NY20260019, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
7 classifications added, 9 removed or reworded
- removed Carpenters (Including Drywall Hanging & Acoustical Ceiling Installation): Millwrights was $32.28 + $25.36 fringe
- added ELECTRICIANS $44.20 + $32.90 fringe
- removed Electricians: Cable Splicers was $37.40 + $27.44 fringe
- removed Electricians: Electricians was $44.20 + $32.90 fringe
- added IRONWORKER $36.25 + $33.12 fringe
- removed Ironworkers: IRONWORKER was $36.25 + $33.12 fringe
- removed POWER EQUIPMENT OPERATOR: Backhoe Operators: Group A1 was $44.23 + $35.40 fringe
- removed POWER EQUIPMENT OPERATOR: Bulldozer: Group A1 was $44.23 + $35.40 fringe
- removed POWER EQUIPMENT OPERATOR: Forklift Operator/Lull: Group A1 was $44.23 + $35.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP A1 BACKHOE OPERATORS $44.23 + $35.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP A1 BULLDOZER $44.23 + $35.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP A1 FORKLIFT OPERATOR/LULL $44.23 + $35.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP A1 LOADER $44.23 + $35.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP A1 ROLLER $44.23 + $35.40 fringe
- removed POWER EQUIPMENT OPERATOR: Loader: Group A1 was $44.23 + $35.40 fringe
- removed POWER EQUIPMENT OPERATOR: Roller: Group A1 was $44.23 + $35.40 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER | $34.15 | $26.09 | $60.24 | ASBE0004-001 eff. 05/01/2025 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDE APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | $37.65 | $30.69 | $68.34 | ASBE0004-001 eff. 05/01/2025 |
| POINTER, CLEANER AND CAULKER | $36.82 | $31.33 | $68.15 | BRNY0045-002 eff. 07/01/2024 |
| MARBLE MASON | $36.85 | $30.80 | $67.65 | BRNY0045-002 eff. 07/01/2024 |
| TILE, MARBLE & TERRAZZO FINISHER | $34.71 | $17.54 | $52.25 | BRNY0045-002 eff. 07/01/2024 |
| TILE & TERRAZZO WORKER | $37.85 | $31.80 | $69.65 | BRNY0045-002 eff. 07/01/2024 |
| BRICKLAYER, STONEMASON | $37.44 | $32.71 | $70.15 | BRNY0045-002 eff. 07/01/2024 |
| CARPENTERS (INCLUDING DRYWALL HANGING & ACOUSTICAL CEILING INSTALLATION) (CARPENTERS AND SOFT FLOOR LAYERS) | $34.26 | $25.94 | $60.20 | CARP0276-016 eff. 07/01/2024 |
| ELECTRICIANS | $44.20 | $32.90 | $77.10 | ELEC0237-001 eff. 05/26/2025 |
ELEVATOR MECHANICScope and notesFOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $62.39 | $38.44 | $100.83 | ELEV0014-001 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP A1 ROLLER | $44.23 | $35.40 | $79.63 | ENGI0017-010 eff. 07/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP A1 LOADER | $44.23 | $35.40 | $79.63 | ENGI0017-010 eff. 07/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP A1 BULLDOZER | $44.23 | $35.40 | $79.63 | ENGI0017-010 eff. 07/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP A1 FORKLIFT OPERATOR/LULL | $44.23 | $35.40 | $79.63 | ENGI0017-010 eff. 07/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP A1 BACKHOE OPERATORS | $44.23 | $35.40 | $79.63 | ENGI0017-010 eff. 07/01/2025 |
| IRONWORKERS: (SHEETER) | $36.25 | $33.12 | $69.37 | IRON0009-003 eff. 07/01/2025 |
| IRONWORKER | $36.25 | $33.12 | $69.37 | IRON0009-003 eff. 07/01/2025 |
LABORERS: GROUP 9 USE OF SUPPLIED AIR RESPIRATORSScope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY | $37.45 | $41.36 | $78.81 | LABO0091-001 eff. 07/01/2023 |
