New York prevailing wage rates: NY20260020
Building, Heavy, Highway, Residential construction in Rockland County.
NY20260020, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
- changed ELEVATOR MECHANIC (THE TOWN OF STONY POINT) base $76.12 → $76.12, fringe $38.99 → $38.98 (−$0.01) Same effective date as before (01/01/2026).
31 classifications added, 42 removed or reworded
- added BRICKLAYER: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (BUILDING/RESIDENTIAL CONSTRUCTION) $47.44 + $38.00 fringe
- removed BRICKLAYER: BUILDING/RESIDENTIAL CONSTRUCTION: Bricklayers, Cement Masons, Plasterers, Stone Masons was $47.44 + $38.00 fringe
- removed BRICKLAYER: HEAVY & HIGHWAY CONSTRUCTION: Bricklayers, Cement Masons, Plasterers, Stone Masons, Pointers, Caulkers & Cleaners was $41.96 + $33.38 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Flagman was $35.34 + $30.12 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Groundman digging machine operator was $55.40 + $31.78 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Groundman Truck driver was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Groundman truck driver (tractor trailer unit) was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Mechanic was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Substation: Cable Splicer was $63.14 + $33.82 fringe
- removed ELECTRICIAN (Line Construction): Substation: Flagman was $35.34 + $30.12 fringe
- removed ELECTRICIAN (Line Construction): Substation: Groundman digging machine operator was $55.40 + $31.78 fringe
- removed ELECTRICIAN (Line Construction): Substation: Groundman truck driver (tractor trailer unit) was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Substation: Lineman & Technician was $61.56 + $36.21 fringe
- removed ELECTRICIAN (Line Construction): Substation: Mechanic was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Cable Splicer was $64.59 + $42.92 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Flagman was $35.34 + $30.12 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Groundman Digging Machine Operator was $55.40 + $31.78 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Groundman Truck Driver was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Lineman & Technician was $61.56 + $36.21 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Mechanic was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Tree Trimmer was $31.45 + $11.42 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) $63.14 + $33.82 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $64.59 + $42.92 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $35.34 + $30.12 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) $35.34 + $30.12 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $35.34 + $30.12 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $55.40 + $31.78 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) $55.40 + $31.78 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab $55.40 + $31.78 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) $61.56 + $36.21 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins $61.56 + $36.21 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $49.25 + $31.15 fringe
- added LABORER CATEGORY A: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) $50.25 + $28.15 fringe
- added LABORER CATEGORY B: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) $50.25 + $28.15 fringe
- added LABORER CATEGORY C: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) $50.25 + $28.15 fringe
- added LABORER CATEGORY D: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) $50.25 + $28.15 fringe
- added LABORER GROUP 1 (HEAVY & HIGHWAY CONSTRUCTION) BLASTERS $52.35 + $28.15 fringe
- added LABORER GROUP 2 (HEAVY & HIGHWAY CONSTRUCTION) TRACK OPERATOR; JOY DRILL OPERATOR $50.25 + $28.15 fringe
- added LABORER GROUP 3 (HEAVY & HIGHWAY CONSTRUCTION) NIPPER, POWER BUGGY OPERATOR; PLASTER TENDER; MIXER MAN (BY MACHINE OR HAND); SCAFFOLD RUNWAY MAN; POWER SAW; BRUSH KING; STEEL ROD CARRIER; JACK HAMMER; WAGON DRILLER; JIB RIG OPERATOR; PAVEMENT BREAKER; VIBRATOR MAN; BIT GRINDER; POWDER MAN; RAMSET OPERATOR; RIP RAP AND DRY STONE LAYER; CEMENT SPRAY MAN; GUNNITE NOZZLE MAN; SPRAY AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE; SAND BLASTER; CONCRETE SAW; ALL OTHER MACHINE OR SEMI-SKILLED MEN; ASBESTOS AND HAZARDOUS WASTE REMOVAL; CONCRETE LABORER; BUILDING LABORER; MASON TENDER; CARPENTER TENDER; PIPE LAYER (ALL TYPES); SIGNAL MAN; GABION BASKET ASSEMBLER; BULL FLOAT MAN; FORM SETTER; LINER; JOINT SETTER; SHEETER; TIP CONCRETE MAN; STUD OR RIVETING GUN MAN; ALL SCALERS; ASPHALT MEN (ALL TYPES); RAIL AND FENCE (ALL TYPES); CORE DRILLER; WRECKING AND DEMOLITION MAN; BAR MAN; SEEDER; PLANTER; LANDSCAPE MEN (ALL TYPES), AX MAN; PIT AND DUMP MEN; ROAD LABORER $46.10 + $28.15 fringe
