New York prevailing wage rates: NY20260025
Building, Heavy, Highway construction in Putnam County.
NY20260025, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
- changed ELEVATOR MECHANIC base $76.12 → $76.12, fringe $38.99 → $38.98 (−$0.01) Same effective date as before (01/01/2026).
39 classifications added, 41 removed or reworded
- added BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (BUILDING CONSTRUCTION) $46.39 + $37.45 fringe
- removed Bricklayer, Cement Mason, Plasterer & Stonemason: BUILDING CONSTRUCTION: Bricklayers, Cement Masons, Plasterers, Stone Masons was $46.39 + $37.45 fringe
- removed Bricklayer, Cement Mason, Plasterer & Stonemason: HEAVY & HIGHWAY CONSTRUCTION: Bricklayers, Cement Masons, Plasterers, Stone Masons was $41.96 + $33.38 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Flagman was $35.34 + $30.12 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Groundman digging machine operator was $55.40 + $31.78 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Groundman Truck driver was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Groundman truck driver (tractor trailer unit) was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities: Mechanic was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Substation: Cable Splicer was $63.14 + $33.82 fringe
- removed ELECTRICIAN (Line Construction): Substation: Flagman was $35.34 + $30.12 fringe
- removed ELECTRICIAN (Line Construction): Substation: Groundman digging machine operator was $55.40 + $31.78 fringe
- removed ELECTRICIAN (Line Construction): Substation: Groundman truck driver (tractor trailer unit) was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Substation: Lineman & Technician was $61.56 + $36.21 fringe
- removed ELECTRICIAN (Line Construction): Substation: Mechanic was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Cable Splicer was $64.59 + $42.92 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Flagman was $35.34 + $30.12 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Groundman Digging Machine Operator was $55.40 + $31.78 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Groundman Truck Driver was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Lineman & Technician was $61.56 + $36.21 fringe
- removed ELECTRICIAN (Line Construction): Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation: Mechanic was $49.25 + $31.15 fringe
- removed ELECTRICIAN (Line Construction): Tree Trimmer was $31.45 + $11.42 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) $63.14 + $33.82 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $64.59 + $42.92 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $35.34 + $30.12 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) $35.34 + $30.12 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $35.34 + $30.12 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $55.40 + $31.78 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) $55.40 + $31.78 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab $55.40 + $31.78 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) $61.56 + $36.21 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins $61.56 + $36.21 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) $49.25 + $31.15 fringe
- added ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) $49.25 + $31.15 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 1-A was $59.04 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 1-B was $54.41 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 2-A was $56.97 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 3-A was $54.88 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 3-B was $52.25 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 4-A was $54.33 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 4-B was $45.94 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 5 was $49.53 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 5-A was $61.95 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 5-B was $47.00 + $31.32 fringe
- removed Power equipment operators: BUILDING CONSTRUCTION: GROUP 6 was $49.26 + $31.32 fringe
- removed Power equipment operators: GROUP 1 was $68.63 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (HEAVY & HIGHWAY) $68.63 + $35.25 fringe
- removed Power equipment operators: GROUP 1-A was $60.42 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER STRUCTURE SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC. (CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE; LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES; POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10 TON UP TO 25 TON) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 $59.04 + $31.32 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE $60.42 + $35.25 fringe
