PrevailCrew

New York prevailing wage rates: NY20260008

Heavy, Highway construction in Cattaraugus, Chautauqua, Erie Counties.

NY20260008, modification 3, published 07/30/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 2

No base or fringe rates changed. The modification may have changed notes or other text.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

NY20260008 wage rates
ClassificationBaseFringeTotalRate ID
HAZARDOUS MATERIAL HANDLER$34.15$26.09$60.24ASBE0004-001
eff. 05/01/2021
ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDE APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS)$37.65$30.69$68.34ASBE0004-001
eff. 05/01/2025
BOILERMAKER$39.35$33.18$72.53BOIL0007-001
eff. 01/01/2025
CEMENT MASON/CONCRETE FINISHER (CHATAUQUA COUNTY AND CATTARAUGUS COUNTY (EXCLUDING TWNSP OF PERRYSBURG))$38.63$25.05$63.68BRNY0008-004
eff. 07/01/2024
TILESETTER & TERRAZZO WORKER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))$31.21$20.54$51.75BRNY0045-001
eff. 07/01/2015
MARBLE SETTER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))$31.72$29.18$60.90BRNY0045-001
eff. 07/01/2020
CEMENT MASON (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))$36.82$31.33$68.15BRNY0045-001
eff. 07/01/2023
BRICKLAYER, STONEMASON (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))$37.44$32.71$70.15BRNY0045-001
eff. 07/01/2024
TERRAZZO FINISHER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))$34.71$17.54$52.25BRNY0045-001
eff. 07/01/2024
TILE FINISHER (ERIE, CATTARAUGUS (TOWNS OF PERRYSBURG & GOWANDA))$34.71$17.54$52.25BRNY0045-001
eff. 07/01/2024
CARPENTERS: (CHAUTAUQUA; CATTARAUGUS (REMAINDER OF COUNTY)
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS

$38.18$26.11$64.29CARP0276-002
eff. 07/01/2024
CARPENTER, HEAVY & HIGHWAY (ERIE (GRAND ISLAND))
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS

$41.19$31.55$72.74CARP0276-013
eff. 07/01/2024
CARPENTER, HEAVY & HIGHWAY (CATTARAUGUS (TOWNSHIPS OF PERSIA AND PERRYSBURG))
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS

$38.18$26.11$64.29CARP0276-021
eff. 07/01/2024
CABLE SPLICER (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MANSFIELD, NEW ALBION, OTTO, PERRYSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))$36.73$23.39$60.12ELEC0041-007
eff. 04/01/2014
ELECTRICIAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MANSFIELD, NEW ALBION, OTTO, PERRYSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))$44.50$36.06$80.56ELEC0041-007
eff. 05/26/2025
COMMUNICATIONS SYSTEM (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))$14.20$14.02$28.22ELEC0041-008
eff. 05/26/2025
COMMUNICATIONS SYSTEM, INSTALLER (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))$22.90$21.38$44.28ELEC0041-008
eff. 05/26/2025
COMMUNICATIONS SYSTEM, MASTER TECHNICIAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))$44.50$36.05$80.55ELEC0041-008
eff. 05/26/2025
COMMUNICATIONS SYSTEM, SOUND WIREMAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MASNFIELD, NEW ALBION, OTTO, PERRSBURG, PERSIA AND YORKSHIRE TOWNSHIPS))$44.50$36.05$80.55ELEC0041-008
eff. 05/26/2025
CABLE SPLICER (CHAUTAUQUA, CATTARAUGUS (REMAINDER OF COUNTY))$35.75$20.68$56.43ELEC0106-002
eff. 01/01/2014
ELECTRICIAN (CHAUTAUQUA, CATTARAUGUS (REMAINDER OF COUNTY))$42.50$27.23$69.73ELEC0106-002
eff. 01/01/2024
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$31.72$29.87$61.59ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$47.57$31.03$78.60ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$52.86$35.60$88.46ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$61.56$36.21$97.77ELEC1249-004
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.14$33.82$96.96ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)$64.59$42.92$107.51ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$35.34$30.12$65.46ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.34$30.12$65.46ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)$35.34$30.12$65.46ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$55.40$31.78$87.18ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.40$31.78$87.18ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab$55.40$31.78$87.18ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.56$36.21$97.77ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins$61.56$36.21$97.77ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY$40.81$6.99$47.80ELEC1249-008
eff. 01/01/2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY$20.53$6.39$26.92ELEC1249-008
eff. 01/01/2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY$38.73$6.93$45.66ELEC1249-008
eff. 01/01/2025
ELEVATOR MECHANIC
Scope and notes

FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

$62.39$38.44$100.83ELEV0014-001
eff. 01/01/2025
POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER, AUTOMATIC FINE GRADE MACHINE (CMI AND SIMILAR TYPE), ARCHER HOIST, BACKHOE AND PULL HOE (TRACTOR MOUNTED AND RUBBER MOUNTED), BACK FILLING MACHINE, BELT PLACE (CMI AND SIMILAR), BENDING MACHINE (PIPE), BITUMINOUS SPREADER AND MIXER, BLACK TOP PLANT (AUTOMATED), BLACK TOP PLANT (NON-AUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACK MOUNTED), BLOWER FOR BURNING BRUSH, BOILER (WHEN USED FOR POWER), BOOM TRUCKS, BORING MACHINE, BULLDOZER, CABLEWAY CAGE HOIST, CAISSON AUGER, CENTRAL MIX PLANT (AND ALL CONCRETE BATCHING PLANTS), CHERRY PICKER (OVER 5 TONS), CHERRY PICKER (UNDER 5 TONS), CHIPPING MACHINE AND CHIP SPREADER, CONCRETE CURB AND GUTTER MACHINES, CONCRETE CURING MACHINE, CONCRETE MIXER (OVER 1/2 CU. YD.) CONCRETE PAVEMENT SPREADERS AND FINISHERS, CONCRETE PAVER, CONCRETE PUMP, CONCRETE SAW (SELF-PROPELLED), CONVEYOR, CORE DRILL, CRANE, CRUSHER, DERRICK OPERATOR, DRAGLINE, DREDGE, DRILL RIG (TRACTOR MOUNTED), DUAL DRUM PAVER, ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEMS, ELEVATING GRADER SELF- PROPELLED OR TOWED), ELEVATOR EXCAVATOR (ALL PURPOSE, HYDRAULCALLY OPERATED) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, FORKLIFT, FRONT END LOADER, GENERATOR (10 OUTLETS OR MORE), GRADALL, GRADER, GROUT OR GUNITE MACHINE, HEAD TOWER, HOIST-ONE DRUM, HOISTING ENGINE, HYDRAULIC BOOM, HYDRAULIC HAMMER, (SELF PROPELLED), HYDRAULIC PIPE JACK MACHINE (OR SIMILAR TYPE MACHINE), HYDRAULIC SYSTEM PUMPS, HYDRO CRANE, HYDRO HAMMER (OR SIMILAR TYPE), INDUSTRIAL TRACTOR, JERSEY SPREADER, KOLMAN PLANT LOADER (AND SIMILAR TYPE LOADERS), LOCOMOTIVE, LUBRICATION TRUCK, MAINTENANCE ENGINEER, MAINTENANCE LUBRICATION UNIT OR TRUCK, MINE HOIST, MIXR FOR STABILIZED BASE (SELF-PROPELLED), MONORAIL, MOTORIZED HYDRAULIC PIN PULLER, MOTORIZED HYDRAULIC SEEDER MUCKING MACHINE, MULCHING MACHINE, MULTIPLE DRUM HOIST (MORE THAN 1 DRUM IN USE), OVERHEAD CRANE, PEINE CRANE (OR SIMILAR TYPE), PILE DRIVER, PLANT ENGINEER, PNEUMATIC MIXER, POST HOLE DIGGER, POWER BOOM, PUMP CRETE, PUSH OR SNATCH CAT, QUARRY MASTER OR EQUIVALENT ROAD WIDENER, ROCK BIT SHARPENER (ALL TYPES), ROLLER (ALL), ROLLING MACHIN (PIPE), ROTOMILL, SCOOPMOBILE, SHOVEL, SIDE BOOM, SKIMMER, SLIP FORM PAVER (CMI AND SIMILAR TYPE, FIRST AND SECOND OPERATOR), SNORKEL, STRATO-TOWER, STUMP CHIPPING MACHINE, TIRE TRUCK AND REPAIR, TOWED ROLLER, TRACTOR DRAWN BELT TYPE GRADER/LOADER, TRACTOR SHOVEL, TRACTOR WITH TOWED ACCESSORIES, TRACTORS (WHEN USING WINCH POWER), TRACTORS, TRENCHER, TRUCK CRANE, TUNNEL SHOVEL, TUBE FINISHER (CMI AND SIMILAR TYPE), VIBRATORY COMPACTOR, VIBRO TAMP, WELL DRILLING MACHINE, WELL POINT, WINCH, WINCH TRUCK WITH "A" FRAME. NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$47.39$36.89$84.28ENGI0017-012