- added LABORER GROUP 4 (HEAVY & HIGHWAY CONSTRUCTION) FLAG PERSON $42.60 + $28.15 fringe
- removed LABORER: BUILDING & RESIDENTIAL CONSTRUCTION Hazardous Waste Handler was $39.05 + $21.95 fringe
- removed LABORER: BUILDING & RESIDENTIAL CONSTRUCTION: Air track operators, joy drill operators was $37.90 + $21.95 fringe
- removed LABORER: BUILDING & RESIDENTIAL CONSTRUCTION: All types of landscaping, pit men, dump men, building laborers (clean up), Flag Persons was $33.80 + $21.95 fringe
- removed LABORER: BUILDING & RESIDENTIAL CONSTRUCTION: Blasters was $37.05 + $21.95 fringe
- removed LABORER: BUILDING & RESIDENTIAL CONSTRUCTION: Bull float man, stud or riveting gunman, all scalers, power buggy operators (all types), mixer men, (by machine or hand), power saw (all types), brush king, jackhammer, jib rig operators, pavement breakers, vibrator men, powder men, ramset operators, torchmen, cement spray men, gunite nozzle men, sandblasting, all other machine or semi-skilled and asbestos and hazardous waste removal; was $37.05 + $21.95 fringe
- removed LABORER: BUILDING & RESIDENTIAL CONSTRUCTION: Form setter, liners, joint setters, top concrete men was $37.35 + $21.95 fringe
- removed LABORER: BUILDING & RESIDENTIAL CONSTRUCTION: Hod carriers, scaffold and runway men, steel rod carrriers, rip rap and dry stone layers, concrete laborer, mason tenders, piplayers, (all types), signal men, rail and fence men (all types), core drillers, wrecking and demolition men; was $36.81 + $21.95 fringe
- removed LABORER: HEAVY & HIGHWAY CONSTRUCTION Hazardous Waste Handler: Category A was $50.25 + $28.15 fringe
- removed LABORER: HEAVY & HIGHWAY CONSTRUCTION Hazardous Waste Handler: Category B was $50.25 + $28.15 fringe
- removed LABORER: HEAVY & HIGHWAY CONSTRUCTION Hazardous Waste Handler: Category C was $50.25 + $28.15 fringe
- removed LABORER: HEAVY & HIGHWAY CONSTRUCTION Hazardous Waste Handler: Category D was $50.25 + $28.15 fringe
- removed LABORER: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1 was $52.35 + $28.15 fringe
- removed LABORER: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2 was $50.25 + $28.15 fringe
- removed LABORER: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 was $46.10 + $28.15 fringe
- removed LABORER: HEAVY & HIGHWAY CONSTRUCTION: GROUP 4 was $42.60 + $28.15 fringe
- removed PLUMBER: SINGLE FAMILY DWELLINGS was $16.60 + $4.95 fringe
- added POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINE (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (RAILROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONJUCTION WITH GENERATORS); HOISTS (ROOF, TUGGEAERIAL PLATFORM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLD DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONJUCTION WITH UNLOADING); WELDER AND REPAIR MECHANICS; CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR, ULTRA HIGH PRESSURE WATERJET CUTTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 $58.22 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (WELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TWO OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 $56.59 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE REPAIR $52.88 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 6 HELICOPTER PILOTS $63.54 + $37.50 fringe
- added POWER EQUIPMENT OPERATORS: BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION- GROUP 2 "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRYALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 5 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANING; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT,CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST") HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO- BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; "STRADDLE" CARRIER, ROSS AND SIMILAR TYPES; VACUM TRUCK; WHIP HAMMER; WINCH TRUCKS(HOISTING).. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM $0 .50 $60.13 + $37.50 fringe
- removed Power equipment operators: GROUP 2 was $60.13 + $37.50 fringe
- removed Power equipment operators: GROUP 3 was $58.22 + $37.50 fringe
- removed Power equipment operators: GROUP 4 was $56.59 + $37.50 fringe
- removed Power equipment operators: GROUP 5 was $52.88 + $37.50 fringe
