New York prevailing wage rates: NY20260012
Building, Heavy, Highway, Residential construction in Nassau, Suffolk Counties.
NY20260012, modification 3, published 11/05/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 2
No existing rate changed amount.
1 classifications added, 0 removed or reworded
- added PLUMBER, SPRINKLER FITTERS, STEAMFITTERS $70.36 + $54.24 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 | ASBE0012-001 eff. 01/01/2025 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 | ASBE0012-001 eff. 06/01/2025 |
BOILERMAKERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE | $68.88 | $49.83 | $118.71 | BOIL0005-001 eff. 01/01/2025 |
| MASON - STONE | $69.91 | $44.02 | $113.93 | BRNY0001-001 eff. 05/01/2024 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 | BRNY0001-001 eff. 07/01/2024 |
| CARPENTERS: NASSAU COUNTY (REMAINDER OF COUNTY) AND SUFFOLK COUNTY (BUILDING) | $53.56 | $34.28 | $87.84 | CARP0290-001 eff. 07/01/2025 |
| CARPENTERS: (RESIDENTIAL) | $34.14 | $23.15 | $57.29 | CARP0290-001 eff. 07/01/2025 |
| CARPENTERS: (HEAVY & HIGHWAY) | $53.56 | $34.28 | $87.84 | CARP0290-001 eff. 07/01/2025 |
| MILLWRIGHT | $60.83 | $58.03 | $118.86 | CARP0740-001 eff. 07/01/2025 |
| CARPENTERS: DIVERS | $75.46 | $55.84 | $131.30 | CARP1556-008 eff. 07/01/2024 |
| CARPENTERS: (PILEDRIVERMAN) | $60.59 | $55.84 | $116.43 | CARP1556-008 eff. 07/01/2024 |
| CARPENTERS: (DOCKBUILDERS) | $60.59 | $55.84 | $116.43 | CARP1556-008 eff. 07/01/2024 |
| CARPENTERS: (DIVERS TENDERS) | $55.00 | $55.84 | $110.84 | CARP1556-008 eff. 07/01/2024 |
| CARPENTERS: (TIMBERMEN) | $55.59 | $55.41 | $111.00 | CARP1556-011 eff. 07/01/2024 |
| CARPENTER (SOFT FLOOR LAYERS) | $59.05 | $48.08 | $107.13 | CARP2287-003 eff. 07/01/2025 |
| ELECTRICIAN | $64.55 | $47.40 | $111.95 | ELEC0025-001 eff. 04/26/2025 |
| ELECTRICIANS: (TELEPHONE UNIT) | $42.93 | $32.43 | $75.36 | ELEC0025-002 eff. 04/26/2025 |
| ELECTRICIANS: (MAINTENANCE UNIT) | $49.79 | $32.27 | $82.06 | ELEC0025-002 eff. 04/26/2025 |
| LINE CONSTRUCTION: MATERIAL MAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $61.40 | $36.24 | $97.64 | ELEC1049-002 eff. 03/30/2025 |
| LINE CONSTRUCTION: LINEMAN & CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $70.57 | $39.19 | $109.76 | ELEC1049-002 eff. 03/30/2025 |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $56.46 | $34.63 | $91.09 | ELEC1049-002 eff. 03/30/2025 |
| LINE CONSTRUCTION: GROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $42.34 | $30.05 | $72.39 | ELEC1049-002 eff. 03/30/2025 |
ELEVATOR MECHANIC (MODERNIZATION AND REPAIR)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED | $59.09 | $45.56 | $104.65 | ELEV0001-002 eff. 03/17/2022 |
ELEVATOR MECHANIC (ELEVATOR CONSTRUCTOR)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED | $75.14 | $47.45 | $122.59 | ELEV0001-002 eff. 03/17/2022 |
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACTOR (CATERPILLAR OR WHEEL VIBRATOR)Scope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $54.21 | $39.99 | $94.20 | ENGI0138-001 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 4 (BUILDING CONSTRUCTION) COMPRESSOR, COMPRESSOR (ON CRANE), COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORKLIFT (WALK BEHIND, POWER OPERATED), GENERATOR-PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, PUMP (DOUBLE ACTION DIAPHGRGM), PUMP (GYPSUM), TRENCH MACHINE (HAND), WELDING MACHINEScope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $56.54 | $39.99 | $96.53 | ENGI0138-001 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 3(BUILDING CONSTRUCTION) COMRPESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE IN