PrevailCrew

New York prevailing wage rates: NY20260115

Building construction in Seneca County.

NY20260115, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No existing rate changed amount.

0 classifications added, 1 removed or reworded
  • removed BRICKLAYER was $31.61 + $24.98 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

NY20260115 wage rates
ClassificationBaseFringeTotalRate ID
TILE SETTER$38.34$20.51$58.85BRNY0002-023
eff. 07/01/2024
CEMENT MASON/CONCRETE FINISHER$32.53$22.10$54.63BRNY0003-018
eff. 07/01/2021
SOFT FLOOR LAYER$25.61$17.40$43.01CARP0251-016
eff. 07/01/2016
CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION)$32.64$21.97$54.61CARP0277-030
eff. 07/01/2025
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING)$45.00$31.12$76.12ELEC0840-007
eff. 06/01/2025
IRONWORKER: ORNAMENTAL$35.49$32.30$67.79IRON0006-006
eff. 07/01/2024
IRONWORKER, STRUCTURAL$35.49$32.30$67.79IRON0006-006
eff. 07/01/2024
IRONWORKER, REINFORCING$35.49$32.30$67.79IRON0006-006
eff. 07/01/2024
PAINTER (SPRAY)$28.35$25.21$53.56PAIN0038-004
eff. 05/01/2024
PAINTER: BRUSH AND ROLLER$27.25$25.24$52.49PAIN0043-002
eff. 05/01/2020
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION)$42.20$29.80$72.00PLUM0022-009
eff. 04/29/2024
PLUMBER$42.20$29.80$72.00PLUM0022-016
eff. 04/29/2024
ROOFER$36.70$18.00$54.70ROOF0210-008
eff. 05/01/2025
PAINTER: DRYWALL FINISHING/TAPING$24.81$21.13$45.94SUNY2017-017
eff. 07/01/2020
OPERATOR: FORKLIFT$32.70$24.12$56.82SUNY2017-017
eff. 07/01/2020
OPERATOR: CRANE$36.52$26.91$63.43SUNY2017-017
eff. 07/01/2020
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$41.10$19.26$60.36SUNY2017-017
eff. 07/01/2020
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$43.97$24.17$68.14SUNY2017-017
eff. 07/01/2020
MILLWRIGHT$27.08$19.72$46.80SUNY2017-017
eff. 07/01/2020
LABORER: MASON TENDER - CEMENT/CONCRETE$23.84$14.18$38.02SUNY2017-017
eff. 07/01/2020
LABORER: COMMON OR GENERAL$24.35$16.27$40.62SUNY2017-017
eff. 07/01/2020
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$31.50$21.11$52.61SUNY2017-017
eff. 07/01/2020
INSTALLER: METAL STUDS$26.70$17.40$44.10SUNY2017-017
eff. 07/01/2020
GLAZIER$25.03$19.70$44.73SUNY2017-017
eff. 07/01/2020
CARPENTER (FORM WORK ONLY)$25.84$17.56$43.40SUNY2017-017
eff. 07/01/2020
CARPENTER (DRYWALL HANGING ONLY)$26.99$17.40$44.39SUNY2017-017
eff. 07/01/2020
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$26.00$18.35$44.35SUNY2017-017
eff. 07/01/2020

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.