- removed Power equipment operators: GROUP 6 was $63.54 + $37.50 fringe
- removed Power equipment operators: RESIDENTIAL CONSTRUCTION: ALL JOB CLASSIFICATION was $11.49 + $7.75 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| INSULATOR/ASBESTOS WORKER (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $46.62 | $49.30 | $95.92 | ASBE0091-001 eff. 06/02/2025 |
| HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) | $46.62 | $49.30 | $95.92 | ASBE0091-001 eff. 06/02/2025 |
BOILERMAKERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE | $68.88 | $49.83 | $118.71 | BOIL0005-001 eff. 01/01/2025 |
| BRICKLAYER: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (BUILDING/RESIDENTIAL CONSTRUCTION) | $47.44 | $38.00 | $85.44 | BRNY0005-005 eff. 06/01/2024 |
| CARPENTERS : (BUILDING AND HEAVY & HIGHWAY CONSTRUCTION) | $50.12 | $31.73 | $81.85 | CARP0279-004 eff. 07/01/2025 |
| CARPENTERS (RESIDENTIAL) | $32.60 | $20.69 | $53.29 | CARP0279-004 eff. 07/01/2025 |
| MILLWRIGHT | $60.83 | $58.03 | $118.86 | CARP0740-001 eff. 07/01/2025 |
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 | CARP1556-006 eff. 07/01/2024 |
| DIVER TENDER | $55.00 | $55.84 | $110.84 | CARP1556-007 eff. 07/01/2024 |
| DIVER | $75.46 | $55.84 | $131.30 | CARP1556-007 eff. 07/01/2024 |
| PIPE BENDING MACHINE OPERATOR | $54.63 | $50.98 | $105.61 | CARP1556-010 eff. 07/01/2019 |
ELECTRICIANS: RESIDENTIAL CONSTRUCTIONScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $51.50 | $42.22 | $93.72 | ELEC0363-006 eff. 04/01/2025 |
ELECTRICIANS: BUILDING, HEAVY & HIGHWAY CONSTRUCTIONScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $51.50 | $42.22 | $93.72 | ELEC0363-006 eff. 04/01/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: MECHANIC.Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 | $74.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN.Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $54.19 | $35.69 | $89.88 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT).Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 | $74.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER).Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 | $74.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE OPERATOR).Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $48.77 | $31.31 | $80.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN.Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $32.51 | $29.93 | $62.44 | ELEC1249-002 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | $33.82 | $96.96 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIANScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $38.73 | $6.93 | $45.66 | ELEC1249-008 eff. 01/01/2025 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $20.53 | $6.39 | $26.92 | ELEC1249-008 eff. 01/01/2025 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.81 | $6.99 | $47.80 | ELEC1249-008 eff. 01/01/2025 |
ELEVATOR MECHANIC (MODERNIZATION AND REPAIR)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED | $59.09 | $45.56 | $104.65 | ELEV0001-002 eff. 03/17/2022 |
ELEVATOR MECHANIC (ELEVATOR CONSTRUCTOR)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED | $75.14 | $47.45 | $122.59 | ELEV0001-002 eff. 03/17/2022 |
ELEVATOR MECHANIC (THE TOWN OF STONY POINT)Scope and notesFOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $76.12 | $38.98 | $115.10 | ELEV0138-002 eff. 01/01/2026 |
| POWER EQUIPMENT OPERATORS: GROUP 1 | $61.72 | $37.50 | $99.22 | ENGI0825-012 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION- GROUP 2 "A" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRYALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 5 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANING; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT,CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST") HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO- BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; "STRADDLE" CARRIER, ROSS AND SIMILAR TYPES; VACUM TRUCK; WHIP HAMMER; WINCH TRUCKS(HOISTING).. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM $0 .50Scope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $60.13 | $37.50 | $97.63 | ENGI0825-012 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 6 HELICOPTER PILOTSScope and notesNOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, AND VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $63.54 | $37.50 | $101.04 | ENGI0825-012 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE REPAIRScope and notesNOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, AND VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $52.88 | $37.50 | $90.38 | ENGI0825-012 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FILL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (WELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TWO OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50Scope and notesFOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, AND VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $56.59 | $37.50 | $94.09 | ENGI0825-012 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINE (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (RAILROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONJUCTION WITH GENERATORS); HOISTS (ROOF, TUGGEAERIAL PLATFORM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLD DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONJUCTION WITH UNLOADING); WELDER AND REPAIR MECHANICS; CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR, ULTRA HIGH PRESSURE WATERJET CUTTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50Scope and notesFOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, AND VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $58.22 | $37.50 | $95.72 | ENGI0825-012 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 6: HELICOTER PILOTScope and notesNOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $64.28 | $37.50 | $101.78 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCEScope and notesNOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. | $53.34 | $37.50 | $90.84 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FARM TRACTORSScope and notesNOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. | $57.06 | $37.50 | $94.56 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHANIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $58.56 | $37.50 | $96.06 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 2: "A" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. | $60.70 | $37.50 | $98.20 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINESScope and notesNOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVINGS DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS. | $62.35 | $37.50 | $99.85 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS(BUILDING CONSTRUCTION TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUNDScope and notesNOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $68.37 | $37.50 | $105.87 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 5: OILERScope and notesNOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $54.07 | $37.50 | $91.57 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STEAM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL "DUAL PURPOSE" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITE OR IN CONJUCTION WITH THE JOB SITEScope and notesNOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $61.28 | $37.50 | $98.78 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 3: HELICOPTER PILOTScope and notesNOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $64.85 | $37.50 | $102.35 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUNDScope and notesNOTES: TUNNEL PREMIUM .75 HAZMAT PREMIUM 20 % HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $69.96 | $37.50 | $107.46 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 7 HELICOPTER PILOTScope and notesNOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $65.74 | $37.50 | $103.24 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 6 OILER, STADDLE CARRIERScope and notesNOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $53.34 | $37.50 | $90.84 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLEScope and notesNOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $57.10 | $37.50 | $94.60 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMAN; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATSScope and notesNOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $58.63 | $37.50 | $96.13 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 3 "A" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMSScope and notesNOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $61.29 | $37.50 | $98.79 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $68.58 | $37.50 | $106.08 | ENGI0825-013 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $70.24 | $37.50 | $107.74 | ENGI0825-013 eff. 07/01/2025 |
IRONWORKER A)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY | $42.63 | $53.70 | $96.33 | IRON0417-001 eff. 07/01/2025 |
