New York prevailing wage rates: NY20260007
Building, Heavy, Highway construction in Dutchess, Orange, Sullivan, Ulster Counties.
NY20260007, modification 3, published 10/08/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 2
No existing rate changed amount.
114 classifications added, 104 removed or reworded
- added BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) $46.45 + $37.50 fringe
- added BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE COUNTY (TOWN OF TUXEDO)) $47.44 + $38.00 fringe
- added BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) $46.45 + $37.50 fringe
- added BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE COUNTY (TOWN OF TUXEDO)) $47.44 + $38.00 fringe
- added BRICKLAYER (HIGHWAY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER COUNTIES) $46.45 + $37.50 fringe
- removed BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, BUILDING CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) was $46.45 + $37.50 fringe
- removed BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, BUILDING CONSTRUCTION (ORANGE COUNTY (TOWN OF TUXEDO)) was $47.44 + $38.00 fringe
- removed BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) was $46.45 + $37.50 fringe
- removed BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (ORANGE COUNTY (TOWN OF TUXEDO)) was $47.44 + $38.00 fringe
- removed BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HIGHWAY CONSTRUCTION (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER COUNTIES) was $46.45 + $37.50 fringe
- added CARPENTERS (BUILDING CONSTRUCTION): CARPENTERS, MILLWRIGHTS, PILE DRIVERS $44.72 + $31.23 fringe
- added CARPENTERS (HEAVY AND HIGHWAY CONSTRUCTION): CARPENTERS, MILLWRIGHTS, PILE DRIVERS $44.72 + $31.23 fringe
- removed CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (BUILDING CONSTRUCTION) was $44.72 + $31.23 fringe
- removed CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY & HIGHWAY CONSTRUCTION) was $44.72 + $31.23 fringe
- added ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $35.34 + $30.12 fringe
- added ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (DIGGING MACHINE OPERATOR) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $55.40 + $31.78 fringe
- added ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $49.25 + $31.15 fringe
- added ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $49.25 + $31.15 fringe
- added ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): LINEMAN & TECHNICIAN (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $61.56 + $36.21 fringe
- added ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): MECHANIC (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $49.25 + $31.15 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER) $43.35 + $30.73 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) $43.35 + $30.73 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): FLAGMAN $35.34 + $30.12 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN DIGGING MACHINE OPERATOR $55.40 + $31.78 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) $49.25 + $31.15 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN TRUCK DRIVER $49.25 + $31.15 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): MECHANIC $49.25 + $31.15 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): CABLE SPLICER $63.14 + $33.82 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): FLAGMAN $35.34 + $30.12 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): GROUNDMAN DIGGING MACHINE OPERATOR $55.40 + $31.78 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) $49.25 + $31.15 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): LINEMAN & TECHNICIAN $61.56 + $36.21 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): MECHANIC $49.25 + $31.15 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): CABLE SPLICER $64.59 + $42.92 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): FLAGMAN $35.34 + $30.12 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN DIGGING MACHINE OPERATOR $55.40 + $31.78 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN TRUCK DRIVER $49.25 + $31.15 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): LINEMAN & TECHNICIAN $61.56 + $36.21 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): MECHANIC $49.25 + $31.15 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): CABLE SPLICER $40.81 + $6.99 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): GROUNDMAN $20.53 + $6.39 fringe
- added ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR $38.73 + $6.93 fringe
- removed ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY was $40.81 + $6.99 fringe
- removed ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY was $20.53 + $6.39 fringe
- removed ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY was $38.73 + $6.93 fringe
- removed ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: FLAGMAN (SULLIVAN COUNTY). was $35.34 + $30.12 fringe
- removed ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROUNDMAN (DIGGING MACHINE OPERATOR) (SULLIVAN COUNTY). was $55.40 + $31.78 fringe
- removed ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROUNDMAN (TRUCK DRIVER) (SULLIVAN COUNTY). was $49.25 + $31.15 fringe
- removed ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (SULLIVAN COUNTY). was $49.25 + $31.15 fringe
- removed ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: LINEMAN & TECHNICIAN (SULLIVAN COUNTY). was $61.56 + $36.21 fringe
- removed ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: MECHANIC (SULLIVAN COUNTY). was $49.25 + $31.15 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER). was $43.35 + $30.73 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). was $43.35 + $30.73 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) was $63.14 + $33.82 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) was $64.59 + $42.92 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) was $35.34 + $30.12 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) was $35.34 + $30.12 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) was $35.34 + $30.12 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) was $55.40 + $31.78 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) was $55.40 + $31.78 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab was $55.40 + $31.78 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) was $49.25 + $31.15 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat was $49.25 + $31.15 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) was $49.25 + $31.15 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) was $49.25 + $31.15 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) was $61.56 + $36.21 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins was $61.56 + $36.21 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) was $49.25 + $31.15 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) was $49.25 + $31.15 fringe
- removed ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) was $49.25 + $31.15 fringe
- added IRONWORKER (ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING $42.63 + $53.70 fringe
- removed IRONWORKER A) was $42.63 + $53.70 fringe
- added LABORER - ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (HEAVY & HIGHWAY) GROUP 1: ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $44.80 + $32.45 fringe
- added LABORER - ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (HEAVY & HIGHWAY) GROUP 2: ASBESTOS TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $49.40 + $32.45 fringe
- added LABORER - ASBESTOS, LEAD, TOXIC, AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (BUILDING CONSTRUCTION) GROUP 1: ASBESTOS ABATEMENT WORK, LEAD ABATEMENT WORK, TOXIC AND HAZARDOUS WASTE RELATED WORK; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (DUTCHESS COUNTY) $45.40 + $29.75 fringe
- added LABORER - ASBESTOS, LEAD, TOXIC, AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (BUILDING CONSTRUCTION) GROUP 2: ASBESTOS ABATEMENT WORK, TOXIC AND HAZARDOUS ABATEMENT, LEAD ABATEMENT WORK, ENVIRONMENTAL WORK. (DUTCHESS COUNTY) $46.20 + $29.75 fringe