BATTERY), CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE (ASPHALT OR CONCRETE), CURING MACHINE, FIREMAN, HOIST (1 DRUM), MICRO-TRAP, (SELF CONTAINED, NEGATIVE AIR MACHINE), PUMP (4 INCHES OR OVER), PUMP (HYDRAULIC), PUMP (JET), PUMP (SUMBERSIBLE), PUMP (WELL POINT), PULVI-MIXER, RIDGE CUTTER, ROLLER (DIRT), STRIPING MACHINE, VAC-ALL, WELDING AND BURNING, WELDING MACHINE (PILE WORK), WELDING MACHINE (STRUCTURAL STEEL)Scope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $73.78 | $39.99 | $113.77 | ENGI0138-001 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING CONSTRUCTION) BACKHOE, BOOM TRUCK, BULLDOZER, CHERYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST, 2 DRUM, LOADING MACHINE, LOADING MACHINE (FRONT END) MECHANICAL COMPACTORS, (MACHINE DRAWN), MULCH MACHINE (MACHINE-FED), MECHANIC, POWER WINCH, OTHER THAN STONE/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED OTHER THAN STONE STEEL) PUMP (HYDRAULIC, WITH BORING MACHINE), ROLLER, (ASPHALT), SCOOP (CARRY-ALL SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINEScope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $76.44 | $39.99 | $116.43 | ENGI0138-001 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING CONSTRUCTION) ASPHALT SPREADER, BACKHOE CRAWLER CAPACITY OVER CATER- PILLER 225 AND LOMATSU 300, BOILER (THERMOPLASTIC), CHERRY PICKER, OVER 50 TONS, CMI OR MAXIM SPREADER, CONCRETE PUMP (WITH OILER), CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING), CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUM), LOADING MACHINE (BUCKET) CAP OF 10 YDS OR OVER MICRO-TRAP, WITH COMPRESSOR (NEGATIVE AIR MACHINE), MILLING MACHINE, LARGE PILE DRIVER, POWER WINCH, STONE SETTING/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED/STONE STEEL) POWERHOUSE, ROAD PAVER SCOOP, CARRY-ALL, SCRAPER IN TANDEM SHOVEL, SIDEBOOM TRACTOR, SIDEBOOM TRACTOR (USED IN TANK WORK), STONE SPREADER (SELF PROPELLED TANK WORK), ZAMBONI (ICE MACHINE)Scope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $80.43 | $39.99 | $120.42 | ENGI0138-001 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY & HIGHWAY) WELL DRILLERSScope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT $1.00, BOOM LENGHTS (INCLUDING JIB) 150-249 FT $1.50, BOOM LENGHTS (INCLUDING JIB) 250-349 FT $2.00, BOOM LENGTHS (INCLUDING JIB) 350 FT $3.00, CRANES USING CLAMSHELL BUCKETS $.25, FRONT END LOADER 10 YDS AND ABOVE $.25, OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $44.37 | $12.95 | $57.32 | ENGI0138-002 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY & HIGHWAY) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), GRINDER, MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACK TAMPER (2 ENGINEERS, EACH), TRACTOR (CATERPILLAR OR WHEEL), VIBRATOR, WORK BOAT (DECKHAND)Scope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT $1.00, BOOM LENGHTS (INCLUDING JIB) 150-249 FT $1.50, BOOM LENGHTS (INCLUDING JIB) 250-349 FT $2.00, BOOM LENGTHS (INCLUDING JIB) 350 FT $3.00, CRANES USING CLAMSHELL BUCKETS $.25, FRONT END LOADER 10 YDS AND ABOVE $.25, OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $56.55 | $40.15 | $96.70 | ENGI0138-002 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY & HIGHWAY) COMPRESSOR, COMPRESSOR ON CRANE, COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORK LIFT (WALK BEHIND, POWER OPERATED), GENERATOR- PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPOACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, POWER GRINDERS, PUMP (DOUBLE ACTION DIAPHRAGM), PUMP GYPSUM, PUMP (SINGLE ACTION 1 TO 3 INCHES), TRENCH MACHINE HAND, WELDING MACHINEScope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT $1.00, BOOM LENGHTS (INCLUDING JIB) 150-249 FT $1.50, BOOM LENGHTS (INCLUDING JIB) 250-349 FT $2.00, BOOM LENGTHS (INCLUDING JIB) 350 FT $3.00, CRANES USING CLAMSHELL BUCKETS $.25, FRONT END LOADER 10 YDS AND ABOVE $.25, OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $58.93 | $40.15 | $99.08 | ENGI0138-002 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY & HIGHWAY) CURB MACHINE (ASPHALT OR CONCRETE), MAINTENANCE ENGINEER (SMALL EQUIPMENT), MAINTENANCE ENGINEER (WELL-POINT) MECHANIC (FIELDMAN), MICRO-TRAP (SELF CONTAINED, NEGATIVE AIR MACHINE), MILLING MACHINE (SMALL), PULVI-MIXER, PUMP (4 INCHES OR OVER), PUMP HYDRAULIC, PUMP JET, PUMP SUBMERSIBLE, PUMP (WELL POINT), ROLLER DIRT, VAC-ALL, WELDING AND BURNING, COMPRESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE BATTERY), CONCRETE FINISHING MACHINE, CONCRETE SPREADER, CONVEYOR, CURING MACHINE, FIREMAN, HOIST (ONE DRUM), RIDGE CUTTER, STRIPING MACHINE, WELDING MACHINE (PILE WORK), WELDING MACHINE (STRUCTURAL STEEL)Scope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT $1.00, BOOM LENGHTS (INCLUDING JIB) 150-249 FT $1.50, BOOM LENGHTS (INCLUDING JIB) 250-349 FT $2.00, BOOM LENGTHS (INCLUDING JIB) 350 FT $3.00, CRANES USING CLAMSHELL BUCKETS $.25, FRONT END LOADER 10 YDS AND ABOVE $.25, OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $76.61 | $40.15 | $116.76 | ENGI0138-002 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY & HIGHWAY) BULLDOZER, BACKHOE, BOOM TRUCK, BORING MACHINE/AUGUR, CHERRYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST (2 DRUM), LOADING MACHINE, LOADING MACHINE (FRONT END), MECHANICAL COMPACTOR (MACHINE DRAWN), MECHANIC, MULCH MACHINE (MACHINE- FED), POWER WINCH (OTHER THAN STONE/STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/OTHER THAN STONE STEEL), PUMP HYDRAULIC (WITH BORING MACHINE), ROLLER (ASPHALT), SCOOP (CARRY-ALL, SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINE, VERMEER CUTTER, WORK BOATScope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT $1.00, BOOM LENGHTS (INCLUDING JIB) 150-249 FT $1.50, BOOM LENGHTS (INCLUDING JIB) 250-349 FT $2.00, BOOM LENGTHS (INCLUDING JIB) 350 FT $3.00, CRANES USING CLAMSHELL BUCKETS $.25, FRONT END LOADER 10 YDS AND ABOVE $.25, OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $79.33 | $40.15 | $119.48 | ENGI0138-002 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY & HIGHWAY) ASPHALT SPREADER, BACKHOE CRAWLER (CAPACITY OVER CATERPILLER 225 AND KOMATSU 300), BOILER (THERMOPLASTIC), BORING MACHINE (POST HOLE), CGHERRY PICKER (OVER 50 TON), CMI OR MAXIM SPREADER, CONCRETE PUMP, WITH OILER, CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING) CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUMS), LOADING MACHINE (BUCKET) CAPACITY OF 10 YARDS OR OVER, MICRO-TRAP (WITH COMPRESSOR-NEGATIVE AIR MACHINE), MILLING MACHINE (LARGE), PILEDRIVER, POWER WINCH (STONE SETTING STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/STONE STEEL), POWER-HOUSE, ROAD PAVER, SCOOP, CARRY ALL (SCRAPER IN TANDEM), SHOVEL, SIDEBOOM TRACTOR, SIDEBOOM TRACTOR (USED IN TANK WORK), STONE SPREADER (SELF-PROPELLED), TANK WORK, TOWER CRANEScope and notes(NOTES: HAZMAT PREMIUMS: LEVEL A $3.50, LEVEL B $2.50, LEVEL C $1.50, LEVEL D $1.00; TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT $1.00, BOOM LENGHTS (INCLUDING JIB) 150-249 FT $1.50, BOOM LENGHTS (INCLUDING JIB) 250-349 FT $2.00, BOOM LENGTHS (INCLUDING JIB) 350 FT $3.00, CRANES USING CLAMSHELL BUCKETS $.25, FRONT END LOADER 10 YDS AND ABOVE $.25, OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE $.25); (FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY.) | $84.70 | $40.15 | $124.85 | ENGI0138-002 eff. 06/01/2025 |