- removed Power equipment operators: GROUP 1-B was $63.70 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER $54.41 + $31.32 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 1-B ROAD PAVER, ASPHALT (HEAVY & HIGHWAY) $63.70 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS $56.97 + $31.32 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 3-A (BUILDING CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR) $54.88 + $31.32 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; STUD MACHINE; LADDER HOIST $52.25 + $31.32 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT -FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB SITE); ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE GRADING MACHINE; ROOF HOIST (TUGGER HOIST); TELEVISION CAMERAS-WATER- SEWER-GAS-ETC $54.33 + $31.32 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHER $45.94 + $31.32 fringe
- removed Power equipment operators: GROUP 5 was $64.02 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) MOTORIZED ROLLER (WALK BEHIND) $49.53 + $31.32 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5 OILER (HEAVY & HIGHWAY) $64.02 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5-A (BUILDING CONSTRUCTION) MASTER MECHANIC $61.95 + $31.32 fringe
- removed Power equipment operators: GROUP 5-A-1 was $64.02 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5-A-1 MASTER MECHANIC (HEAVY & HIGHWAY) $64.02 + $35.25 fringe
- removed Power equipment operators: GROUP 5-A-2 was $77.82 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (HEAVY & HIGHWAY) $77.82 + $35.25 fringe
- removed Power equipment operators: GROUP 5-A-3 was $75.13 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5-A-3 ENGINEER-- PILE DRIVER (HEAVY & HIGHWAY) $75.13 + $35.25 fringe
- removed Power equipment operators: GROUP 5-A-4 was $70.41 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY) $70.41 + $35.25 fringe
- removed Power equipment operators: GROUP 5-A-5 was $59.19 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY) $59.19 + $35.25 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5-B (BUILDING CONSTRUCTION) UTILITY MAN $47.00 + $31.32 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING CONSTRUCTION) WAREHOUSE MAN $49.26 + $31.32 fringe
- removed Truck drivers: GROUP 5 was $48.63 + $38.93 fringe
- added TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCION- GROUP 5 14 WHEELER $48.63 + $38.93 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| INSULATOR/ASBESTOS WORKER (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $46.62 | $49.30 | $95.92 | ASBE0091-001 eff. 06/02/2025 |
| HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) | $46.62 | $49.30 | $95.92 | ASBE0091-001 eff. 06/02/2025 |
BOILERMAKERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE | $68.88 | $49.83 | $118.71 | BOIL0005-001 eff. 01/01/2025 |
| POINTER, CLEANER AND CAULKER | $41.96 | $33.38 | $75.34 | BRNY0001-003 eff. 06/01/2018 |
| MARBLE MASON | $63.92 | $40.20 | $104.12 | BRNY0004-001 eff. 07/01/2024 |
| BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON: BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (BUILDING CONSTRUCTION) | $46.39 | $37.45 | $83.84 | BRNY0005-004 eff. 06/01/2023 |
| TERRAZZO WORKER/SETTER | $64.62 | $37.63 | $102.25 | BRNY0007-001 eff. 12/02/2024 |
| TERRAZZO FINISHER | $49.59 | $34.25 | $83.84 | BRNY0007-001 eff. 12/02/2024 |
| TILE FINISHER | $49.59 | $34.25 | $83.84 | BRNY0007-002 eff. 12/02/2024 |
| MARBLE FINISHER | $49.99 | $37.54 | $87.53 | BRNY0020-001 eff. 07/01/2024 |
| BRICKLAYER (MARBLE POLISHERS) | $52.32 | $36.25 | $88.57 | BRNY0024-001 eff. 06/03/2024 |
| TILE LAYER | $64.40 | $37.13 | $101.53 | BRNY0052-001 eff. 06/03/2024 |
| CARPENTERS: (HEAVY & HIGHWAY) | $50.12 | $31.73 | $81.85 | CARP0279-002 eff. 07/01/2025 |
| CARPENTERS (BUILDING) | $50.12 | $31.73 | $81.85 | CARP0279-002 eff. 07/01/2025 |
| MILLWRIGHT | $60.83 | $58.03 | $118.86 | CARP0740-001 eff. 07/01/2025 |
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 | CARP1556-006 eff. 07/01/2024 |
| DIVER TENDER | $55.00 | $55.84 | $110.84 | CARP1556-007 eff. 07/01/2024 |
| DIVER | $75.46 | $55.84 | $131.30 | CARP1556-007 eff. 07/01/2024 |
| CARPENTER (SOFT FLOOR LAYERS) | $44.69 | $38.17 | $82.86 | CARP2287-002 eff. 07/01/2025 |
ELECTRICIAN (PUTNAM COUNTY)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $51.50 | $42.22 | $93.72 | ELEC0363-003 eff. 04/01/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: MECHANIC.Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 | $74.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN.Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $54.19 | $35.69 | $89.88 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT).Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 | $74.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER).Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 | $74.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE OPERATOR).Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $48.77 | $31.31 | $80.08 | ELEC1249-002 eff. 05/05/2025 |
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN.Scope and notesPAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $32.51 | $29.93 | $62.44 | ELEC1249-002 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | $33.82 | $96.96 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIANScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $38.73 | $6.93 | $45.66 | ELEC1249-008 eff. 01/01/2025 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $20.53 | $6.39 | $26.92 | ELEC1249-008 eff. 01/01/2025 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.81 | $6.99 | $47.80 | ELEC1249-008 eff. 01/01/2025 |