- added LABORER - TUNNEL, SHAFT, & CAISSON WORK - GROUP 1: LABORER, PIT AND DUMPMAN, CHUCK TENDER, BRAKEMAN AND POWDER; MINER AND ALL MAVHINE MEN, SAFETY MINER, ALL SHAFT WORK, CASSON WORK, DRILLING, BLOW PIPE, ALL AIR TOOLS, TUGGER SCALING, NIPPER GUNNITING SROM POT TO NOZZLE, BIT GRINDER, SINGAL MAN (TOP AND BOTTOM), SHIFT STEWARD, CONCRETE MAN, SHIELD DRIVEN TUNNEL, MIXED FACE AND SOFT GROUND LINER PLATE TUNNEL IN FREE AIR $48.05 + $29.50 fringe
- added LABORER (BUILDING CONSTRUCTION) GROUP 1: CUSTODIAL WORK, FLAG PERSON, PORTABLE GENERATOR TENDER, PORTABLE PUMP TENDER, PITMAN AND DUMPMAN, FIREWATCH, TEMPORARY HEAT TENDER, TEMPORARY LIGHT TENDER, TRAFFIC CONTROL, TOOL ROOM TENDER; ARTIFICIAL TURF, AIR CHIPPING HAMMER ACOUSTIC PUMP AND MIXER, CARPENTER TENDER, CONCRETE, CONCRETE CURB AND SIDEWALK FORM SETTER, CONCRETE FORM STRIPPING, CONCRETE SEALING, CONCRETE CURING, CONCRETE FINISHER, CONCRETE VIBRATOR, COMPRESSOR, CLEAN UP AFTER TRADES, DISMANTLING DEMOLITION, EXCAVATION, FIREPROOFING, FOUNDATION AND BUILDING PIPING, PUMP AND MIXER, GUNITE, GENERAL CLEAN UP, GRADE CHECKER, GRADING AND BACKFILLING, HOISTS, HOD CARRIER, LANDSCAPING, MASON TENDER, MULTI BUILDING TRADES TENDER, JACKHAMMER, PAVEMENT BREAKER, POURED GYPSUM ROOF WORK, POWER TAMPERS, POWER WALK BEHIND ROLLER, PRESSURE BLASTING, POWER MIXER, SCAFFOLDING, SNOW REMOVAL, SIGNAL PERSON, SANDBLASTING, STYROFOAM AND SIMILAR INSTALLATION, RADIO CONTROL EQUIPMENT INCLUDING BUT NOT LIMITED TO RADIO CONTROL TAMPERS AND ROLLERS, RADIO CONTROL EXCAVATOR, ALL ERECTING AND DISMANTLING OF SCAFFOLD FOR MASONRY REGARDLESS OF HEIGHT, WALKING AND RIDING POWER BUGGIES, TEMPORARY WEATHER PROTECTION, WRECKING, WATERPROOFING, STONE AND TILE TENDERS, RADIO CONTROLLED HAMMERS AND BREAKERS, UNLOADING OF TRUCKS, AIR TRACK, ASSEMBLING AND PLACING GABION BASKETS, ASPHALT, BLASTER, BOB CAT TYPE MACHINE FOR DEMO AND CLEAN UP, CHAIN LINK FENCE, CHAIN SAW, CHIPPING HAMMER, CONCRETE CONVEYOR BELT, SAW, CORE DRILL, CORRUGATED PIPE, CONSTRUCTION SPECIALIST, CLEANING MACHINE, CONCRETE FORM SETTER, CONDUIT LAYER, CUTTING TORCH, DISCHARGE PIPE, DRILL CHUCK TENDER, DUCT BANK LAYER, EXPLOSIVE HANDLER, HYDRAULIC SPLITTER, GRANITE OR STONE CURBING, HANDLER, JOY AND JIB DRILL, INGERSOLL RAND HEAVY DUTY CRAWLER MASTER TYPE HCMZ DRILL MACHINES OR EQUIVALENT, LASER LEVEL, NONMETALLIC PIPE LAYER, METALLIC PIPE LAYER, LEROI HYDRAULIC DRILL OR SIMILAR, MEGA MIXER, POWER FORK LIFT, PRESTRESSED AND PRECAST CONCRETE, POWER BRUSH CUTTER, PUMP CRETE MACHINE, RETAINING WALLS, RIP RAP, RETENTION AND TOXIC AND HAZARDOUS WASTE LINERS, SETTING OF BLOCK, SETTING OF BLOCK, SETTING OF BRICK, SETTING OF STONE, SOUND BARRIERS, TRANSIT UNDER LABORERS JURISDICTION, TOW BEHIND CONCRETE OR GROUT PUMP, TRAFFIC AND PEDESTRIAN STRIPPING, SURFACE PLANNER, MANUFACTURED CURB, WALK BEHIND DURFACE PLANNER, WAGON DRILL, WELDING; * ASBESTOS ABATEMENT WORK, LEAD ABATEMENT WORK, TOXIC AND HAZARDOUS WASTE RELATED WORK; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (ORANGE AND ULSTER COUNTIES) $35.95 + $27.15 fringe
- added LABORER (BUILDING CONSTRUCTION) GROUP 2: FORKLIFT FOR MASONRY PURPOSES (ORANGE AND ULSTER COUNTIES) $37.75 + $27.15 fringe
- added LABORER (BUILDING CONSTRUCTION) GROUP 3: ASBESTOS ABATEMENT WORK, TOXIC AND HAZARDOUS ABATEMENT, LEAD ABATEMENT WORK, ENVIRONMENTAL WORK. (ORANGE AND ULSTER COUNTIES) $40.50 + $27.15 fringe
- added LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 1: FLAGPERSON, GATEPERSON (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING $40.80 + $32.45 fringe
- added LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 2: GENERAL LABORERS, CHUCK TENDER, HANDLING AND DISTRIBUTING DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR MAN, SPRAYING, BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CRUB AND SIDEWALK FROM SETTER; PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL PERSON, PIPELAYER, PIPELINING AND RELINING, WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL, ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TRACK, JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL PASSER AND OTHER MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK, WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER, GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN, CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING COMING UNDER LABORERS JURISDICITION, BIT GRINDER, OPERATOR OF FORM PIN PULLER AND DRIVERS, SANDBLASTING, JOINT AND JET SEALER, FILLING AND WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST CONCRETE BRICK, BLOCK AND STONE PAVERS, POWER TOOLS USED TO PERFORM WORK USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF, PLASTER AND ACOUSTIC PUMP, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIALS ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS, ARTIFICIAL TURF, RETAINING WALLS, WALK BEHIND SURFACE PLANER, WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO STITCHING, SEAMING, HEAT WELDING, FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER, MANHOLE, CATCH BASIN OR INLET INSTALLING, LASE MEN. GROUND MAN ON MILLING MACHINE. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING $44.80 + $32.45 fringe
- added LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 3: INGERSOLL RAND EAVY DUTY CRAWLER MASTER TYPE HCMZ ANY DRILL USING 4" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLUDING GRADE, PIPE, CONCRETE, CLEARING, BLACKTOP, DRILL, PAVING AND BLASTER ETC., HYDRAULIC DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY, BLASTER AND ASPHALT SCREEDMAN. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING $49.40 + $32.45 fringe
- added LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIALABATEMENT FOREMAN. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING $54.70 + $32.45 fringe
- removed LABORER: DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 1 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump tender, pitman and dumpman, firewatch, temporary heat tender, temporary light tender, traffic control, tool room tender; Artificial turf, air chipping hammer acoustic pump and mixer, carpenter tender, concrete, concrete curb and side was $45.40 + $29.75 fringe
- removed LABORER: DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 2 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump tender, pitman and dumpman, firewatch, temporary heat tender, temporary light tender, traffic control, tool room tender; Artificial turf, air chipping hammer acoustic pump and mixer, carpenter tender, concrete, concrete curb and side was $46.20 + $29.75 fringe
- added LABORERS (BUILDING CONSTRUCTION) GROUP 1: MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS. (DUTCHESS COUNTY) $41.10 + $32.90 fringe
- added LABORERS (BUILDING CONSTRUCTION) GROUP 2: HOD CARRIERS, PLASTERERS' TENDERS, SCAFFOLD BUILDERS (PADLOCK AND SELF-SUPPORTING SCAFFOLD 14 FT. OR UNDER ALL RUNWAYS, MORTAR MIXERS) MACHINE AND HAND, CONCRETE MIXERS BY MACHINE UNDER 21E, VIBRATORS, FORM SETTERS, ASPHALT RAKERS, HANDLING REINFORCEMENT RODS, DRILLERS, JACKHAMMER, OPERATOR, SIGNALMAN, GUNNITING, MOTORBUGS, WATER PUMP 2"" OR UNDER BARCO MACHINE, WRECKERS, PAVING BREAKERS, POWER SAW OPERATORS, OTHER MACHINE OPERATORS. (DUTCHESS COUNTY) $42.22 + $32.90 fringe
- added LABORERS (BUILDING CONSTRUCTION) GROUP 3: BLASTERS, LASER BEAM OPERATOR. (DUTCHESS COUNTY) $43.45 + $32.90 fringe
- added LABORERS (HEAVY & HIGHWAY) GROUP 1: FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOMS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $36.45 + $27.80 fringe
- added LABORERS (HEAVY & HIGHWAY) GROUP 2: GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDERMAN, HIGHSCALERS, POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $42.80 + $27.80 fringe
- added LABORERS (HEAVY & HIGHWAY) GROUP 3: ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $43.90 + $27.80 fringe
- removed LABORERS: GROUP 1 (BUILDING CONSTRUCTION) MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS. (DUTCHESS COUNTY) was $41.10 + $32.90 fringe
- removed LABORERS: GROUP 2 (BUILDING CONSTRUCTION) was $42.22 + $32.90 fringe
- removed LABORERS: GROUP 3 (BUILDING CONSTRUCTION) BLASTERS, LASER BEAM OPERATOR. (DUTCHESS COUNTY) was $43.45 + $32.90 fringe
- removed LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOMS. (DUTCHESS COUNTY) was $36.45 + $27.80 fringe
- removed LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDERMAN, HIGHSCALERS, POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKERS. (DUTCHESS COUNTY) was $42.80 + $27.80 fringe