LABORERS: GROUP 8 THE HANDLING, LOADING, UNLOADING, STACKING, DISTRIBUTION, ERECTION AND DISMANTLING OF ANY AND ALL TYPES OF SCAFFOLDING AND/OR WORK PLATFORMS USED IN THE REMOVAL OF INSULATING MATERIAL REGARDLESS OF THE COMPOSITION OF SAID MATERIAL. THE REMOVAL OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS, (PIPES, BOILERS,DUCTS, FLUES, BREECHINGS, ETC.) ON ALL MECHANICAL SYSTEMS (PIPES, BOILERS, DUCTS, FLUES, BREECHING, ETC.) THAT ARE GOING TO BE SCRAPPED. THE REMOVAL OF ALL INSULATING MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT. THE REMOVAL OF ALL ASBESTOS CONTAINING MATERIALS FROM WALLS, CEILINGS, FLOORS, COLUMNS AND ALL OTHER NON-MECHANICAL STRUCTURES AND SURFACES, ETC;Scope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY | $34.45 | $41.36 | $75.81 | LABO0091-001 eff. 07/01/2023 |
LABORERS: GROUP 7 POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS, JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW; POWDER MONKEY; BLACK TOP RAKERS; SCALERS; DRILL TENDERS; MORTAR MIXERS; CONCRETE POLISHING MACHINE; OPERATION & MAINTENANCE OF ALL ROBOTIC REMOTE SYSTEMS IN HAZARDOUS ENVIRONMENT; PERATION C MEN WORKING FROM SWINGING SCAFFOLD BOSUM CHAIR; SUSPENDED CAGE OR BUCKET; WORK IN CAISSONS BELOW 8 FEET; CONCRETE MOTOR BUGGY; ALL OTHER OPERATORS OF MECHANICAL TOOLS, INCLUDING VIBRATORS EGARDLESS OF TYPE OF POWER.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY | $32.75 | $41.36 | $74.11 | LABO0091-001 eff. 07/01/2023 |
LABORERS: GROUP 6 VIDEO MACHINE OPERATOR IN INSPECTION OF PIPEScope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY | $32.95 | $41.36 | $74.31 | LABO0091-001 eff. 07/01/2023 |
LABORERS: GROUP 5 ROAD FINISHER, FORM SETTER, GUNNITE NOZZLEMAN, SANDBLASTERS, BURNING TORCH, CONCRETE SAW OPERATORS, GROUT MACHINE AND GROUT PUMPS OPERATORScope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY | $33.05 | $41.36 | $74.41 | LABO0091-001 eff. 07/01/2023 |
LABORERS: GROUP 4 LASER BEAM OPERATORScope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY | $33.30 | $41.36 | $74.66 | LABO0091-001 eff. 07/01/2023 |
LABORERS: GROUP 3 WAGON DRILL-AIRTRACK, SELF-CONTAINED DRILLScope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY | $33.45 | $41.36 | $74.81 | LABO0091-001 eff. 07/01/2023 |
LABORERS: GROUP 2 BLASTERS, GRADE CHECKER; 10% OF BASE RATEScope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY | $35.70 | $41.36 | $77.06 | LABO0091-001 eff. 07/01/2023 |
LABORERS: GROUP 1 COMMON LABORERS, DECONTAMINATION OF ALL MACHINES; HORIZONTAL DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES WITH ATTACHMENTS/ALL WHEEL OR TRACK TYPESScope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY | $32.45 | $41.36 | $73.81 | LABO0091-001 eff. 07/01/2023 |
| PAINTERS: DRYWALL/TAPING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $34.00 | $28.51 | $62.51 | PAIN0004-009 eff. 05/01/2025 |
| PAINTERS: BRUSH & ROLLER (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | $61.21 | PAIN0004-009 eff. 05/01/2025 |
| PAINTERS: TAPERS/DRY WALL (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $34.00 | $28.51 | $62.51 | PAIN0004-010 eff. 05/01/2025 |
| PAINTERS: PAINTERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | $61.21 | PAIN0004-010 eff. 05/01/2025 |
| GLAZIER | $34.68 | $27.64 | $62.32 | PAIN0004-012 eff. 05/01/2025 |
| PLASTERER | $30.15 | $20.49 | $50.64 | PLAS0111-003 eff. 07/01/2025 |
| CEMENT FINISHER | $33.55 | $34.17 | $67.72 | PLAS0111-003 eff. 07/01/2025 |
| PLUMBER AND STEAMFITTER (ZONE 1) | $42.20 | $29.80 | $72.00 | PLUM0022-005 eff. 04/29/2024 |
| ROOFERS: SLATE & TILE | $35.11 | $26.03 | $61.14 | ROOF0074-002 eff. 06/01/2024 |
| ROOFERS: COMPOSITION | $34.96 | $26.03 | $60.99 | ROOF0074-002 eff. 06/01/2024 |
| SHEET METAL WORKER | $39.50 | $29.18 | $68.68 | SHEE0071-002 eff. 05/27/2024 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.