ELEVATOR MECHANICScope and notesFOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $76.12 | $38.98 | $115.10 | ELEV0138-001 eff. 01/01/2026 |
POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING CONSTRUCTION) WAREHOUSE MANScope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $49.26 | $31.32 | $80.58 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5-B (BUILDING CONSTRUCTION) UTILITY MANScope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $47.00 | $31.32 | $78.32 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5-A (BUILDING CONSTRUCTION) MASTER MECHANICScope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $61.95 | $31.32 | $93.27 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) MOTORIZED ROLLER (WALK BEHIND)Scope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $49.53 | $31.32 | $80.85 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHERScope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $45.94 | $31.32 | $77.26 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT -FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB SITE); ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE GRADING MACHINE; ROOF HOIST (TUGGER HOIST); TELEVISION CAMERAS-WATER- SEWER-GAS-ETCScope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $54.33 | $31.32 | $85.65 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; STUD MACHINE; LADDER HOISTScope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $52.25 | $31.32 | $83.57 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 3-A (BUILDING CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR)Scope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $54.88 | $31.32 | $86.20 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERSScope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $56.97 | $31.32 | $88.29 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS; ROLLER 4 TONS AND OVERScope and notesNOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $54.41 | $31.32 | $85.73 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER STRUCTURE SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC. (CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE; LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES; POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10 TON UP TO 25 TON) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00Scope and notesFOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $59.04 | $31.32 | $90.36 | ENGI0137-003 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $59.19 | $35.25 | $94.44 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $70.41 | $35.25 | $105.66 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-3 ENGINEER-- PILE DRIVER (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $75.13 | $35.25 | $110.38 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $77.82 | $35.25 | $113.07 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5-A-1 MASTER MECHANIC (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $64.02 | $35.25 | $99.27 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 5 OILER (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $64.02 | $35.25 | $99.27 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $44.19 | $35.25 | $79.44 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $51.57 | $35.25 | $86.82 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; WINCH TRUCK "A" FRAME. JOHN HENRY DRILL OR SIMILAR. (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATEScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $56.81 | $35.25 | $92.06 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $59.67 | $35.25 | $94.92 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC. (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $57.84 | $35.25 | $93.09 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 1-B ROAD PAVER, ASPHALT (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $63.70 | $35.25 | $98.95 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATEScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $60.42 | $35.25 | $95.67 | ENGI0137-006 eff. 03/04/2024 |
POWER EQUIPMENT OPERATORS: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (HEAVY & HIGHWAY)Scope and notesNOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $68.63 | $35.25 | $103.88 | ENGI0137-006 eff. 03/04/2024 |
IRONWORKER A)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY | $42.63 | $53.70 | $96.33 | IRON0417-001 eff. 07/01/2025 |
LABORERS: HEAVY: GROUP 7 ASBESTOS AND TOXIC WASTE LABORERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.64 | $28.98 | $80.62 | LABO0060-001 eff. 03/30/2025 |
LABORERS: HEAVY: GROUP 6 FLAGPERSONScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.96 | $28.98 | $71.94 | LABO0060-001 eff. 03/30/2025 |
LABORERS: HEAVY: GROUP 5 COMMON LABORERS, SIGNAL PERSON AND PIT PERSON , TRUCK SPOTTERS, POWDER PERSON, LANDSCAPE AND NURSERY PERSON, DUMP PERSON.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $49.56 | $28.98 | $78.54 | LABO0060-001 eff. 03/30/2025 |