- removed LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS. (DUTCHESS COUNTY) was $43.90 + $27.80 fringe
- removed POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 2 "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANER; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST IS "OUTSIDE MATERIAL LOWER HOIST"; HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO-BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; STRADDLE CARRIER, ROSS AND SIMILAR TYPES; VACUUM TRUCK; WHIP HAMMER; WINCH TRUCKS (HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. was $60.13 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 3 ASPHALT CURBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINES (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON-SITE; BELT CONVEYOR SYSTEMS; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (A:ROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMOBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONDUCTION WITH GENERATORS); HOISTS (ROOF, TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLE DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION WITH UNLOADING); WELDER AND REPAIR MACHINES. CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; MAINTENANCE OPERATOR; VACUUM BLASTING MACHINE OPERATOR (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. was $58.22 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. was $56.59 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 5 OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $61.72 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 6 HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $63.54 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 1 was $61.72 + $37.50 fringe
- added POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING, HEAVY & HIGHWAY): AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPE); UTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPES);AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR TYPES); BACKHOE; CENTRAL POWER PLANTS (ALL TYPES); CONCRETE PAVING MACHINE (S-240 AND SIMILAR TYPES); CRANES (ALL TYPES,INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); CRANES, GANTRY; DERRICKS (LAND, FLOATING OR CHICAGO BOOM TYPE); DRILLMASTER/QUARTMASTER (DOWN THE HOLE DRILL) ROTARY DRILL; SELF-PROPELLED, HYDRAULIC DRILL, SELF-POWERED DRILL DRAGLINES, ELEVATOR GRADERS, FRONT END LOADERS (5 YDS. AND OVER), GRADALLS, GRADER: RAGO, HELICOPTERS (COPILOT), HELICOPTERS, (COMMUNICATION ENGINEER), LOCOMOTIVE (LARGE), MUCKING MACHINES, PAVEMENT AND CONCRETE BREAKER (SUPERHAMMER, HOE RAM, BROKK 250 AND SIMILAR TYPES), PILE DRIVER (LENGTH OF BOOM INCLUDING LENGTH OF LEADS SHALL DETERMINE PREMIUM RATE APPLICABLE), ROADWAY SURFACE GRINDER SCOOPER (LOADER AND SHOVEL), SHOVELS, TREE CHOOPER WITH BOOM, TRENCH MACHINES, TUNNEL BORING MACHINES. (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $61.72 + $37.50 fringe
- added POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY): ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $57.30 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY): BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE $68.63 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY) was $57.30 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 1-A (HEAVY & HIGHWAY): AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING $60.42 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 1-B (HEAVY & HIGHWAY): ROAD PAVER, ASPHALT $63.70 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 1A (BUILDING CONSTRUCTION): CARRIER- TRAILER HORSE; CONCRETE-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPERSTRUCTURE SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC. (CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE; LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES; POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10 TON UP TO 25 TON) (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $59.04 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 1A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $59.04 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 1B (BUILDING CONSTRUCTION): COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $54.41 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 1B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $54.41 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING, HEAVY & HIGHWAY): "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANER; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST IS "OUTSIDE MATERIAL LOWER HOIST"; HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO-BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; STRADDLE CARRIER, ROSS AND SIMILAR TYPES; VACUUM TRUCK; WHIP HAMMER; WINCH TRUCKS (HOISTING). (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $60.13 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) was $56.39 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY): ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $56.39 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 2-A (HEAVY & HIGHWAY): BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC $57.84 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 2-B (HEAVY & HIGHWAY): MECHANIC (OUTSIDE) ALL TYPES $59.67 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 2A (BUILDING CONSTRUCTION): COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $56.97 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 2A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $56.97 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING, HEAVY & HIGHWAY): ASPHALT CURBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINES (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON-SITE; BELT CONVEYOR SYSTEMS; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (A:ROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMOBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONDUCTION WITH GENERATORS); HOISTS (ROOF, TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLE DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION WITH UNLOADING); WELDER AND REPAIR MACHINES. CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; MAINTENANCE OPERATOR; VACUUM BLASTING MACHINE OPERATOR (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $58.22 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) was $53.82 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $53.82 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY): A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; WINCH TRUCK "A" FRAME. JOHN HENRY DRILL OR SIMILAR. (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING $56.81 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 3A (BUILDING CONSTRUCTION): ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR). (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $54.88 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 3A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $54.88 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 3B (BUILDING CONSTRUCTION): COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; STUD MACHINE; LADDER HOIST. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $52.25 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 3B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $52.25 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 4 (BUILDING, HEAVY & HIGHWAY): BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $56.59 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY & HIGHWAY) TOWER CRANES (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) was $63.30 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY & HIGHWAY): TOWER CRANES. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $63.30 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 4-A (HEAVY & HIGHWAY): SERVICE MEN (FUEL OR GREASE TRUCK) $51.57 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 4-B (HEAVY & HIGHWAY): OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) $44.19 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 4A (BUILDING CONSTRUCTION): AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT -FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB SITE); ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE GRADING MACHINE; ROOF HOIST (TUGGER HOIST); TELEVISION CAMERAS-WATER- SEWER-GAS-ETC. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $54.33 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 4A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $54.33 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 4B (BUILDING CONSTRUCTION): COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $45.94 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 4B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $45.94 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING CONSTRUCTION): MOTORIZED ROLLER (WALK BEHIND) (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $49.53 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING, HEAVY & HIGHWAY): OILER (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $61.72 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 5 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $49.53 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY) CRANES 50 TONS AND OVER (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) was $61.80 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY): CRANES 50 TONS AND OVER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $61.80 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY):OILER $64.02 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5-A-1 (HEAVY & HIGHWAY): MASTER MECHANIC $64.02 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5-A-2 (HEAVY & HIGHWAY): ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS) $77.82 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5-A-3 (HEAVY & HIGHWAY): ENGINEER-- PILE DRIVER $75.13 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5-A-4 (HEAVY & HIGHWAY): HOIST ENGINEER- STEEL -SUB STRUCTURE $70.41 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5-A-5 (HEAVY & HIGHWAY): JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER $59.19 + $35.25 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5A (BUILDING CONSTRUCTION): MASTER MECHANIC (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $61.95 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 5A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $61.95 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 5B (BUILDING CONSTRUCTION): UTILITY MAN (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $47.00 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 5B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $47.00 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 6 (BUILDING CONSTRUCTION): WAREHOUSE MAN (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $49.26 + $31.32 fringe
- added POWER EQUIPMENT OPERATOR GROUP 6 (BUILDING, HEAVY & HIGHWAY): HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) $63.54 + $37.50 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 6 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) was $49.26 + $31.32 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 6 (HEAVY & HIGHWAY) CRANES 49 TONS AND BELOW (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) was $60.30 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 6 (HEAVY & HIGHWAY): CRANES 49 TONS AND BELOW. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $60.30 + $33.55 fringe
- removed POWER EQUIPMENT OPERATOR GROUP 7 (HEAVY & HIGHWAY) MASTER MECHANIC (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) was $58.91 + $33.55 fringe
- added POWER EQUIPMENT OPERATOR GROUP 7 (HEAVY & HIGHWAY): MASTER MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $58.91 + $33.55 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (POUGHKEEPSIE AND SOUTH THEREOF) was $68.63 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE was $60.42 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-B ROAD PAVER, ASPHALT (POUGHKEEPSIE AND SOUTH THEREOF) was $63.70 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC. (POUGHKEEPSIE AND SOUTH THEREOF) was $57.84 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (POUGHKEEPSIE AND SOUTH THEREOF) was $59.67 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; WINCH TRUCK "A" FRAME. JOHN HENRY DRILL OR SIMILAR. (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE was $56.81 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (POUGHKEEPSIE AND SOUTH THEREOF) was $51.57 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (POUGHKEEPSIE AND SOUTH THEREOF) was $44.19 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC (POUGHKEEPSIE AND SOUTH THEREOF) was $64.02 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (POUGHKEEPSIE AND SOUTH THEREOF) was $77.82 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-3 ENGINEER-- PILE DRIVER (POUGHKEEPSIE AND SOUTH THEREOF) was $75.13 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (POUGHKEEPSIE AND SOUTH THEREOF) was $70.41 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (POUGHKEEPSIE AND SOUTH THEREOF) was $59.19 + $35.25 fringe
- removed POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5OILER (POUGHKEEPSIE AND SOUTH THEREOF) was $64.02 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $62.35 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $60.70 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $58.56 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $57.06 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $53.34 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER PILOT. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $64.28 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 1: CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $70.24 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 2: CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $68.58 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 3: "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $61.29 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 4: AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $58.63 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 5: COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $57.10 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 6: OILER. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $53.34 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 7: HELICOPTER PILOT. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $65.74 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $69.96 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $68.37 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 3: HELICOPTER PILOT ENGINEER. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $64.85 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL "DUAL PURPOSE" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITED OR IN CONJUCTION WITH THE JOB SITE. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $61.28 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 5: OILER (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $54.07 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS GROUP A (BUILDING CONSTRUCTION): SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER). (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $54.93 + $33.20 fringe
- added POWER EQUIPMENT OPERATORS GROUP A(1) (BUILDLING CONSTRUCTION): CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) (GROUP A(1) CRANE PREMIUMS: OVER 150', ADD $1.00. OVER 200', ADD $2.00.) (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $55.42 + $33.20 fringe
- added POWER EQUIPMENT OPERATORS GROUP B (BUILDING CONSTRUCTION) BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $53.91 + $33.20 fringe
- added POWER EQUIPMENT OPERATORS GROUP C (BUILDLING CONSTRUCTION): FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS. (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING $51.01 + $33.20 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 was $70.24 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 was $68.58 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 3 "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $61.29 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $58.63 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $57.10 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 6 OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $53.34 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 7 HELICOPTER PILOT . (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $65.74 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $69.96 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $68.37 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 3: HELICOPTER PILOT ENGINEER. (ORANGE, ULSTER AND SULLIVAN COUNTIES NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 was $64.85 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL "DUAL PURPOSE" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITED OR IN CONJUCTION WITH THE JOB SITE. (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $61.28 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $54.07 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: GROUP A SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER). (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. was $54.93 + $33.20 fringe