| IRONWORKER (METALLIC LATHERS AND REINFORCING IRONWORKERS) | $57.00 | $32.96 | $89.96 | IRON0046-003 eff. 07/01/2025 |
| IRONWORKER (STONE DERRICKMAN) | $60.40 | $60.14 | $120.54 | IRON0197-001 eff. 07/01/2024 |
| IRONWORKER: STRUCTURAL | $58.95 | $92.02 | $150.97 | IRON0361-001 eff. 07/01/2025 |
| IRONWORKER: ORNAMENTAL | $48.15 | $67.62 | $115.77 | IRON0580-001 eff. 07/01/2025 |
| LABORERS: PLASTERERS TENDERS (BUILDING) | $42.55 | $34.79 | $77.34 | LABO0066-001 eff. 07/01/2025 |
| LABORERS (BUILDING) | $42.55 | $34.79 | $77.34 | LABO0066-001 eff. 07/01/2025 |
| LABORERS: ASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) | $41.15 | $20.90 | $62.05 | LABO0078-001 eff. 01/06/2025 |
LABORERS: REGULAR LABORERS (HEAVY & HIGHWAY) A.Scope and notesFOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM | $45.49 | $35.98 | $81.47 | LABO1298-001 eff. 06/01/2023 |
LABORERS: ASPHALT SHOVELERS, ROLLER BOYS & TAMPERS (HEAVY & HIGHWAY) A.Scope and notesFOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM | $49.96 | $35.98 | $85.94 | LABO1298-001 eff. 06/01/2023 |
LABORERS: ASPHALT RAKERS; FORMSETTERS (HEAVY & HIGHWAY) A.Scope and notesFOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM | $51.43 | $35.98 | $87.41 | LABO1298-001 eff. 06/01/2023 |
| PAINTER (SPRAY, SCAFFOLD, SANDBLASTING) | $47.75 | $44.11 | $91.86 | PAIN0009-002 eff. 05/01/2025 |
| PAINTER (PAINTERS, DRYWALL FINISHERS) | $44.75 | $44.11 | $88.86 | PAIN0009-002 eff. 05/01/2025 |
| PAINTER (GLAZIERS) | $49.20 | $57.20 | $106.40 | PAIN0009-002 eff. 05/01/2025 |
| PAINTERS: (STUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 | $111.39 | PAIN0806-010 eff. 10/01/2024 |
| PAINTERS: (DRYWALL TAPERS/POINTERS) | $48.47 | $35.91 | $84.38 | PAIN1974-002 eff. 06/28/2025 |
| PLASTERER | $48.51 | $32.78 | $81.29 | PLAS0262-003 eff. 08/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $59.87 | $41.81 | $101.68 | PLAS0780-001 eff. 07/01/2025 |
| PLUMBER (RESIDENTIAL CONSTRUCTION:) | $36.05 | $19.63 | $55.68 | PLUM0200-001 eff. 05/01/2025 |
| PLUMBER (BUILDING CONSTRUCTION:) | $60.73 | $45.75 | $106.48 | PLUM0200-001 eff. 05/01/2025 |
| PLUMBER, SERVICE FITTERS: SERVICE FITTER WORK SHALL CONSIST OF ALL REPAIR, SERVICE AND MAINTENANCE WORK ON DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS ETC., INCLUDING BUT NOT EXCLUSIVELY THE CHARGING, EVACUATION, LEAK TESTING AND ASSEMBLING FOR ALL MACHINES FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND HEATING APPARATUS. ALSO, WORK SHALL INCLUDE ADJUSTING, INCLUDING CAPACITY ADJUSTMENTS, CHECKING AND REPAIRING OR REPLACEMENT OF ALL CONTROLS AND START UP OF ALL MACHINES AND REPAIRING ALL DEFECTS THAT MAY DEVELOP ON ANY SYSTEM FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION AND ALL AIR CONDITIONING, AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS REGARDLESS OF SIZE OR TYPE | $47.85 | $23.96 | $71.81 | PLUM0638-001 eff. 01/01/2026 |
| PLUMBER, SPRINKLER FITTERS, STEAMFITTERS | $70.36 | $54.24 | $124.60 | PLUM0638-001 eff. 01/01/2026 |
| ROOFER | $51.25 | $47.36 | $98.61 | ROOF0154-001 eff. 05/01/2025 |
| SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) | $35.79 | $25.37 | $61.16 | SHEE0028-002 eff. 11/02/2023 |
| SHEET METAL WORKER (BUILDING CONSTRUCTION) | $53.60 | $60.74 | $114.34 | SHEE0028-002 eff. 11/02/2023 |
TRUCK DRIVERScope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK | $45.65 | $56.20 | $101.85 | TEAM0282-002 eff. 07/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 3 published 11/05/2026. We format and check the official text; the determination in your contract is what applies.