRIBA) | $12.95 EO 13658 minimum $13.65 may apply | $0.26 | $13.21 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: FLATBED TRUCK (QUAY, SAN MIGUEL) | $13.30 EO 13658 minimum $13.65 may apply | $0.26 | $13.56 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: FLATBED TRUCK (MCKINLEY) | $13.55 EO 13658 minimum $13.65 may apply | $0.26 | $13.81 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: FLATBED TRUCK (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, TAOS, UNION) | $13.27 EO 13658 minimum $13.65 may apply | $0.26 | $13.53 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: FLATBED TRUCK (CIBOLA) | $12.71 EO 13658 minimum $13.65 may apply | $0.26 | $12.97 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: DUMP TRUCK (QUAY) | $15.20 | $0.26 | $15.46 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: DUMP TRUCK (MCKINLEY) | $13.15 EO 13658 minimum $13.65 may apply | $0.26 | $13.41 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: DUMP TRUCK (COLFAX, SAN MIGUEL) | $13.24 EO 13658 minimum $13.65 may apply | $0.26 | $13.50 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: DUMP TRUCK (CIBOLA, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, TAOS, UNION) | $14.75 | $0.26 | $15.01 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER: DISTRIBUTOR | $13.56 EO 13658 minimum $13.65 may apply | $0.26 | $13.82 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER (TRACTOR HAUL TRUCK) | $14.00 | $0.00 | $14.00 | SUNM2011-005 eff. 08/26/2011 |
| TRUCK DRIVER (SEMI-TRAILER TRUCK) | $16.58 | $0.26 | $16.84 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $16.84 | $0.26 | $17.10 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: SCREED | $15.96 | $0.26 | $16.22 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $15.91 | $0.26 | $16.17 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | $15.80 | $0.26 | $16.06 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (QUAY) | $14.74 | $0.26 | $15.00 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (MCKINLEY) | $16.49 | $0.26 | $16.75 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT AND DIRT) (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $14.39 | $0.98 | $15.37 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (QUAY) | $15.99 | $0.26 | $16.25 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (MCKINLEY) | $14.95 | $0.26 | $15.21 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $15.87 | $0.26 | $16.13 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: OILER | $14.29 | $0.26 | $14.55 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $17.48 | $0.26 | $17.74 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (QUAY) | $16.10 | $0.26 | $16.36 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MORA) | $16.21 | $0.26 | $16.47 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MCKINLEY) | $16.13 | $0.26 | $16.39 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (HARDING) | $19.37 | $0.26 | $19.63 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (COLFAX) | $15.72 | $0.26 | $15.98 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (CIBOLA, GUADALUPE, LOS ALAMOS, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $16.27 | $0.26 | $16.53 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (QUAY) | $19.50 | $0.26 | $19.76 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $17.48 | $0.26 | $17.74 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $17.16 | $0.26 | $17.42 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (QUAY) | $14.89 | $0.26 | $15.15 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $14.97 | $0.26 | $15.23 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $18.06 | $0.26 | $18.32 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (QUAY) | $16.27 | $0.26 | $16.53 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (MCKINLEY) | $16.70 | $0.26 | $16.96 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (HARDING) | $20.74 | $0.26 | $21.00 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CIBOLA, COLFAX, GUADALUPE, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $16.80 | $0.26 | $17.06 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $16.26 | $0.26 | $16.52 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $16.89 | $0.26 | $17.15 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR) | $14.50 | $0.26 | $14.76 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: (CRUSHER) | $16.53 | $0.26 | $16.79 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: (BROOM OPERATOR) | $15.72 | $0.26 | $15.98 | SUNM2011-005 eff. 08/26/2011 |
| POWER EQUIPMENT OPERATOR: (ASPHALT/CONCRETE PAVER, LAYDOWN MACHINE, AND PLANT) | $16.43 | $1.51 | $17.94 | SUNM2011-005 eff. 08/26/2011 |
| PAINTER, BRUSH, ROLLER AND SPRAY (MCKINLEY) | $14.15 | $0.44 | $14.59 | SUNM2011-005 eff. 08/26/2011 |
| PAINTER, BRUSH, ROLLER AND SPRAY (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $15.06 | $0.44 | $15.50 | SUNM2011-005 eff. 08/26/2011 |
| LABORER: PIPELAYER | $16.99 | $0.35 | $17.34 | SUNM2011-005 eff. 08/26/2011 |