- removed POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) GROUP A(1): CRANE PREMIUMS 1 OVER 150' :ADD $1.00 2 OVER 200': ADD $2.00 BUILDING CONSTRUCTION NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) was $55.42 + $33.20 fringe
- removed POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $62.35 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 was $60.70 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 was $58.56 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $57.06 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $64.28 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUPGROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE (ORANGE, ULSTER AND SULLIVAN COUNTIES) was $53.34 + $37.50 fringe
- removed POWER EQUIPMENT OPERATORS:: GROUP B BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. was $53.91 + $33.20 fringe
- removed POWER EQUIPMENT OPERATORS:: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS. (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE. was $51.01 + $33.20 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES) | $41.74 | $27.58 | $69.32 | ASBE0040-003 eff. 05/01/2025 |
| INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (SULLIVAN AND ULSTER COUNTIES) | $41.74 | $27.58 | $69.32 | ASBE0040-003 eff. 05/01/2025 |
| HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE COUNTIES) | $46.62 | $49.30 | $95.92 | ASBE0091-002 eff. 06/02/2025 |
| INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (DUTCHESS AND ORANGE COUNTIES) | $46.62 | $49.30 | $95.92 | ASBE0091-002 eff. 06/02/2025 |
BOILERMAKERScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE) | $68.88 | $49.83 | $118.71 | BOIL0005-001 eff. 01/01/2025 |
| BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) | $46.45 | $37.50 | $83.95 | BRNY0005-001 eff. 06/01/2024 |
| BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE COUNTY (TOWN OF TUXEDO)) | $47.44 | $38.00 | $85.44 | BRNY0005-001 eff. 06/01/2024 |
| BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) | $46.45 | $37.50 | $83.95 | BRNY0005-001 eff. 06/01/2024 |
| BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE COUNTY (TOWN OF TUXEDO)) | $47.44 | $38.00 | $85.44 | BRNY0005-001 eff. 06/01/2024 |
| BRICKLAYER (HIGHWAY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER COUNTIES) | $46.45 | $37.50 | $83.95 | BRNY0005-001 eff. 06/01/2024 |
| CARPENTERS (BUILDING CONSTRUCTION): CARPENTERS, MILLWRIGHTS, PILE DRIVERS | $44.72 | $31.23 | $75.95 | CARP0279-005 eff. 07/01/2025 |
| CARPENTERS (HEAVY AND HIGHWAY CONSTRUCTION): CARPENTERS, MILLWRIGHTS, PILE DRIVERS | $44.72 | $31.23 | $75.95 | CARP0279-005 eff. 07/01/2025 |
| MILLWRIGHT (DUTCHESS AND ORANGE COUNTIES) | $47.83 | $43.03 | $90.86 | CARP0740-002 eff. 07/01/2025 |
| DIVER (DUTCHESS AND ORANGE COUNTIES) | $75.46 | $55.84 | $131.30 | CARP1556-005 eff. 07/01/2024 |
| DIVER TENDER (DUTCHESS AND ORANGE COUNTIES) | $55.00 | $55.84 | $110.84 | CARP1556-005 eff. 07/01/2024 |
| DOCK BUILDER & PILEDRIVERMEN (DUTCHESS AND ORANGE COUNTIES) | $60.59 | $55.84 | $116.43 | CARP1556-005 eff. 07/01/2024 |
ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER AND SULLIVAN COUNTIES)Scope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY) | $51.50 | $42.22 | $93.72 | ELEC0363-001 eff. 04/01/2025 |
ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF FISHKILL, EAST FISHKILL AND BEACON) COUNTIES)Scope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY) | $51.50 | $42.22 | $93.72 | ELEC0363-001 eff. 04/01/2025 |
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): FLAGMANScope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $32.51 | $29.93 | $62.44 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (DIGGING MACHINE OPERATOR)Scope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $48.77 | $31.31 | $80.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER)Scope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $43.35 | $30.73 | $74.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)Scope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $43.35 | $30.73 | $74.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): LINEMAN AND TECHNICIANScope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $54.19 | $35.69 | $89.88 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): MECHANICScope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $43.35 | $30.73 | $74.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): LINEMAN AND TECHNICIANScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): FLAGMANScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN DIGGING MACHINE OPERATORScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN TRUCK DRIVERScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)Scope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): MECHANICScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): CABLE SPLICERScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $63.14 | $33.82 | $96.96 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): FLAGMANScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): GROUND MAN TRUCK DRIVERScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): GROUNDMAN DIGGING MACHINE OPERATORScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)Scope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): LINEMAN & TECHNICIANScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): MECHANICScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)Scope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): CABLE SPLICERScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $64.59 | $42.92 | $107.51 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): FLAGMANScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN DIGGING MACHINE OPERATORScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN TRUCK DRIVERScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): LINEMAN & TECHNICIANScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): MECHANICScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY) | $35.34 | $30.12 | $65.46 | ELEC1249-005 eff. 05/05/2025 |
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (DIGGING MACHINE OPERATOR) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY) | $55.40 | $31.78 | $87.18 | ELEC1249-005 eff. 05/05/2025 |
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY) | $49.25 | $31.15 | $80.40 | ELEC1249-005 eff. 05/05/2025 |
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY) | $49.25 | $31.15 | $80.40 | ELEC1249-005 eff. 05/05/2025 |
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): LINEMAN & TECHNICIAN (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY) | $61.56 | $36.21 | $97.77 | ELEC1249-005 eff. 05/05/2025 |
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): MECHANIC (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY) | $49.25 | $31.15 | $80.40 | ELEC1249-005 eff. 05/05/2025 |
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): CABLE SPLICERScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY.) | $40.81 | $6.99 | $47.80 | ELEC1249-008 eff. 01/01/2025 |
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): GROUNDMANScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY.) | $20.53 | $6.39 | $26.92 | ELEC1249-008 eff. 01/01/2025 |
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATORScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY.) | $38.73 | $6.93 | $45.66 | ELEC1249-008 eff. 01/01/2025 |
ELEVATOR MECHANICScope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. AND B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY.) | $76.12 | $38.98 | $115.10 | ELEV0138-001 eff. 01/01/2026 |