LABORER GROUP 4 (HEAVY & HIGHWAY CONSTRUCTION) FLAG PERSONScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S BIRTHDAY, PRESIDENTAL ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $42.60 | $28.15 | $70.75 | LABO0754-001 eff. 06/01/2022 |
LABORER GROUP 3 (HEAVY & HIGHWAY CONSTRUCTION) NIPPER, POWER BUGGY OPERATOR; PLASTER TENDER; MIXER MAN (BY MACHINE OR HAND); SCAFFOLD RUNWAY MAN; POWER SAW; BRUSH KING; STEEL ROD CARRIER; JACK HAMMER; WAGON DRILLER; JIB RIG OPERATOR; PAVEMENT BREAKER; VIBRATOR MAN; BIT GRINDER; POWDER MAN; RAMSET OPERATOR; RIP RAP AND DRY STONE LAYER; CEMENT SPRAY MAN; GUNNITE NOZZLE MAN; SPRAY AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE; SAND BLASTER; CONCRETE SAW; ALL OTHER MACHINE OR SEMI-SKILLED MEN; ASBESTOS AND HAZARDOUS WASTE REMOVAL; CONCRETE LABORER; BUILDING LABORER; MASON TENDER; CARPENTER TENDER; PIPE LAYER (ALL TYPES); SIGNAL MAN; GABION BASKET ASSEMBLER; BULL FLOAT MAN; FORM SETTER; LINER; JOINT SETTER; SHEETER; TIP CONCRETE MAN; STUD OR RIVETING GUN MAN; ALL SCALERS; ASPHALT MEN (ALL TYPES); RAIL AND FENCE (ALL TYPES); CORE DRILLER; WRECKING AND DEMOLITION MAN; BAR MAN; SEEDER; PLANTER; LANDSCAPE MEN (ALL TYPES), AX MAN; PIT AND DUMP MEN; ROAD LABORERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S BIRTHDAY, PRESIDENTAL ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $46.10 | $28.15 | $74.25 | LABO0754-001 eff. 06/01/2022 |
LABORER GROUP 2 (HEAVY & HIGHWAY CONSTRUCTION) TRACK OPERATOR; JOY DRILL OPERATORScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S BIRTHDAY, PRESIDENTAL ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $50.25 | $28.15 | $78.40 | LABO0754-001 eff. 06/01/2022 |
LABORER GROUP 1 (HEAVY & HIGHWAY CONSTRUCTION) BLASTERSScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PRESIDENT'S BIRTHDAY, PRESIDENTAL ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $52.35 | $28.15 | $80.50 | LABO0754-001 eff. 06/01/2022 |
| LABORER CATEGORY D: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) | $50.25 | $28.15 | $78.40 | LABO0754-001 eff. 06/01/2022 |
| LABORER CATEGORY C: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) | $50.25 | $28.15 | $78.40 | LABO0754-001 eff. 06/01/2022 |
| LABORER CATEGORY B: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) | $50.25 | $28.15 | $78.40 | LABO0754-001 eff. 06/01/2022 |
| LABORER CATEGORY A: (HEAVY & HIGHWAY CONSTRUCTION HAZARDOUS WASTE HANDLER) | $50.25 | $28.15 | $78.40 | LABO0754-001 eff. 06/01/2022 |
| GLAZIER | $49.20 | $57.20 | $106.40 | PAIN0009-010 eff. 05/01/2025 |
| PAINTERS: (SPRAY RATE) | $40.14 | $24.66 | $64.80 | PAIN0155-004 eff. 05/01/2021 |
| PAINTERS: (PAINTER/PAPERHANGER) | $39.14 | $24.66 | $63.80 | PAIN0155-004 eff. 05/01/2021 |
| PAINTERS: (LEAD ABATEMENT WORK) | $39.14 | $24.66 | $63.80 | PAIN0155-004 eff. 05/01/2021 |
| PAINTERS: (DRYWALL FINISHER) | $39.14 | $24.66 | $63.80 | PAIN0155-004 eff. 05/01/2021 |
| PAINTERS: (STRUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 | $111.39 | PAIN0806-001 eff. 10/01/2024 |
| PLUMBER (REFRIGERATION) | $41.99 | $37.38 | $79.37 | PLUM0373-001 eff. 05/01/2025 |
| PLUMBER (PLUMBERS AND STEAMFITTERS) | $53.20 | $46.57 | $99.77 | PLUM0373-001 eff. 05/01/2025 |
| SPRINKLER FITTER | $57.20 | $32.66 | $89.86 | SFNY0669-002 eff. 01/01/2026 |
| SHEET METAL WORKER | $55.29 | $47.43 | $102.72 | SHEE0038-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 5 DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKS.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $36.90 | $46.37 | $83.27 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 4 DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $37.02 | $46.37 | $83.39 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 3 DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FUEL TRUCKS, BATCH TRUCKS AND ALL OTHER TRACTOR TRAILERS.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $37.13 | $46.37 | $83.50 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 2 DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE TRUCKS.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $37.35 | $46.37 | $83.72 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 1A DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONS.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $39.03 | $46.37 | $85.40 | TEAM0445-001 eff. 05/01/2025 |
TRUCK DRIVERS: GROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKS.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $37.91 | $46.37 | $84.28 | TEAM0445-001 eff. 05/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.