New York prevailing wage rates: NY20260029

Heavy, Highway construction in Genesee County.

NY20260029, modification 3, published 07/30/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 2

No base or fringe rates changed. The modification may have changed notes or other text.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

NY20260029 wage rates
ClassificationBaseFringeTotalRate ID
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (TOWNSHIPS OF ALABAMA, ALEXANDER DARIEN, OAKFIELD AND PEMBROKE)$34.15$26.09$60.24ASBE0004-002
eff. 05/01/2021
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COVERING AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOOPING MATERIAL OPENINGS AND PENETRATIONS IN WALLS, FLOORS CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT (TOWNSHIPS OF ALABAMA, ALEXANDER DARIEN, OAKFIELD AND PEMBROKE)$37.65$30.69$68.34ASBE0004-002
eff. 05/01/2025
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COVERING AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOOPING MATERIAL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT (TOWNSHIPS OF BATAVIA, BERGEN, BETHANY, BYRON, ELBA, LEROY, PAVILLION, AND STAFFORD INCLUDING THE CITY OF BATAVIA)$40.26$25.41$65.67ASBE0026-002
eff. 06/01/2025
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION; WETTING; STRIPPING; REMOVAL; SCRAPPING, VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THETY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (TOWNSHIPS OF BATAVIA, BERGEN, BETHANY, BYRON, ELBA, LEROY, PAVILLION, AND STAFFORD INCLUDING THE CITY OF BATAVIA)$40.26$25.41$65.67ASBE0026-002
eff. 06/01/2025
CEMENT MASON/CONCRETE FINISHER: CEMENT MASONS (ROCHESTER CHAPTER)$38.63$25.05$63.68BRNY0003-007
eff. 07/01/2025
MILLWRIGHT$31.93$25.11$57.04CARP0276-017
eff. 07/01/2019
CARPENTER$34.26$25.94$60.20CARP0276-017
eff. 07/01/2024
CABLE SPLICER (ALABAMA, ALEXANDER, DARIEN, ELBA, OAKFIELD, PEMBROKE AND THAT PORTION OF BATAVIA AND ELBA WHICH ARE WEST OF LITTLE TONAWANDA CREEK, TONAWANDA CREEK, THE CITY OF BATAVIA (STATE AND HIGHWAY 98 NORTH OF THE CITY OF BATAVIA:)$36.73$23.39$60.12ELEC0041-009
eff. 04/01/2014
ELECTRICIAN (ALABAMA, ALEXANDER, DARIEN, ELBA, OAKFIELD, PEMBROKE AND THAT PORTION OF BATAVIA AND ELBA WHICH ARE WEST OF LITTLE TONAWANDA CREEK, TONAWANDA CREEK, THE CITY OF BATAVIA (STATE AND HIGHWAY 98 NORTH OF THE CITY OF BATAVIA:)$44.50$36.06$80.56ELEC0041-009
eff. 05/26/2025
COMMUNICATIONS SYSTEM (TOWNSHIPS OF ALABAMA, ALEXANDER, DARIEN, ELBA, OAKFIELD, PEMBROKE AND THAT PROTION OF BATAVIA AND ELBA WHICH ARE WEST OF LITTLE TONAWANDA CREEK, TONAWANDA CREEK, THE CITY OF BATAVIA (STATE AND HIGHWAY 98 NORTH OF THE CITY OF BATAVIA)) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK.
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY

$14.20$14.02$28.22ELEC0041-010
eff. 05/26/2025
COMMUNICATIONS SYSTEM, INSTALLER (TOWNSHIPS OF ALABAMA, ALEXANDER, DARIEN, ELBA, OAKFIELD, PEMBROKE AND THAT PROTION OF BATAVIA AND ELBA WHICH ARE WEST OF LITTLE TONAWANDA CREEK, TONAWANDA CREEK, THE CITY OF BATAVIA (STATE AND HIGHWAY 98 NORTH OF THE CITY OF BATAVIA)) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK.
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY

$22.90$21.38$44.28ELEC0041-010
eff. 05/26/2025
COMMUNICATIONS SYSTEM, MASTER TECHNICIAN (TOWNSHIPS OF ALABAMA, ALEXANDER, DARIEN, ELBA, OAKFIELD, PEMBROKE AND THAT PROTION OF BATAVIA AND ELBA WHICH ARE WEST OF LITTLE TONAWANDA CREEK, TONAWANDA CREEK, THE CITY OF BATAVIA (STATE AND HIGHWAY 98 NORTH OF THE CITY OF BATAVIA)) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK.
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY

$44.50$36.05$80.55ELEC0041-010
eff. 05/26/2025
COMMUNICATIONS SYSTEM, SOUND WIREMAN (TOWNSHIPS OF ALABAMA, ALEXANDER, DARIEN, ELBA, OAKFIELD, PEMBROKE AND THAT PROTION OF BATAVIA AND ELBA WHICH ARE WEST OF LITTLE TONAWANDA CREEK, TONAWANDA CREEK, THE CITY OF BATAVIA (STATE AND HIGHWAY 98 NORTH OF THE CITY OF BATAVIA)) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK.
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY

$44.50$36.05$80.55ELEC0041-010
eff. 05/26/2025
ELECTRICIAN (REMAINDER OF COUNTY)$44.30$30.20$74.50ELEC0086-005
eff. 05/26/2025
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$31.72$29.87$61.59ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$47.57$31.03$78.60ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$52.86$35.60$88.46ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC
Scope and notes

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95ELEC1249-003
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$61.56$36.21$97.77ELEC1249-004
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.14$33.82$96.96ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)$64.59$42.92$107.51ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$35.34$30.12$65.46ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.34$30.12$65.46ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)$35.34$30.12$65.46ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$55.40$31.78$87.18ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.40$31.78$87.18ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab$55.40$31.78$87.18ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.56$36.21$97.77ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins$61.56$36.21$97.77ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)$49.25$31.15$80.40ELEC1249-004
eff. 05/05/2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY$40.81$6.99$47.80ELEC1249-008
eff. 01/01/2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY$20.53$6.39$26.92ELEC1249-008
eff. 01/01/2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY$38.73$6.93$45.66ELEC1249-008
eff. 01/01/2025
ELEVATOR MECHANIC
Scope and notes

FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

$62.39$38.44$100.83ELEV0014-001
eff. 01/01/2025
POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER, AUTOMATIC FINE GRADE MACHINE (CMI AND SIMILAR TYPE), ARCHER HOIST, BACKHOE AND PULL HOE (TRACTOR MOUNTED AND RUBBER MOUNTED), BACK FILLING MACHINE, BELT PLACE (CMI AND SIMILAR), BENDING MACHINE (PIPE), BITUMINOUS SPREADER AND MIXER, BLACK TOP PLANT (AUTOMATED), BLACK TOP PLANT (NON-AUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACK MOUNTED), BLOWER FOR BURNING BRUSH, BOILER (WHEN USED FOR POWER), BOOM TRUCKS, BORING MACHINE, BULLDOZER, CABLEWAY CAGE HOIST, CAISSON AUGER, CENTRAL MIX PLANT (AND ALL CONCRETE BATCHING PLANTS), CHERRY PICKER (OVER 5 TONS), CHERRY PICKER (UNDER 5 TONS), CHIPPING MACHINE AND CHIP SPREADER, CONCRETE CURB AND GUTTER MACHINES, CONCRETE CURING MACHINE, CONCRETE MIXER (OVER 1/2 CU. YD.) CONCRETE PAVEMENT SPREADERS AND FINISHERS, CONCRETE PAVER, CONCRETE PUMP, CONCRETE SAW (SELF-PROPELLED), CONVEYOR, CORE DRILL, CRANE, CRUSHER, DERRICK OPERATOR, DRAGLINE, DREDGE, DRILL RIG (TRACTOR MOUNTED), DUAL DRUM PAVER, ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEMS, ELEVATING GRADER SELF- PROPELLED OR TOWED), ELEVATOR EXCAVATOR (ALL PURPOSE, HYDRAULCALLY OPERATED) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, FORKLIFT, FRONT END LOADER, GENERATOR (10 OUTLETS OR MORE), GRADALL, GRADER, GROUT OR GUNITE MACHINE, HEAD TOWER, HOIST-ONE DRUM, HOISTING ENGINE, HYDRAULIC BOOM, HYDRAULIC HAMMER, (SELF PROPELLED), HYDRAULIC PIPE JACK MACHINE (OR SIMILAR TYPE MACHINE), HYDRAULIC SYSTEM PUMPS, HYDRO CRANE, HYDRO HAMMER (OR SIMILAR TYPE), INDUSTRIAL TRACTOR, JERSEY SPREADER, KOLMAN PLANT LOADER (AND SIMILAR TYPE LOADERS), LOCOMOTIVE, LUBRICATION TRUCK, MAINTENANCE ENGINEER, MAINTENANCE LUBRICATION UNIT OR TRUCK, MINE HOIST, MIXR FOR STABILIZED BASE (SELF-PROPELLED), MONORAIL, MOTORIZED HYDRAULIC PIN PULLER, MOTORIZED HYDRAULIC SEEDER MUCKING MACHINE, MULCHING MACHINE, MULTIPLE DRUM HOIST (MORE THAN 1 DRUM IN USE), OVERHEAD CRANE, PEINE CRANE (OR SIMILAR TYPE), PILE DRIVER, PLANT ENGINEER, PNEUMATIC MIXER, POST HOLE DIGGER, POWER BOOM, PUMP CRETE, PUSH OR SNATCH CAT, QUARRY MASTER OR EQUIVALENT ROAD WIDENER, ROCK BIT SHARPENER (ALL TYPES), ROLLER (ALL), ROLLING MACHIN (PIPE), ROTOMILL, SCOOPMOBILE, SHOVEL, SIDE BOOM, SKIMMER, SLIP FORM PAVER (CMI AND SIMILAR TYPE, FIRST AND SECOND OPERATOR), SNORKEL, STRATO-TOWER, STUMP CHIPPING MACHINE, TIRE TRUCK AND REPAIR, TOWED ROLLER, TRACTOR DRAWN BELT TYPE GRADER/LOADER, TRACTOR SHOVEL, TRACTOR WITH TOWED ACCESSORIES, TRACTORS (WHEN USING WINCH POWER), TRACTORS, TRENCHER, TRUCK CRANE, TUNNEL SHOVEL, TUBE FINISHER (CMI AND SIMILAR TYPE), VIBRATORY COMPACTOR, VIBRO TAMP, WELL DRILLING MACHINE, WELL POINT, WINCH, WINCH TRUCK WITH "A" FRAME. (WESTERN PART OF GENESEE COUNTY) NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$47.39$36.89$84.28ENGI0017-005
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 OR LESS), COMPRESSORS: (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS, DUST COLLECTORS, GENERATORS, MECHANICAL HEATERS, PUMPS, WELDING MACHINES (FOUR OF ANY TYPE OR COMBINATION), CONCRETE MIXER (1/2 CU. YD. AND UNDER), FIREMAN, FORM TAMPER, FUEL TRUCK, HEATING BOILER (USED FOR TEMPORARY HEAT), JEEP TRENCHER, POWER HEATERMAN, POWER PLANT IN EXCESS OF 10 K.W., PUMP (4" OR OVER), REVINIUS WIDENER, STEM CLEANER, STUMP CHIPPING MACHINE, WELDING MACHINE (1 MACHINE OVER 300 AMPS OR 2 OR 3 MACHINES REGARDLESS OF AMPS). (WESTERN PART OF GENESEE COUNTY) NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$42.89$36.89$79.78ENGI0017-005
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES 5 - 60 TONS (WESTERN PART OF GENESEE COUNTY)
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTE: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$50.64$36.89$87.53ENGI0017-005
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 4 CRANES 61 - 199 TONS (WESTERN PART OF GENESEE COUNTY)
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTE: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$51.64$36.89$88.53ENGI0017-005
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES 200 - 399 TONS (WESTERN PART OF GENESEE COUNTY)
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTE: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$52.14$36.89$89.03ENGI0017-005
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 400 TONS & OVER (WESTERN PART OF GENESEE COUNTY)
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTE: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$52.64$36.89$89.53ENGI0017-005
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 7 MASTER MEACHANIC (WESTERN PART OF GENESEE COUNTY)
Scope and notes

NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTE: A. PAID HOLIDAYS: A-NEW YEAR'S DAY; B-MEMORIAL DAY; C-INDEPENDENCE DAY; D-LABOR DAY; THANKSGIVING DAY; F-CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$48.46$36.89$85.35ENGI0017-005
eff. 07/01/2025
POWER EQUIPMENT OPERATORS: GROUP 1 AIR TUGGER, ALL TERRAIN TELESCOPING MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND SIMILAR MACHINES OVER THREE EIGHTHS CU.YD. CAPACITY (FACT. RATING);CARRIER MOUNTED BACKHOES THAT SWING 360 DEGREES BIG GENERATOR PLANT HOIST (ON STEEL ERECTION) BRIDGE CRANE (ALL TYPES), CABLEWAY, CAISSON AUGER AND SIMILAR TYPE MACHINE, CRANE, DERRICK, DREDGE, EXCAVATOR ALL PURPOSE HYDRAULICALLY OPERATED, FORKLIFT (WITH FACTORY RATING OF FIFTEEN FT. OR MORE OF LIFT),HOIST (ON STEEL ERECTION), HYDRAULIC/KRUPP DRILL TYPE MUCKING MACHINES, REMOTE CONTROLLED EXCAVATOR WITH ATTACHMENTS (BROKK TYPE OR SIMILAR), ROSS CARRIER (AND SIMILAR TYPE), THREE-DRUM HOIST(WHEN ALL THREE DRUMS ARE IN USE) (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A.
Scope and notes

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$36.66$32.74$69.40ENGI0158-013
eff. 07/01/2022
POWER EQUIPMENT OPERATORS: GROUP 2 A-FRAME TRUCK, BACKFILLING MACHINE, BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR TYPE MACHINES, BELT CRETE AND SIMILAR TYPE MACHINES, BITUMINOUS SPREADING MACHINE 3/8 YD. CAPACITY OR LESS(FACTORY RATING), BULLDOZER, CARRY-ALL TYPE SCRAPER, COMPRESSORS: FOUR (4) NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR THREE (3) OR LESS WITH MORE THAN1200 CFM BUT NOT TO EXCEED 2000 CFM, CONCRETE MIXER, CONCRETE PLACER, CONCRETE PUMP, DINKY LOCOMOTIVES (ALL TYPES), ELEVATING GRADER, ELEVATOR FINE GRADE AND FINISH, ROLLERS, FINE GRADE MACHINES(ALL KINDS), FORKLIFT WITH FACTORY RATING OF LESS THAN FIFTEEN(15) FEET OF LIFT, FRONT END LOADER, GUNITE PUMPING MACHINE, HIGH PRESSURE BOILER, HOIST (1 OR 2 DRUMS), MAINTENANCE ENGINEER (MECHANIC), MECHANICAL SLURRY MACHINE (ALL KINDS), MEGA MIXERS AND SIMILAR TYPE MACHINES, MOTOR GRADER, POST HOLE DIGGER, PUMPS (REGARDLESS OF MOTIVE POWER) NO MORE THAN FOUR (4) IN NUMBER NOT TO EXCEED TWENTY (20) INCHES IN TOTAL CAPACITY, SHOT CRETE PUMPING MACHINE, SIDE BOOM TRACTOR, SKID STEER LOADER WITH ATTACHMENTS, STONE CRUSHER TOURNADOZER AND SIMILAR TYPES TOURNAPULL AND SIMILAR TYPES, TRENCHING MACHINES, WELL DRILL, WELLPOINT SYSTEM EXCEPTION: SINGLE ELECTRIC PUMPS UP TO AND INCLUDING FOUR (4) INCHES NEED NOT BE MANNED. (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A.
Scope and notes

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$35.86$32.74$68.60ENGI0158-013
eff. 07/01/2022
POWER EQUIPMENT OPERATORS: GROUP 3 ANY COMBINATION (NOT TO EXCEED THREE (3) PIECES OF EQUIPMENT) COMPRESSORS �THREE (3) OR LESS, OR NOT TO EXCEED 1200 CFM COMBINED CAPACITY, FIREMAN, LONGITUDINAL FLOAT, MECHANICAL HEATER PUMPS (REGARDLESS OF MOTIVE POWER) NO MORE THAN THREE (3) IN NUMBER, NOT TO EXCEED TWELVE (12) INCHES TOTAL CAPACITY, ROLLER (FILL AND GRADE)RUBBER TIRED TRACTOR WELDING MACHINE OR MECHANICAL CONVEYOR (OVER 12FT. IN LENGTH) EXCEPTION: SINGLE GASOLINE DRIVEN WELDING MACHINE UP TO 300AMPS NEED NOT BE MANNED. (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A.
Scope and notes

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$33.16$32.74$65.90ENGI0158-013
eff. 07/01/2022
POWER EQUIPMENT OPERATORS: GROUP 4 OILERS (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A.
Scope and notes