POWER EQUIPMENT OPERATOR GROUP 1A (BUILDING CONSTRUCTION): CARRIER- TRAILER HORSE; CONCRETE-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPERSTRUCTURE SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC. (CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE; LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES; POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10 TON UP TO 25 TON) (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $59.04 | $31.32 | $90.36 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 1B (BUILDING CONSTRUCTION): COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $54.41 | $31.32 | $85.73 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 2A (BUILDING CONSTRUCTION): COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $56.97 | $31.32 | $88.29 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 3A (BUILDING CONSTRUCTION): ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR). (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $54.88 | $31.32 | $86.20 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 3B (BUILDING CONSTRUCTION): COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; STUD MACHINE; LADDER HOIST. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $52.25 | $31.32 | $83.57 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 4A (BUILDING CONSTRUCTION): AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT -FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB SITE); ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE GRADING MACHINE; ROOF HOIST (TUGGER HOIST); TELEVISION CAMERAS-WATER- SEWER-GAS-ETC. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $54.33 | $31.32 | $85.65 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 4B (BUILDING CONSTRUCTION): COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $45.94 | $31.32 | $77.26 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING CONSTRUCTION): MOTORIZED ROLLER (WALK BEHIND) (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $49.53 | $31.32 | $80.85 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 5A (BUILDING CONSTRUCTION): MASTER MECHANIC (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $61.95 | $31.32 | $93.27 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 5B (BUILDING CONSTRUCTION): UTILITY MAN (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $47.00 | $31.32 | $78.32 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 6 (BUILDING CONSTRUCTION): WAREHOUSE MAN (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)) | $49.26 | $31.32 | $80.58 | ENGI0137-001 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY): BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANEScope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $68.63 | $35.25 | $103.88 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 1-A (HEAVY & HIGHWAY): AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $60.42 | $35.25 | $95.67 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 1-B (HEAVY & HIGHWAY): ROAD PAVER, ASPHALTScope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $63.70 | $35.25 | $98.95 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 2-A (HEAVY & HIGHWAY): BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETCScope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $57.84 | $35.25 | $93.09 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 2-B (HEAVY & HIGHWAY): MECHANIC (OUTSIDE) ALL TYPESScope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $59.67 | $35.25 | $94.92 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY): A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; WINCH TRUCK "A" FRAME. JOHN HENRY DRILL OR SIMILAR. (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $56.81 | $35.25 | $92.06 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 4-A (HEAVY & HIGHWAY): SERVICE MEN (FUEL OR GREASE TRUCK)Scope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $51.57 | $35.25 | $86.82 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 4-B (HEAVY & HIGHWAY): OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6)Scope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $44.19 | $35.25 | $79.44 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY):OILERScope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $64.02 | $35.25 | $99.27 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 5-A-1 (HEAVY & HIGHWAY): MASTER MECHANICScope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $64.02 | $35.25 | $99.27 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 5-A-2 (HEAVY & HIGHWAY): ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS)Scope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $77.82 | $35.25 | $113.07 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 5-A-3 (HEAVY & HIGHWAY): ENGINEER-- PILE DRIVERScope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $75.13 | $35.25 | $110.38 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 5-A-4 (HEAVY & HIGHWAY): HOIST ENGINEER- STEEL -SUB STRUCTUREScope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $70.41 | $35.25 | $105.66 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATOR GROUP 5-A-5 (HEAVY & HIGHWAY): JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGERScope and notes(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF) | $59.19 | $35.25 | $94.44 | ENGI0137-007 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS GROUP A (BUILDING CONSTRUCTION): SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER). (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) | $54.93 | $33.20 | $88.13 | ENGI0158-006 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS GROUP A(1) (BUILDLING CONSTRUCTION): CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) (GROUP A(1) CRANE PREMIUMS: OVER 150', ADD $1.00. OVER 200', ADD $2.00.) (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) | $55.42 | $33.20 | $88.62 | ENGI0158-006 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS GROUP B (BUILDING CONSTRUCTION) BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) | $53.91 | $33.20 | $87.11 | ENGI0158-006 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS GROUP C (BUILDLING CONSTRUCTION): FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS. (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) | $51.01 | $33.20 | $84.21 | ENGI0158-006 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY): ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $57.30 | $33.55 | $90.85 | ENGI0158-018 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY): ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $56.39 | $33.55 | $89.94 | ENGI0158-018 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $53.82 | $33.55 | $87.37 | ENGI0158-018 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY & HIGHWAY): TOWER CRANES. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $63.30 | $33.55 | $96.85 | ENGI0158-018 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY): CRANES 50 TONS AND OVER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $61.80 | $33.55 | $95.35 | ENGI0158-018 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 6 (HEAVY & HIGHWAY): CRANES 49 TONS AND BELOW. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $60.30 | $33.55 | $93.85 | ENGI0158-018 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 7 (HEAVY & HIGHWAY): MASTER MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $58.91 | $33.55 | $92.46 | ENGI0158-018 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING, HEAVY & HIGHWAY): AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPE); UTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPES);AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR TYPES); BACKHOE; CENTRAL POWER PLANTS (ALL TYPES); CONCRETE PAVING MACHINE (S-240 AND SIMILAR TYPES); CRANES (ALL TYPES,INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); CRANES, GANTRY; DERRICKS (LAND, FLOATING OR CHICAGO BOOM TYPE); DRILLMASTER/QUARTMASTER (DOWN THE HOLE DRILL) ROTARY DRILL; SELF-PROPELLED, HYDRAULIC DRILL, SELF-POWERED DRILL DRAGLINES, ELEVATOR GRADERS, FRONT END LOADERS (5 YDS. AND OVER), GRADALLS, GRADER: RAGO, HELICOPTERS (COPILOT), HELICOPTERS, (COMMUNICATION ENGINEER), LOCOMOTIVE (LARGE), MUCKING MACHINES, PAVEMENT AND CONCRETE BREAKER (SUPERHAMMER, HOE RAM, BROKK 250 AND SIMILAR TYPES), PILE DRIVER (LENGTH OF BOOM INCLUDING LENGTH OF LEADS SHALL DETERMINE PREMIUM RATE APPLICABLE), ROADWAY SURFACE GRINDER SCOOPER (LOADER AND SHOVEL), SHOVELS, TREE CHOOPER WITH BOOM, TRENCH MACHINES, TUNNEL BORING MACHINES. (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $61.72 | $37.50 | $99.22 | ENGI0825-007 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING, HEAVY & HIGHWAY): "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANER; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST IS "OUTSIDE MATERIAL LOWER HOIST"; HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO-BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; STRADDLE CARRIER, ROSS AND SIMILAR TYPES; VACUUM TRUCK; WHIP HAMMER; WINCH TRUCKS (HOISTING). (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $60.13 | $37.50 | $97.63 | ENGI0825-007 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING, HEAVY & HIGHWAY): ASPHALT CURBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINES (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON-SITE; BELT CONVEYOR SYSTEMS; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (A:ROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMOBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONDUCTION WITH GENERATORS); HOISTS (ROOF, TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLE DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION WITH UNLOADING); WELDER AND REPAIR MACHINES. CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; MAINTENANCE OPERATOR; VACUUM BLASTING MACHINE OPERATOR (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $58.22 | $37.50 | $95.72 | ENGI0825-007 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 4 (BUILDING, HEAVY & HIGHWAY): BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $56.59 | $37.50 | $94.09 | ENGI0825-007 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING, HEAVY & HIGHWAY): OILER (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $61.72 | $37.50 | $99.22 | ENGI0825-007 eff. 07/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 6 (BUILDING, HEAVY & HIGHWAY): HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES)Scope and notesNOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $63.54 | $37.50 | $101.04 | ENGI0825-007 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $62.35 | $37.50 | $99.85 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $60.70 | $37.50 | $98.20 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $58.56 | $37.50 | $96.06 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $57.06 | $37.50 | $94.56 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $53.34 | $37.50 | $90.84 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER PILOT. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $64.28 | $37.50 | $101.78 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 1: CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $70.24 | $37.50 | $107.74 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 2: CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $68.58 | $37.50 | $106.08 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 3: "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $61.29 | $37.50 | $98.79 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 4: AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $58.63 | $37.50 | $96.13 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 5: COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $57.10 | $37.50 | $94.60 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 6: OILER. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $53.34 | $37.50 | $90.84 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 7: HELICOPTER PILOT. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $65.74 | $37.50 | $103.24 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $69.96 | $37.50 | $107.46 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $68.37 | $37.50 | $105.87 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 3: HELICOPTER PILOT ENGINEER. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $64.85 | $37.50 | $102.35 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL "DUAL PURPOSE" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITED OR IN CONJUCTION WITH THE JOB SITE. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $61.28 | $37.50 | $98.78 | ENGI0825-008 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 5: OILER (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $54.07 | $37.50 | $91.57 | ENGI0825-008 eff. 07/01/2025 |
IRONWORKER (ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY.) | $42.63 | $53.70 | $96.33 | IRON0417-001 eff. 07/01/2025 |
LABORER - ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (HEAVY & HIGHWAY) GROUP 1: ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY) (DUTCHESS COUNTY) | $44.80 | $32.45 | $77.25 | LABO0017-002 eff. 06/01/2025 |
LABORER - ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (HEAVY & HIGHWAY) GROUP 2: ASBESTOS TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY) (DUTCHESS COUNTY) | $49.40 | $32.45 | $81.85 | LABO0017-002 eff. 06/01/2025 |
| LABORER - ASBESTOS, LEAD, TOXIC, AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (BUILDING CONSTRUCTION) GROUP 1: ASBESTOS ABATEMENT WORK, LEAD ABATEMENT WORK, TOXIC AND HAZARDOUS WASTE RELATED WORK; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (DUTCHESS COUNTY) | $45.40 | $29.75 | $75.15 | LABO0017-002 eff. 06/01/2025 |
| LABORER - ASBESTOS, LEAD, TOXIC, AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (BUILDING CONSTRUCTION) GROUP 2: ASBESTOS ABATEMENT WORK, TOXIC AND HAZARDOUS ABATEMENT, LEAD ABATEMENT WORK, ENVIRONMENTAL WORK. (DUTCHESS COUNTY) | $46.20 | $29.75 | $75.95 | LABO0017-002 eff. 06/01/2025 |
LABORER - TUNNEL, SHAFT, & CAISSON WORK - GROUP 1: LABORER, PIT AND DUMPMAN, CHUCK TENDER, BRAKEMAN AND POWDER; MINER AND ALL MAVHINE MEN, SAFETY MINER, ALL SHAFT WORK, CASSON WORK, DRILLING, BLOW PIPE, ALL AIR TOOLS, TUGGER SCALING, NIPPER GUNNITING SROM POT TO NOZZLE, BIT GRINDER, SINGAL MAN (TOP AND BOTTOM), SHIFT STEWARD, CONCRETE MAN, SHIELD DRIVEN TUNNEL, MIXED FACE AND SOFT GROUND LINER PLATE TUNNEL IN FREE AIRScope and notes(FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY) | $48.05 | $29.50 | $77.55 | LABO0017-002 eff. 06/01/2025 |
| LABORER (BUILDING CONSTRUCTION) GROUP 1: CUSTODIAL WORK, FLAG PERSON, PORTABLE GENERATOR TENDER, PORTABLE PUMP TENDER, PITMAN AND DUMPMAN, FIREWATCH, TEMPORARY HEAT TENDER, TEMPORARY LIGHT TENDER, TRAFFIC CONTROL, TOOL ROOM TENDER; ARTIFICIAL TURF, AIR CHIPPING HAMMER ACOUSTIC PUMP AND MIXER, CARPENTER TENDER, CONCRETE, CONCRETE CURB AND SIDEWALK FORM SETTER, CONCRETE FORM STRIPPING, CONCRETE SEALING, CONCRETE CURING, CONCRETE FINISHER, CONCRETE VIBRATOR, COMPRESSOR, CLEAN UP AFTER TRADES, DISMANTLING DEMOLITION, EXCAVATION, FIREPROOFING, FOUNDATION AND BUILDING PIPING, PUMP AND MIXER, GUNITE, GENERAL CLEAN UP, GRADE CHECKER, GRADING AND BACKFILLING, HOISTS, HOD CARRIER, LANDSCAPING, MASON TENDER, MULTI BUILDING TRADES TENDER, JACKHAMMER, PAVEMENT BREAKER, POURED GYPSUM ROOF WORK, POWER TAMPERS, POWER WALK BEHIND ROLLER, PRESSURE BLASTING, POWER MIXER, SCAFFOLDING, SNOW REMOVAL, SIGNAL PERSON, SANDBLASTING, STYROFOAM AND SIMILAR INSTALLATION, RADIO CONTROL EQUIPMENT INCLUDING BUT NOT LIMITED TO RADIO CONTROL TAMPERS AND ROLLERS, RADIO CONTROL EXCAVATOR, ALL ERECTING AND DISMANTLING OF SCAFFOLD FOR MASONRY REGARDLESS OF HEIGHT, WALKING AND RIDING POWER BUGGIES, TEMPORARY WEATHER PROTECTION, WRECKING, WATERPROOFING, STONE AND TILE TENDERS, RADIO CONTROLLED HAMMERS AND BREAKERS, UNLOADING OF TRUCKS, AIR TRACK, ASSEMBLING AND PLACING GABION BASKETS, ASPHALT, BLASTER, BOB CAT TYPE MACHINE FOR DEMO AND CLEAN UP, CHAIN LINK FENCE, CHAIN SAW, CHIPPING HAMMER, CONCRETE CONVEYOR BELT, SAW, CORE DRILL, CORRUGATED PIPE, CONSTRUCTION SPECIALIST, CLEANING MACHINE, CONCRETE FORM SETTER, CONDUIT LAYER, CUTTING TORCH, DISCHARGE PIPE, DRILL CHUCK TENDER, DUCT BANK LAYER, EXPLOSIVE HANDLER, HYDRAULIC SPLITTER, GRANITE OR STONE CURBING, HANDLER, JOY AND JIB DRILL, INGERSOLL RAND HEAVY DUTY CRAWLER MASTER TYPE HCMZ DRILL MACHINES OR EQUIVALENT, LASER LEVEL, NONMETALLIC PIPE LAYER, METALLIC PIPE LAYER, LEROI HYDRAULIC DRILL OR SIMILAR, MEGA MIXER, POWER FORK LIFT, PRESTRESSED AND PRECAST CONCRETE, POWER BRUSH CUTTER, PUMP CRETE MACHINE, RETAINING WALLS, RIP RAP, RETENTION AND TOXIC AND HAZARDOUS WASTE LINERS, SETTING OF BLOCK, SETTING OF BLOCK, SETTING OF BRICK, SETTING OF STONE, SOUND BARRIERS, TRANSIT UNDER LABORERS JURISDICTION, TOW BEHIND CONCRETE OR GROUT PUMP, TRAFFIC AND PEDESTRIAN STRIPPING, SURFACE PLANNER, MANUFACTURED CURB, WALK BEHIND DURFACE PLANNER, WAGON DRILL, WELDING; * ASBESTOS ABATEMENT WORK, LEAD ABATEMENT WORK, TOXIC AND HAZARDOUS WASTE RELATED WORK; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (ORANGE AND ULSTER COUNTIES) | $35.95 | $27.15 | $63.10 | LABO0017-002 eff. 06/01/2025 |