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 OR LESS), COMPRESSORS: (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS, DUST COLLECTORS, GENERATORS, MECHANICAL HEATERS, PUMPS, WELDING MACHINES (FOUR OF ANY TYPE OR COMBINATION), CONCRETE MIXER (1/2 CU. YD. AND UNDER), FIREMAN, FORM TAMPER, FUEL TRUCK, HEATING BOILER (USED FOR TEMPRORY HEAT), JEEP TRENCHER, POWER HEATERMAN, POWER PLANT IN EXCESS OF 10 K.W., PUMP (4" OR OVER), REVINIUS WIDENER, STEM CLEANER, STUMP CHIPPING MACHINE, WELDING MACHINE (1 MACHINE OVER 300 AMPS OR 2 OR 3 MACHINES REGARDLESS OF AMPS). NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$42.89$36.89$79.78ENGI0017-012
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES 5 - 60 TONS
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$50.64$36.89$87.53ENGI0017-012
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 4 CRANES 61 - 199 TONS
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$51.64$36.89$88.53ENGI0017-012
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 200 - 399 TONS
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$52.14$36.89$89.03ENGI0017-012
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 400 TONS & OVER
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$52.64$36.89$89.53ENGI0017-012
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MECHANIC
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$48.46$36.89$85.35ENGI0017-012
eff. 07/01/2025
IRONWORKER (FENCE ERECTORS)$34.06$30.80$64.86IRON0006-003
eff. 07/01/2024
IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING STEEL, WELDERS, RIGGERS AND RODMAN)$35.49$32.30$67.79IRON0006-003
eff. 07/01/2024
IRONWORKER (WINDOW ERECTORS)$33.14$32.30$65.44IRON0006-003
eff. 07/01/2024
IRONWORKER$35.49$32.30$67.79IRON0006-015
eff. 07/01/2024
IRONWORKER: SHEETER$35.49$32.30$67.79IRON0006-015
eff. 07/01/2024
LABORER GROUP 1 LABORERS; FLAGMEN; OUTBOARD AND HAND BOATS; DEMOLITION WORKER; IBC BARRIERS (EXCEPT ON STRUCTURES); GUARD RAILS;ROAD MARKERS (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$34.66$28.65$63.31LABO0210-003
eff. 07/01/2023
LABORER GROUP 2 BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER MORTAR MIXER; PAVEMENT BREAKER; HANDLERS OF ALL STEEL MESH; SMALL GENERATORS FOR LABORERS' TOOLS; INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE ROLLERS; TAMPER; DRILL DOCTOR; TAIL OR SCREW OPERATOR ON ASPHALT PAVER; WATER PUMP (2" AND SINGLE DIAPHRAM); NOZZLE (ASPHALT, GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING LABORERS; LASER MAN (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$34.86$28.65$63.51LABO0210-003
eff. 07/01/2023
LABORER GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; WELDER (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$35.06$28.65$63.71LABO0210-003
eff. 07/01/2023
LABORER GROUP 4 BLASTERS; CURB & FLAT WORK FORM SETTERS (EXCEPT ON STRUCTURES); STONE OR GRANITE CURB SETTERS (ERIE COUNTY HEAVY & HIGHWAY) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$35.26$28.65$63.91LABO0210-003
eff. 07/01/2023
LABORER GROUP 1: GENERAL; FLAGMAN; TOP MAN; WRECKERS (ERIE COUNTY SEWER/WATER)$34.66$28.65$63.31LABO0210-003
eff. 07/01/2023
LABORER GROUP 1: MOLE NIPPER; POWDER HANDLER; TOP LABORER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$36.16$28.65$64.81LABO0210-003
eff. 07/01/2023
LABORER GROUP 2: AIR SPADE; JACKHAMMER; PAVEMENT BREAKER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$36.31$28.65$64.96LABO0210-003
eff. 07/01/2023
