Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL SYSTEMS.) | $41.74 | $27.58 | $69.32 | ASBE0040-001 eff. 05/01/2025 |
| HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) | $41.74 | $27.58 | $69.32 | ASBE0040-001 eff. 05/01/2025 |
| BOILERMAKER | $43.34 | $27.66 | $71.00 | BOIL0197-001 eff. 01/01/2025 |
BRICKLAYER, CAULKER, CLEANER, POINTER, STONEMASON & CEMENT MASON (ALBANY CHAPTER)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AFTER THE HOLIDAY | $33.82 | $19.95 | $53.77 | BRNY0002-001 eff. 07/01/2016 |
MARBLE, TILE & TERRAZZO FINISHER (ALBANY CHAPTER)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. HEAVY AND HIGHWAY CONSTRUCTION | $25.59 | $16.34 | $41.93 | BRNY0002-001 eff. 07/01/2016 |
MARBLE, TILE LAYER & TERRAZZO WORKER (ALBANY CHAPTER)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. HEAVY AND HIGHWAY CONSTRUCTION | $32.59 | $19.05 | $51.64 | BRNY0002-001 eff. 07/01/2016 |
CEMENT MASON/CONCRETE FINISHER, HEAVY & HIGHWAY (ALBANY CHAPTER)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AFTER THE HOLIDAY | $37.23 | $19.51 | $56.74 | BRNY0002-001 eff. 07/01/2018 |
| CARPENTER (HEAVY AND HIGHWAY CONSTRUCTION) | $41.03 | $24.50 | $65.53 | CARP0291-004 eff. 07/01/2024 |
| ELECTRICIAN | $48.00 | $32.09 | $80.09 | ELEC0236-003 eff. 06/01/2024 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMANScope and notesFOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | $31.72 | $29.87 | $61.59 | ELEC1249-003 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)Scope and notesFOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | $42.29 | $30.66 | $72.95 | ELEC1249-003 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)Scope and notesFOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | $47.57 | $31.03 | $78.60 | ELEC1249-003 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIANScope and notesFOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | $52.86 | $35.60 | $88.46 | ELEC1249-003 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANICScope and notesFOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | $42.29 | $30.66 | $72.95 | ELEC1249-003 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIANScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | $33.82 | $96.96 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | $107.51 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | $65.46 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | $87.18 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | $97.77 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | $80.40 | ELEC1249-004 eff. 05/05/2025 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.81 | $6.99 | $47.80 | ELEC1249-008 eff. 01/01/2025 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $20.53 | $6.39 | $26.92 | ELEC1249-008 eff. 01/01/2025 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $38.73 | $6.93 | $45.66 | ELEC1249-008 eff. 01/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER), MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER, DRILL-HYDRAULIC ROCK DRILL. HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $54.93 | $33.20 | $88.13 | ENGI0158-003 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $53.91 | $33.20 | $87.11 | ENGI0158-003 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (BUILDING): GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $51.01 | $33.20 | $84.21 | ENGI0158-003 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) BUILDING HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY | $55.42 | $33.20 | $88.62 | ENGI0158-003 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVELScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $57.30 | $33.55 | $90.85 | ENGI0158-031 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CATScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $56.39 | $33.55 | $89.94 | ENGI0158-031 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANESScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $63.30 | $33.55 | $96.85 | ENGI0158-031 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVERScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $61.80 | $33.55 | $95.35 | ENGI0158-031 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOWScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $60.30 | $33.55 | $93.85 | ENGI0158-031 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANICScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $58.91 | $33.55 | $92.46 | ENGI0158-031 eff. 07/01/2025 |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | $33.55 | $87.37 | ENGI0158-031 eff. 07/01/2025 |
| IRONWORKERS: SHEETER (BENSON, HOPE, WELLS TOWNSHIPS) | $38.75 | $25.48 | $64.23 | IRON0012-009 eff. 07/01/2024 |
| IRONWORKERS: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN (BENSON, HOPE, WELLS TOWNSHIPS) | $38.50 | $25.48 | $63.98 | IRON0012-009 eff. 07/01/2024 |