LABORERS: HEAVY: GROUP 4 GENERAL CONCRETE LABORERS-ANYTHING PERTAINING TO CONCRETE, AGGREGATE OR CONCRETE MATERIAL HANDLING, PUDDLERS, ASPHALT WORKER, ROCK SCALERS, VIBRATOR OPERATOR, BIT GRINDER, CONCRETE GRINDER, AIR TAMPERS AND ALL TAMPERS NOT COVERED BY ANY OTHER CLASSIFICATION, FORM PIN PULLER, PUMPS AND THEIR OPERATION, SERVICE OF AIR POWER, EPOXY AND WATERPROOFING WORKER, FINE GRADE PERSON BETWEEN FORMS, BARCO RAMMER, GUARD AND GUIDE RAIL AND LINK FENCE, STEEL KINGS.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $49.93 | $28.98 | $78.91 | LABO0060-001 eff. 03/30/2025 |
LABORERS: HEAVY: GROUP 3 ASPHALT CURB MACHINE OPERATOR, JEEPER OPERATOR, PAVEMENT BREAKER OPERATOR, POWER SAW OPERATOR, JACK HAMMER DRILLER. ALL TYPES OF PHEUMATIC TOOLS GASOLINE DRILLER, CONCRETE SAW, GUNNITING, RAILROAD SPIKE PULLER AND SANDBLASTING, PIPE LAYER, DECK WINCHES ON SCOWS, POWER BUGGY OPERATOR, POWER WHEELBARROW OPERATOR.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.29 | $28.98 | $79.27 | LABO0060-001 eff. 03/30/2025 |
LABORERS: HEAVY: GROUP 2 BURNER, JUMBO DRILLER, JOY DRILLER, WAGON DRILLER, AIR TRACK DRILLER, HYDRAULIC DRILLER, CONCRETE FORM ALIGNER, CONCRETE FORM AND CURB FORM (STEEL), ASPHALT SCREEDMAN, ASPHALT RAKER.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.71 | $28.98 | $79.69 | LABO0060-001 eff. 03/30/2025 |
LABORERS: HEAVY: GROUP 1 BLASTERS.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.11 | $28.98 | $81.09 | LABO0060-001 eff. 03/30/2025 |
| LABORER (BUILDING) | $44.05 | $32.40 | $76.45 | LABO0235-001 eff. 05/01/2025 |
LABORERS: HIGHWAY: GROUP 3 ASPHALT RAKER, ASPHALT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS, LEAD MAN, TUNNEL & CAISSONScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.90 | $27.80 | $71.70 | LABO0235-004 eff. 05/01/2023 |
LABORERS: HIGHWAY: GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACK HAMMER, POWDERMAN, HIGHSCALERS POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.80 | $27.80 | $70.60 | LABO0235-004 eff. 05/01/2023 |
LABORERS: HIGHWAY: GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERSScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $36.45 | $27.80 | $64.25 | LABO0235-004 eff. 05/01/2023 |
| PAINTER (SPRAY, SCAFFOLD, SANDBLASTING) | $47.75 | $44.11 | $91.86 | PAIN0009-003 eff. 05/01/2025 |
| PAINTER (PAINTERS, PAPERHANGER, DRYWALL FINISHERS & LEAD ABATEMENT WORKER) | $44.75 | $44.11 | $88.86 | PAIN0009-003 eff. 05/01/2025 |
| PAINTER (GLAZIERS) | $49.20 | $57.20 | $106.40 | PAIN0009-003 eff. 05/01/2025 |
| PLUMBER AND STEAMFITTER (ZONE 1) | $65.07 | $45.35 | $110.42 | PLUM0021-001 eff. 05/01/2025 |
| ROOFER | $50.25 | $32.62 | $82.87 | ROOF0008-002 eff. 05/01/2025 |
| SPRINKLER FITTER | $57.20 | $32.66 | $89.86 | SFNY0669-002 eff. 01/01/2026 |
| SHEET METAL WORKER | $55.29 | $47.43 | $102.72 | SHEE0038-001 eff. 07/01/2025 |
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCION- GROUP 5 14 WHEELERScope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $48.63 | $38.93 | $87.56 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 11 OFF ROAD EQUIPMENT (UNDER 40 TONS) DJBScope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $50.26 | $38.93 | $89.19 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 10 OFF ROAD EQUIPMENT (OVER 40 TONS) EUCLID, DJBScope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $50.51 | $38.93 | $89.44 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 9 OFF ROAD EQUIPMENT (UNDER 40 TONS): EUCLIDScope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $49.88 | $38.93 | $88.81 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 8 RXSScope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $50.38 | $38.93 | $89.31 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 7 DARTSScope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $50.01 | $38.93 | $88.94 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 6 ATHEY WAGON, BELLY DUMPS, ARTICULATED DUMPS, TRAILER WAGONSScope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $49.26 | $38.93 | $88.19 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 4 TRACTOR TRAILERS (ALL TYPES)Scope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $49.13 | $38.93 | $88.06 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 3 FUEL AND TIRE TRUCKSScope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $48.96 | $38.93 | $87.89 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 2 STRAIGHT JOBS: 6-WHEELER, 10-WHEELER, A-FRAME TRUCKS (INSIDE CAB), WINCH TRUCK (INSIDE CAB), DYNAMITE TRUCK, SEEDING TRUCK, MULCHING TRUCK, AGITATOR TRUCK, WATER TRUCK, CEMENT TRUCKS (ALL TYPES), SUBURBANS, STATION WAGONS, CARS, PICKUPSScope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $48.51 | $38.93 | $87.44 | TEAM0456-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 1 LOWBOY (CARRYING EQUIPMENT)Scope and notesHAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS WORKED FOR VACATION BENEFITS. LEGAL SERVICES FUND: EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE FORM OF HOLIDAY PAY OR VACATION PAY. IN ADDITION TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, INCLUSIVE OF THE DAY OF THE FUNERAL | $51.26 | $38.93 | $90.19 | TEAM0456-001 eff. 07/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.