LABORER GROUP 2: FOUNDATION; ROD CARRIERS; PLASTER TENDER; SCAFFOLD BOOTMAN; PNEUMATIC, GAS, ELECTRIC TOOL OPERATOR; JACKHAMMER; CHIPPING GUNS (ERIE COUNTY SEWER/WATER)$34.76$28.65$63.41LABO0210-003
eff. 07/01/2023
LABORER GROUP 3: MORTAR MIXER OVER 8 FEET IN DEPTH: (ERIE COUNTY SEWER/WATER)$34.81$28.65$63.46LABO0210-003
eff. 07/01/2023
LABORER GROUP 3: TOP BELL (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$36.41$28.65$65.06LABO0210-003
eff. 07/01/2023
LABORER GROUP 4: PAVEMENT FORMSETTER; STEELBURNER; CAISSON; WAGON DRILL OPERATOR; PIPELAYER; SWING SCAFFOLD (ERIE COUNTY SEWER/WATER)$34.91$28.65$63.56LABO0210-003
eff. 07/01/2023
LABORER GROUP 4: BOTTOM BELL; SIDE OR ROOFBELT DRILLER; BURNERS; TRACKMEN; NIPPERS; DERAILMEN; HOSEMEN; GROUTMEN; GRAVELMEN; FORM WORKERS; MOVERS & SHAFTMEN; CONVEYORMEN (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$36.91$28.65$65.56LABO0210-003
eff. 07/01/2023
LABORER GROUP 5: UTILITY PAVE DRIVER; LASER OPERATOR (ERIE COUNTY SEWER/WATER)$35.26$28.65$63.91LABO0210-003
eff. 07/01/2023
LABORER GROUP 5: POWDER MONKEY (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$37.01$28.65$65.66LABO0210-003
eff. 07/01/2023
LABORER GROUP 6: BLASTER (ERIE COUNTY SEWER/WATER)$35.66$28.65$64.31LABO0210-003
eff. 07/01/2023
LABORER GROUP 6: BLASTERS; IRONMEN; WELDER; HEADING DRILLER (ERIE COUNTY TUNNEL FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$37.41$28.65$66.06LABO0210-003
eff. 07/01/2023
LABORER GROUP 7: PILEDRIVER; RIGGER (ERIE COUNTY TUNNEL) FOR HEAVY/HIGHWAY & TUNNEL: ADDITIONAL $1.00 ADDED TO BASE RATE FOR ALL DELEADER & ASBESTOS WORK. ADDITIONAL $2.00 ADDED TO BASE RATE FOR ALL HAZARDOUS WASTE WORK$37.66$28.65$66.31LABO0210-003
eff. 07/01/2023
LABORERS: HEAVY AND HIGHWAY (ZONE I) GROUP 1$33.93$28.69$62.62LABO0621-001
eff. 07/01/2025
LABORERS: HEAVY AND HIGHWAY (ZONE I) GROUP 2$34.33$28.69$63.02LABO0621-001
eff. 07/01/2025
LABORERS: HEAVY AND HIGHWAY GROUP 2: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS; DESIGNATED ASPHALT RAKERS (NOT TO INCLUDE COLD PATCH), TAIL OR SCREW OPERATOR ON ASPHALT PAVER. ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, POWDERMAN. (CATTARAUGUS COUNTY AND CHAUTAUQUA COUNTY (REMAINING TOWNSHIPS))$34.33$28.69$63.02LABO0621-002
eff. 07/01/2025
LABORERS: HEAVY AND HIGHWAYGROUP 1: FLAGMAN, OUTBOARD AND HAND BOATS, BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOT, GIN BUGGY, HAND OR MACHINE VIBRATOR JACK HAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLER OF ALL STEEL MESH, SMALL GENERATOR FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPE LAYERS, VIBRATOR TYPE ROLLERS, TAMPER DRILL DOCTOR, WATER PUMP OPERATOR (1 1/2" AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNITE, SEEDING AND SANDBLASTING) LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABORERS. (CATTARAUGUS COUNTY AND CHAUTAUQUA COUNTY (REMAINING TOWNSHIPS))$33.93$28.69$62.62LABO0621-002
eff. 07/01/2025
PAINTERS: CATTARAUGUS, CHAUTAUQUA & ERIE COUNTIES$38.50$28.40$66.90PAIN0004-001
eff. 05/01/2019
PAINTERS:, BUILDING CONSTRUCTION: BRUSH AND ROLLER (ERIE COUNTY)$33.00$28.21$61.21PAIN0004-001
eff. 05/01/2025
PAINTERS:, BUILDING CONSTRUCTION: DRYWALL/TAPING (ERIE COUNTY)$34.00$28.51$62.51PAIN0004-001