| LABORER: ASPHALT RAKER | $14.39 | $0.35 | $14.74 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE (RIO ARRIBA) | $13.33 EO 13658 minimum $13.65 may apply | $1.97 | $15.30 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, SAN MIGUEL, TAOS, UNION) | $13.04 EO 13658 minimum $13.65 may apply | $1.78 | $14.82 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, FLAGGER/CONE SETTER (QUAY) | $12.21 EO 13658 minimum $13.65 may apply | $0.26 | $12.47 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, FLAGGER/CONE SETTER (MCKINLEY) | $11.66 EO 13658 minimum $13.65 may apply | $0.35 | $12.01 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, FLAGGER/CONE SETTER (COLFX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $12.15 EO 13658 minimum $13.65 may apply | $0.99 | $13.14 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, FLAGGER/CONE SETTER (CIBOLA) | $13.14 EO 13658 minimum $13.65 may apply | $0.35 | $13.49 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (UNION) | $10.89 EO 13658 minimum $13.65 may apply | $0.35 | $11.24 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (TAOS) | $12.61 EO 13658 minimum $13.65 may apply | $0.35 | $12.96 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (SAN MIGUEL) | $12.56 EO 13658 minimum $13.65 may apply | $0.35 | $12.91 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (RIO ARRIBA) | $12.28 EO 13658 minimum $13.65 may apply | $0.35 | $12.63 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (QUAY) | $12.15 EO 13658 minimum $13.65 may apply | $0.35 | $12.50 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (MORA) | $11.34 EO 13658 minimum $13.65 may apply | $0.35 | $11.69 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (MCKINLEY) | $11.22 EO 13658 minimum $13.65 may apply | $0.35 | $11.57 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (HARDING) | $11.57 EO 13658 minimum $13.65 may apply | $0.35 | $11.92 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (GUADALUPE, LOS ALAMOS) | $11.83 EO 13658 minimum $13.65 may apply | $0.35 | $12.18 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (COLFAX) | $9.60 EO 13658 minimum $13.65 may apply | $0.35 | $9.95 | SUNM2011-005 eff. 08/26/2011 |
| LABORER, COMMON OR GENERAL (CIBOLA) | $12.27 EO 13658 minimum $13.65 may apply | $0.35 | $12.62 | SUNM2011-005 eff. 08/26/2011 |
| LABORER (GRADE CHECKER) | $14.67 | $1.60 | $16.27 | SUNM2011-005 eff. 08/26/2011 |
| IRONWORKER, STRUCTURAL | $21.77 | $6.03 | $27.80 | SUNM2011-005 eff. 08/26/2011 |
| IRONWORKER, REINFORCING (RIO ARRIBA) | $21.98 | $6.03 | $28.01 | SUNM2011-005 eff. 08/26/2011 |
| IRONWORKER, REINFORCING (MCKINLEY) | $22.44 | $5.85 | $28.29 | SUNM2011-005 eff. 08/26/2011 |
| IRONWORKER, REINFORCING (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, QUAY, SAN MIGUEL, TAOS, UNION) | $21.57 | $4.80 | $26.37 | SUNM2011-005 eff. 08/26/2011 |
| IRONWORKER, REINFORCING (CIBOLA) | $23.05 | $1.54 | $24.59 | SUNM2011-005 eff. 08/26/2011 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (QUAY) | $12.00 EO 13658 minimum $13.65 may apply | $0.35 | $12.35 | SUNM2011-005 eff. 08/26/2011 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $12.37 EO 13658 minimum $13.65 may apply | $0.35 | $12.72 | SUNM2011-005 eff. 08/26/2011 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (COLFAX) | $11.68 EO 13658 minimum $13.65 may apply | $0.35 | $12.03 | SUNM2011-005 eff. 08/26/2011 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (CIBOLA) | $12.35 EO 13658 minimum $13.65 may apply | $0.35 | $12.70 | SUNM2011-005 eff. 08/26/2011 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (SAN MIGUEL) | $15.31 | $0.35 | $15.66 | SUNM2011-005 eff. 08/26/2011 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (QUAY) | $16.37 | $0.26 | $16.63 | SUNM2011-005 eff. 08/26/2011 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (MCKINLEY) | $14.55 | $0.35 | $14.90 | SUNM2011-005 eff. 08/26/2011 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, TAOS, UNION) | $15.16 | $0.35 | $15.51 | SUNM2011-005 eff. 08/26/2011 |
| HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (CIBOLA) | $13.66 | $0.35 | $14.01 | SUNM2011-005 eff. 08/26/2011 |
| ELECTRICIAN (INCLUDING TRAFFIC SIGNAL INSTALLATION) | $24.66 | $8.56 | $33.22 | SUNM2011-005 eff. 08/26/2011 |
| CEMENT MASON/CONCRETE FINISHER (TAOS) | $14.98 | $0.26 | $15.24 | SUNM2011-005 eff. 08/26/2011 |
| CEMENT MASON/CONCRETE FINISHER (RIO ARRIBA, SAN MIGUEL) | $15.58 | $1.54 | $17.12 | SUNM2011-005 eff. 08/26/2011 |
| CEMENT MASON/CONCRETE FINISHER (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, UNION) | $15.07 | $0.26 | $15.33 | SUNM2011-005 eff. 08/26/2011 |
| CEMENT MASON/CONCRETE FINISHER (CIBOLA) | $15.58 | $0.26 | $15.84 | SUNM2011-005 eff. 08/26/2011 |
| CARPENTER, INCLUDES FORM WORK (SAN MIGUEL) | $13.93 | $0.44 | $14.37 | SUNM2011-005 eff. 08/26/2011 |
| CARPENTER, INCLUDES FORM WORK (MORA) | $14.44 | $0.44 | $14.88 | SUNM2011-005 eff. 08/26/2011 |
| CARPENTER, INCLUDES FORM WORK (MCKINLEY) | $13.51 EO 13658 minimum $13.65 may apply | $0.44 | $13.95 | SUNM2011-005 eff. 08/26/2011 |
| CARPENTER, INCLUDES FORM WORK (GUADALUPE, LOS ALAMOS, COLFAX, HARDING, GUAY, TAOS, UNION) | $13.84 | $0.44 | $14.28 | SUNM2011-005 eff. 08/26/2011 |
| CARPENTER, INCLUDES FORM WORK (CIBOLA, RIA ARRIBA) | $14.27 | $0.44 | $14.71 | SUNM2011-005 eff. 08/26/2011 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.