| LABORER (BUILDING CONSTRUCTION) GROUP 2: FORKLIFT FOR MASONRY PURPOSES (ORANGE AND ULSTER COUNTIES) | $37.75 | $27.15 | $64.90 | LABO0017-002 eff. 06/01/2025 |
| LABORER (BUILDING CONSTRUCTION) GROUP 3: ASBESTOS ABATEMENT WORK, TOXIC AND HAZARDOUS ABATEMENT, LEAD ABATEMENT WORK, ENVIRONMENTAL WORK. (ORANGE AND ULSTER COUNTIES) | $40.50 | $27.15 | $67.65 | LABO0017-002 eff. 06/01/2025 |
LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 1: FLAGPERSON, GATEPERSON (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY)(ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $40.80 | $32.45 | $73.25 | LABO0017-002 eff. 06/01/2025 |
LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 2: GENERAL LABORERS, CHUCK TENDER, HANDLING AND DISTRIBUTING DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR MAN, SPRAYING, BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CRUB AND SIDEWALK FROM SETTER; PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL PERSON, PIPELAYER, PIPELINING AND RELINING, WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL, ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TRACK, JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL PASSER AND OTHER MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK, WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER, GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN, CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING COMING UNDER LABORERS JURISDICITION, BIT GRINDER, OPERATOR OF FORM PIN PULLER AND DRIVERS, SANDBLASTING, JOINT AND JET SEALER, FILLING AND WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST CONCRETE BRICK, BLOCK AND STONE PAVERS, POWER TOOLS USED TO PERFORM WORK USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF, PLASTER AND ACOUSTIC PUMP, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIALS ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS, ARTIFICIAL TURF, RETAINING WALLS, WALK BEHIND SURFACE PLANER, WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO STITCHING, SEAMING, HEAT WELDING, FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER, MANHOLE, CATCH BASIN OR INLET INSTALLING, LASE MEN. GROUND MAN ON MILLING MACHINE. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $44.80 | $32.45 | $77.25 | LABO0017-002 eff. 06/01/2025 |
LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 3: INGERSOLL RAND EAVY DUTY CRAWLER MASTER TYPE HCMZ ANY DRILL USING 4" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLUDING GRADE, PIPE, CONCRETE, CLEARING, BLACKTOP, DRILL, PAVING AND BLASTER ETC., HYDRAULIC DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY, BLASTER AND ASPHALT SCREEDMAN. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $49.40 | $32.45 | $81.85 | LABO0017-002 eff. 06/01/2025 |
LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIALABATEMENT FOREMAN. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $54.70 | $32.45 | $87.15 | LABO0017-002 eff. 06/01/2025 |
| LABORERS (BUILDING CONSTRUCTION) GROUP 1: MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS. (DUTCHESS COUNTY) | $41.10 | $32.90 | $74.00 | LABO0235-003 eff. 06/01/2025 |
| LABORERS (BUILDING CONSTRUCTION) GROUP 2: HOD CARRIERS, PLASTERERS' TENDERS, SCAFFOLD BUILDERS (PADLOCK AND SELF-SUPPORTING SCAFFOLD 14 FT. OR UNDER ALL RUNWAYS, MORTAR MIXERS) MACHINE AND HAND, CONCRETE MIXERS BY MACHINE UNDER 21E, VIBRATORS, FORM SETTERS, ASPHALT RAKERS, HANDLING REINFORCEMENT RODS, DRILLERS, JACKHAMMER, OPERATOR, SIGNALMAN, GUNNITING, MOTORBUGS, WATER PUMP 2"" OR UNDER BARCO MACHINE, WRECKERS, PAVING BREAKERS, POWER SAW OPERATORS, OTHER MACHINE OPERATORS. (DUTCHESS COUNTY) | $42.22 | $32.90 | $75.12 | LABO0235-003 eff. 06/01/2025 |
| LABORERS (BUILDING CONSTRUCTION) GROUP 3: BLASTERS, LASER BEAM OPERATOR. (DUTCHESS COUNTY) | $43.45 | $32.90 | $76.35 | LABO0235-003 eff. 06/01/2025 |
LABORERS (HEAVY & HIGHWAY) GROUP 1: FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOMS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY.) (DUTCHESS COUNTY) | $36.45 | $27.80 | $64.25 | LABO0235-005 eff. 05/01/2023 |
LABORERS (HEAVY & HIGHWAY) GROUP 2: GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDERMAN, HIGHSCALERS, POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY.) (DUTCHESS COUNTY) | $42.80 | $27.80 | $70.60 | LABO0235-005 eff. 05/01/2023 |
LABORERS (HEAVY & HIGHWAY) GROUP 3: ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWINGScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY.) (DUTCHESS COUNTY) | $43.90 | $27.80 | $71.70 | LABO0235-005 eff. 05/01/2023 |
| GLAZIER (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) | $49.20 | $57.20 | $106.40 | PAIN0009-004 eff. 05/01/2025 |
| PAINTERS: DRYWALL FINISHERS | $35.94 | $24.66 | $60.60 | PAIN0155-003 eff. 05/01/2021 |
| PAINTERS: LEAD ABATEMENT WORK | $35.94 | $24.66 | $60.60 | PAIN0155-003 eff. 05/01/2021 |
| PAINTERS: PAINTER/PAPERHANGER | $35.94 | $24.66 | $60.60 | PAIN0155-003 eff. 05/01/2021 |
| PAINTERS: SPRAY RATE | $36.94 | $24.66 | $61.60 | PAIN0155-003 eff. 05/01/2021 |
| PAINTER: STRUCTURAL STEEL AND BRIDGE (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) | $56.25 | $55.14 | $111.39 | PAIN0806-008 eff. 10/01/2024 |
| PLUMBER/PIPEFITTER (ZONE 2 DUTCHESS COUNTY AND THE REMAINDER OF ULSTER COUNTY) | $60.66 | $45.35 | $106.01 | PLUM0021-005 eff. 05/01/2025 |
| PLUMBER; STEAMFITTER (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK) | $53.20 | $46.57 | $99.77 | PLUM0373-002 eff. 05/01/2025 |
| REFRIGERATION MECHANIC (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK) | $41.99 | $37.38 | $79.37 | PLUM0373-002 eff. 05/01/2025 |
| PLUMBER; STEAMFITTER (SULLIVAN COUNTY (TOWNSHIPS OF LUMBERLAND, FORESTBURGH, HIGHLAND, TUSTEN, MAMAKATING, FALLSBURGH, THOMPSON, BETHEL, COCHECTON, DELAWARE, FREEMONT, CALLICOON, LIBERTY, MONTICELLO, NEVERSINK AND ROCKLAND); ORANGE COUNTY (REMAINING TOWNSHIPS) AND ULSTER COUNTY (TOWNS OF SHAWANGURK, WAWARSING, PLATTEKILL, MARLBORO AND ELLENVILLE UP TO NAPANOCH PRISON)) | $53.20 | $46.57 | $99.77 | PLUM0373-003 eff. 05/01/2025 |
| ROOFER | $50.25 | $32.62 | $82.87 | ROOF0008-002 eff. 05/01/2025 |
| SPRINKLER FITTER | $57.20 | $32.66 | $89.86 | SFNY0669-002 eff. 01/01/2026 |
| SHEET METAL WORKER | $55.29 | $47.43 | $102.72 | SHEE0038-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 1- DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKSScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $37.91 | $46.37 | $84.28 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 1A- DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONSScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $39.03 | $46.37 | $85.40 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 2- DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE TRUCKSScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $37.35 | $46.37 | $83.72 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 3- DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FUEL TRUCKS, BATCH TRUCKS AND ALL OTHER TRACTOR TRAILERSScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $37.13 | $46.37 | $83.50 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 4- DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMENScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $37.02 | $46.37 | $83.39 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 5- DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKSScope and notes(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $36.90 | $46.37 | $83.27 | TEAM0445-001 eff. 05/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 3 published 10/08/2026. We format and check the official text; the determination in your contract is what applies.