eff. 05/01/2025
PAINTERS:, BUILDING CONSTRUCTION: WALLCOVERING (ERIE COUNTY)$33.00$28.21$61.21PAIN0004-001
eff. 05/01/2025
PAINTERS: BRIDGE PAINTER (HEAVY & HIGHWAY CONSTRUCTION)$42.06$30.59$72.65PAIN0004-004
eff. 05/01/2023
GLAZIER$34.68$27.64$62.32PAIN0004-007
eff. 05/01/2025
PAINTERS: BRIDGES (CATTARAUGUS COUNTY - Townships of Leon, Conewango, Randolph, South Valley, Napoli and New Albion; CHAUTAUQUA COUNTY - Townships of French Creek, Mina, Ripley, Westfield, Sherman, Clymer, Chautauqua, North Harmony, Harmony, Busti, Ellery, Stockton, Charlotte, Gerry, Ellicott, Jamestown, Kiantone, Carroll, Poland, Ellington and Cherry Creek.)$42.06$30.59$72.65PAIN0004-008
eff. 05/01/2023
PAINTERS: BRIDGES (CATTARAUGUS COUNTY (Townships of Cold Spring, Elko, Mansfield, Little Valley, Salamanca Indian Reservation, Red House, Ellicottville, Great Valley, Carrolton, Franklinville, Humphrey, Allegany, Freedom, Farmersville, Lyndon, Ishua, Hinsdale, Olean and Portville))$42.06$30.59$72.65PAIN0004-017
eff. 05/01/2023
PLASTERER$33.05$25.09$58.14PLAS0009-001
eff. 04/01/2025
CEMENT FINISHER$33.65$31.47$65.12PLAS0111-001
eff. 07/01/2025
PLUMBER/PIPEFITTER: (ZONE 1)$42.20$29.80$72.00PLUM0022-001
eff. 04/29/2024
STEAMFITTER: (ZONE 1)$42.20$29.80$72.00PLUM0022-001
eff. 04/29/2024
PLUMBER/PIPEFITTER: (ZONE 2)$42.20$29.80$72.00PLUM0022-004
eff. 04/29/2024
ROOFERS: COMPOSITION (ERIE COUNTY)$34.96$26.03$60.99ROOF0074-001
eff. 06/01/2024
ROOFERS: SLATE & TILE (ERIE COUNTY)$35.11$26.03$61.14ROOF0074-001
eff. 06/01/2024
ROOFER$23.65$11.99$35.64ROOF0210-005
eff. 06/01/2010
SPRINKLER FITTER$47.85$28.94$76.79SFNY0669-001
eff. 01/01/2026
SHEET METAL WORKER (ERIE COUNTY)$39.50$29.18$68.68SHEE0071-001
eff. 05/27/2024
SHEET METAL WORKER (CATTARAUGUS AND CHAUTAUQUA COUNTIES:)$31.00$24.56$55.56SHEE0112-001
eff. 07/01/2023
TRUCK DRIVERS: GROUP 1 PICKUPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS), SINGLE-AXLE DUMP TRUCKS, DUMPSTERS, TANDEMS, BATCH TRUCKS, MECHANICS SEMI TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANICS, FUEL TRUCKS. (CATTARAUGUS AND CHAUTAUQUA COUNTIES)
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TRUCK DRIVER CLASSIFICATIONS

$49.66$16.82$66.48TEAM0264-001
eff. 07/01/2025
TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT-EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE (ROSS) CARRIER, SELF-CONTAINED CONCRETE UNIT, OFF-HIGHWAY TANDEM BACK-DUMP, TWIN ENGINE EQUIPENT AND DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED. (CATTARAUGUS AND CHAUTAUQUA COUNTIES)
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TRUCK DRIVER CLASSIFICATIONS

$49.66$16.82$66.48TEAM0264-001
eff. 07/01/2025
TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR.
Scope and notes

FOOTNOTE: A. PENSION $56.20 PER DAY B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY

$49.23$8.75$57.98TEAM0449-002
eff. 07/01/2025
TRUCK DRIVERS:: DUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY

$32.00$0.00$32.00TEAM0449-005
eff. 06/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 3 published 07/30/2026. We format and check the official text; the determination in your contract is what applies.