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$28.60$32.74$61.34ENGI0158-013
eff. 07/01/2022
POWER EQUIPMENT OPERATORS: GROUP 5 CRANES UP TO AND INCLUDING 25 TONS (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A.
Scope and notes

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$41.16$32.74$73.90ENGI0158-013
eff. 07/01/2022
POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 25-250 TONS (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A.
Scope and notes

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$43.66$32.74$76.40ENGI0158-013
eff. 07/01/2022
POWER EQUIPMENT OPERATORS: GROUP 7 CRANES 251 AND OVER TONS (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A.
Scope and notes

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$44.66$32.74$77.40ENGI0158-013
eff. 07/01/2022
POWER EQUIPMENT OPERATORS: GROUP 8 TOWER CRANES (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A.
Scope and notes

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$43.66$32.74$76.40ENGI0158-013
eff. 07/01/2022
OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT (AUTOMATED); CHERRY PICKER- OVER 5 TON CAPACITY; CRANE; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DUAL DRUM PAVER; FRONT END LOADER (4 CU. YD. AND OVER); HOIST,(TOW OR 3 DRUM); PILE DRIVER; POWER GRADER WITH ELEVATION LOADER ATTACHMENT; QUARRY MASTER (OR EQUIVALENT); SHOVEL; SLIP FORM PAVER; TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE TUNNEL SHOVEL; EXCAVATOR, ALL PURPOSE HYDRAULICALLY OPERATED
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY

$55.38$34.85$90.23ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$55.38$35.75$91.13ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$58.43$35.00$93.43ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY PICKER, 5 TONS AND UNDER; COMPRESSOR (4 OR LESS) EXCEEDING 2000 CFM COMBINED CAPACITY; CONCRETE PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS (TRACTOR MOUNTED); FRONT END LOADER (UNDER 4 CU. YDS); HI- PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE DRUM); KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; MAINTENANCE ENGINEER; MAINTENANCE GREASE MAN; MECHANICAL SLURRY MACHINE; MIXER FOR STABILIZED BASE SELF PROPELLED; MONORAIL MACHINE; PLANT ENGINEER; POWER BROOM; POWER GRADER; PUMP CRETE; READY MIX CONCRETE PLANT; ROAD WIDENER; ROLLER (ALL ABOVE SUB-GRADE); SIDE BOOM; TRACTOR SCRAPER; TRACTOR WITH DOZER AND OR PUSHER; TRENCHER; WINCH
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY

$40.79$34.85$75.64ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$54.68$35.75$90.43ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED); BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY PICKER (5 TONS CAPACITY AND UNDER); COMPRESSORS (4 OR LESS EXCEEDING 2000 CFM COMBINED CAPACITY); CONCRETE PAVER (OVER 16S); CONCRETE PUMP; CRANE (TOPSIDE); CRUSHER; DIESEL POWER UNIT; DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER (UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE; HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER (TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE; PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE; SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER; TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER; WINCH; WINCH CAT
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$57.21$35.00$92.21ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (4 OF ANY TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEMS; FARM TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK LIFT; GUNITE MACHINE; HAMMERS-HYDRAULIC-SELF PROPELLED; LOCOMOTIVE; POST HOLE DIGGER AND POST DRIVER; PUMPS (REGARDLESS OF MOTIVE POWER, NOT MORE THAN 4 IN NUMBER NOT TO EXCEED 20" IN TOTAL CAPACITY); SUBMERSIBLE ELECTRIC PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY

$40.10$34.85$74.95ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$51.81$35.75$87.56ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): "A" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS; DUST COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; LIGHT PLANTS (4 OF ANY TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEM; FARM TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK LIFT (UNDER 15 FT); GROUND PUMP OVER 5 CU. FT (MANUFACTURERS RATING); GUNITE MACHINE; HAMMERS (HYDRAULIC SELF PROPELLED); HYDRA-SPIKER (RIDE ON); HYDRA BLASTER (WATER); HYDRA BLASTER; MOTORIZED FORM CARRIER; POST HOLE DIGGER AND POST DRIVER; POWER SWEEPER; ROLLER (GRADE AND FILL); SCARIFER (RIDE ON); SPAN SAW (RIDE ON); SUBMERSIBLE ELECTRIC PUMP (WHEN USED IN LIEU OF WELL POINTS); TAMPER (RIDE ON); TIE EXTRACTOR (RIDE ON); TIE HANDLER (RIDE ON); TIE INSERTER (RIDER ON); TIE SPACER (RIDE ON); TRACK LINER (RIDE ON); TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT AGGREGATE PLANT; BOILER (USED IN CONJUNCTION WITH PRODUCTION); CEMENT AND BIN OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200 CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; LIGHT PLANTS (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE PAVER OR MIXER (16S AND UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN; FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN USED FOR PRODUCTION); REVINIUS WIDENER; SHELL WINDER; STEAM CLEANER; TRACTOR
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$54.42$35.00$89.42ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE MIXER (16S AND UNDER), CONCRETE SAW-SELF PROPELLED; FIREMAN; FORM TAMPER; MULCHING MACHINE; POWER HEATERMAN; PUMPS REGARDLESS OF MOTIVE POWER NO MORE THAN 3 IN NUMBER NOT TO EXCEED 12" IN TOTAL CAPACITY; REVINIUS WIDENER; STEAM CLEANER; TRACTOR
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY

$36.61$34.85$71.46ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 4 (HEAVY AND HIGHWAY)TOWER CRANES
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$61.38$35.75$97.13ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT): CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$51.41$35.00$86.41ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY) GROUP 5: CRANES 50 TONS AND OVER
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$59.88$35.75$95.63ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY) CRANES 49 TONS AND
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$58.38$35.75$94.13ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC
Scope and notes

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$56.81$35.75$92.56ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND PAVING). FOR EXCAVATION AND PAVING:
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND PAVING CLASSIFICATIONS

$43.26$34.85$78.11ENGI0158-034
eff. 07/01/2025
OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND SHAFT). FOR EXCAVATION AND PAVING:
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND PAVING CLASSIFICATIONS

$60.84$35.00$95.84ENGI0158-034
eff. 07/01/2025
IRONWORKERS: FENCE ERECTOR (TOWNSHIPS OF ALABAMA, ALEXANDER, DARIEN, AND PEMBROKE)$34.06$30.80$64.86IRON0006-005
eff. 07/01/2024
IRONWORKERS: STRUCTURAL, ORNAMENTAL, REINFORCING, WELDERS, RIGGERS AND RODMEN (TOWNSHIPS OF ALABAMA, ALEXANDER, DARIEN, AND PEMBROKE)$35.49$32.30$67.79IRON0006-005
eff. 07/01/2024
IRONWORKERS: WINDOW ERECTOR (TOWNSHIPS OF ALABAMA, ALEXANDER, DARIEN, AND PEMBROKE)$33.14$32.30$65.44IRON0006-005
eff. 07/01/2024
IRONWORKERS: IRONWORKER (REMAINDER OF COUNTY)$36.25$33.12$69.37IRON0009-001
eff. 07/01/2025
IRONWORKERS: SHEETER (REMAINDER OF COUNTY)$36.25$33.12$69.37IRON0009-001
eff. 07/01/2025
IRONWORKERS: ORNAMENTAL, REINFORCING STONE DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY MOVERS FENCE ERECTORS, PRECAST CONCRETE ERECTOR (GENESSEE COUNTY (TWPS OF BATAVIA, BERGEN, BETHANY, BYRON, ELBA, LEROY, OAKFIELD, PAVILLION, AND STAFFORD))$35.75$30.80$66.55IRON0033-004
eff. 07/01/2025
IRONWORKERS: SHEETER (GENESSEE COUNTY (TWPS OF BATAVIA, BERGEN, BETHANY, BYRON, ELBA, LEROY, OAKFIELD, PAVILLION, AND STAFFORD))$36.00$30.80$66.80IRON0033-004
eff. 07/01/2025
LABORER GROUP 1 FLAGGERS
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$32.96$25.30$58.26LABO0435-008
eff. 07/01/2024
LABORER GROUP 2 LABORERS
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$33.66$25.30$58.96LABO0435-008
eff. 07/01/2024
LABORER GROUP 3 RAKERS, DRILLERS, PIPELAYERS, AND TORCH OPERATORS
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$33.86$25.30$59.16LABO0435-008
eff. 07/01/2024
LABORER GROUP 4 BLASTERS
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$34.69$25.30$59.99LABO0435-008
eff. 07/01/2024
LABORER GROUP 5 HAZARDOUS WASTE REMOVAL
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$35.44$25.30$60.74LABO0435-008
eff. 07/01/2024
PAINTER (DRYWALL/TAPING)$34.00$28.51$62.51PAIN0004-003
eff. 05/01/2025
PAINTER (WALLCOVERING)$33.00$28.21$61.21PAIN0004-003
eff. 05/01/2025
PAINTER: BRUSH & ROLLER$33.00$28.21$61.21PAIN0004-003
eff. 05/01/2025
GLAZIER$34.68$27.64$62.32PAIN0004-013
eff. 05/01/2025
PLUMBER AND STEAMFITTER (BERGEN, BETHANY, BYRON, LEROY, PAVILLION AND STAFFORD TOWNSHIPS)$42.68$27.88$70.56PLUM0013-002
eff. 05/06/2025
PLUMBERS AND PIPEFITTERS (GENESEE-TOWNSHIPS OF ALABAMA, OAKFIELD, ELBA, PEMBROKE, BATAVIA, DARIEN, ALEXANDER)$42.20$29.80$72.00PLUM0022-002
eff. 04/29/2024
STEAMFITTER (GENESEE-TOWNSHIPS OF ALABAMA, OAKFIELD, ELBA, PEMBROKE, BATAVIA, DARIEN, ALEXANDER)$42.20$29.80$72.00PLUM0022-002
eff. 04/29/2024
ROOFERS: COMPOSITION$34.96$26.03$60.99ROOF0074-002
eff. 06/01/2024
ROOFERS: SLATE & TILE$35.11$26.03$61.14ROOF0074-002
eff. 06/01/2024
SPRINKLER FITTER$47.85$28.94$76.79SFNY0669-001
eff. 01/01/2026
SHEET METAL WORKER$39.50$29.18$68.68SHEE0071-002
eff. 05/27/2024
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN. ((GENESEE COUNTY: TOWNSHIPS OF OAKFIELD, ELBA, BATAVIA, BYRON, ALEXANDER, BATHANY, PAVILLION, LEROY, STAFFORD, AND BERGEN)) HAZARDOUS WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY

$31.39$27.77$59.16TEAM0118-002
eff. 07/01/2025
TRUCK DRIVERS: GROUP 2 TANDEMS; BATCH TRUCK; MECHANICS. ((GENESEE COUNTY: TOWNSHIPS OF OAKFIELD, ELBA, BATAVIA, BYRON, ALEXANDER, BATHANY, PAVILLION, LEROY, STAFFORD, AND BERGEN)) HAZARDOUS WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY

$31.44$27.77$59.21TEAM0118-002
eff. 07/01/2025
TRUCK DRIVERS: GROUP 3 SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK. ((GENESEE COUNTY: TOWNSHIPS OF OAKFIELD, ELBA, BATAVIA, BYRON, ALEXANDER, BATHANY, PAVILLION, LEROY, STAFFORD, AND BERGEN)) HAZARDOUS WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY

$31.49$27.77$59.26TEAM0118-002
eff. 07/01/2025
TRUCK DRIVERS: GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE UNIT. ((GENESEE COUNTY: TOWNSHIPS OF OAKFIELD, ELBA, BATAVIA, BYRON, ALEXANDER, BATHANY, PAVILLION, LEROY, STAFFORD, AND BERGEN)) HAZARDOUS WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY

$31.64$27.77$59.41TEAM0118-002
eff. 07/01/2025
TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT SHERE NOT SELF-LOADED. ((GENESEE COUNTY: TOWNSHIPS OF OAKFIELD, ELBA, BATAVIA, BYRON, ALEXANDER, BATHANY, PAVILLION, LEROY, STAFFORD, AND BERGEN)) HAZARDOUS WASTE SITE WORK RECEIVES AN ADDITIONAL $1.50 PER HOUR
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY

$31.79$27.77$59.56TEAM0118-002
eff. 07/01/2025
TRUCK DRIVERS: ((GENESEE COUNTY: TOWNSHIPS OF ALABAMA, PEMBROKE, AND DARIEN) (ORLEANS COUNTY: TOWNSHIPS OF YATES, RIDGEWAY, AND SHELBY) (WYOMING COUNTY: TOWNSHIPS OF BENNINGTON, SHELDON, JAVA, AND ARCADE))$49.23$8.75$57.98TEAM0449-001
eff. 07/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 3 published 07/30/2026. We format and check the official text; the determination in your contract is what applies.