| IRONWORKERS:: SHEETER, BUCKER-UP (BENSON, HOPE, WELLS TOWNSHIPS) | $38.75 | $25.48 | $64.23 | IRON0012-009 eff. 07/01/2024 |
| IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (REMANINDER OF COUNTY) | $35.50 | $31.39 | $66.89 | IRON0440-001 eff. 07/01/2025 |
LABORER BUILDING CONSTRUCTION (HAZARDOUS WASTE REMOVAL INCLUDES, WETTING,STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHEATHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $24.00 | $20.64 | $44.64 | LABO0035-007 eff. 07/01/2017 |
LABORER BUILDING CONSTRUCTION: ASBESTOS REMOVALScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $24.00 | $20.64 | $44.64 | LABO0035-007 eff. 07/01/2017 |
LABORER BUILDING CONSTRUCTION: BLASTERS, FORM SETTERS, MOTOR BUGGY OPERATOR (RIDER TYPE)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AFTER THE HOLIDAY.) | $23.00 | $20.64 | $43.64 | LABO0035-007 eff. 07/01/2017 |
LABORER BUILDING CONSTRUCTION: LABORERSScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $22.50 | $20.64 | $43.14 | LABO0035-007 eff. 07/01/2017 |
LABORER BUILDING CONSTRUCTION: PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER LIFT (WALK BEHIND)Scope and notesFOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AFTER THE HOLIDAY | $22.65 | $20.64 | $43.29 | LABO0035-007 eff. 07/01/2017 |
LABORER BUILDING CONSTRUCTION: WAGON DRILL OPERATORScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. HEAVY AND HIGHWAY CONSTRUCTION | $22.90 | $20.64 | $43.54 | LABO0035-007 eff. 07/01/2017 |
LABORER GROUP 1: (HEAVY & HIGHWAY CONSTRUCTION:) COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATSScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $28.05 | $23.74 | $51.79 | LABO0035-007 eff. 07/01/2017 |
LABORER GROUP 2: (HEAVY & HIGHWAY CONSTRUCTION:) BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS'S TOOLS, INSTALLATION OF BRIDGE DRAINAGE; PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2" AND SINGLE DIAPHRAM), NOZZLE (APHLAT, GUNNITE, SEEDING AND SAND BLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AND AIR TOOL OPERATORS, WRECKING LABORERSScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $28.25 | $23.74 | $51.99 | LABO0035-007 eff. 07/01/2017 |
LABORER GROUP 3 (HEAVY & HIGHWAY CONSTRUCTION:) ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AMD SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWERMANScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $28.45 | $23.74 | $52.19 | LABO0035-007 eff. 07/01/2017 |
LABORER GROUP 4: (HEAVY & HIGHWAY CONSTRUCTION:) BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERSScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $28.65 | $23.74 | $52.39 | LABO0035-007 eff. 07/01/2017 |
LABORER GROUP 5: (HEAVY & HIGHWAY CONSTRUCTION:) HAZARDOUS WASTE REMOVALScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $24.00 | $20.64 | $44.64 | LABO0035-007 eff. 07/01/2017 |
| GLAZIER | $37.25 | $33.54 | $70.79 | PAIN0009-015 eff. 05/01/2025 |
| PAINTERS: LEAD ABATEMENT WORKERS, STRUCTURAL STEEL (ZONE #2) | $34.50 | $21.69 | $56.19 | PAIN0201-005 eff. 05/01/2025 |
| PAINTERS: PAINTERS, DRYWALL FINISHERS, SPRAY (ZONE #2) | $33.50 | $21.69 | $55.19 | PAIN0201-005 eff. 05/01/2025 |
| PAINTERS: (STRUCTURAL STEEL AND BRIDGE) | $48.75 | $35.63 | $84.38 | PAIN0806-006 eff. 10/01/2014 |
| PLUMBER AND STEAMFITTER (TOWNS OF ARIETTA, BENSON, HOPE, INDIAN LAKE, LAKE PLEASANT, MOREHOUSE AND WELLS) | $55.26 | $29.12 | $84.38 | PLUM0007-002 eff. 05/01/2025 |
| PLUMBER: NORTHERN ZONE (INLET TOWNSHIP) | $45.93 | $33.77 | $79.70 | PLUM0112-002 eff. 05/01/2025 |
| PLUMBER AND STEAMFITTER | $45.88 | $33.60 | $79.48 | PLUM0773-004 eff. 05/01/2025 |
| ROOFER | $38.05 | $24.27 | $62.32 | ROOF0241-001 eff. 07/01/2025 |
| SPRINKLER FITTER | $47.85 | $28.94 | $76.79 | SFNY0669-001 eff. 01/01/2026 |
SHEET METAL WORKER A.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THESE HOLIDAYS FALL ON A SATURDAY OR SUNDAY, EITHER THE PRECEDING FRIDAY OR FOLLOWING MONDAY WILL BE OBSERVED AS THE HOLIDAY | $33.73 | $33.04 | $66.77 | SHEE0083-002 eff. 06/01/2019 |
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, TANDEMS; BATCH TRUCK; MECHANICS; SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC, FUEL TRUCKScope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY | $35.48 | $31.58 | $67.06 | TEAM0317-001 eff. 06/01/2025 |
TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT- EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRAFFLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE UNIT, OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE HITCHED EQUIPMENT SHERE NOT SELF LOADED.Scope and notesFOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY | $35.83 | $31.58 | $67.41 | TEAM0317-001 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.