North Carolina prevailing wage rates: NC20260088
Highway construction in Alamance, Anson, Cabarrus, Chatham, Davie, Durham, Forsyth, Gaston, Guilford, Mecklenburg, Orange, Person, Randolph, Rockingham, Stokes, Union, Yadkin Counties.
NC20260088, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| TRUCK DRIVER (GVWR OF 26,001 LBS OR GREATER) | $13.57 EO 13658 minimum $13.65 may apply | $0.03 | $13.60 | SUNC2014-003 eff. 11/14/2014 |
| TRUCK DRIVER (GVWR OF 26,000 OR LESS) | $11.45 EO 13658 minimum $13.65 may apply | $0.00 | $11.45 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR: MILLING MACHINE | $15.22 | $0.00 | $15.22 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $17.51 | $0.00 | $17.51 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (TACK TRUCK/DISTRIBUTOR OPERATOR) | $14.82 | $0.00 | $14.82 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (SLIP FORM MACHINE) | $19.60 | $0.00 | $19.60 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (SCRAPER ROUGH) | $11.50 EO 13658 minimum $13.65 may apply | $0.00 | $11.50 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (SCRAPER FINISH) | $12.65 EO 13658 minimum $13.65 may apply | $0.00 | $12.65 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (ROLLER OTHER) | $12.08 EO 13658 minimum $13.65 may apply | $0.00 | $12.08 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (ROLLER ASPHALT FINISH) | $13.76 | $0.00 | $13.76 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (ROLLER ASPHALT BREAKDOWN) | $12.79 EO 13658 minimum $13.65 may apply | $0.00 | $12.79 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (PAVER CONCRETE) | $18.20 | $0.00 | $18.20 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (PAVER ASPHPALT) | $15.97 | $0.00 | $15.97 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (PAVEMENT MARKING EQUIPMENT) | $12.05 EO 13658 minimum $13.65 may apply | $0.00 | $12.05 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (OILER/GREASER) | $14.16 | $0.00 | $14.16 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (OFF-ROAD HAULER/WATER TANKER) | $11.83 EO 13658 minimum $13.65 may apply | $0.00 | $11.83 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (MATERIAL TRANSFER VEHICLE (SHUTTLE BUGGY)) | $15.44 | $0.00 | $15.44 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (LOADER GREATER THAN 2 CUBIC YARDS) | $16.19 | $0.00 | $16.19 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (LOADER 2 CUBIC YARDS OR LESS) | $13.31 EO 13658 minimum $13.65 may apply | $0.00 | $13.31 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (GRADER/BLADE ROUGH) | $15.47 | $0.00 | $15.47 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (GRADER/BLADE FINE) | $19.84 | $0.00 | $19.84 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (EXCAVATOR ROUGH) | $13.63 EO 13658 minimum $13.65 may apply | $0.00 | $13.63 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (EXCAVATOR FINE) | $16.95 | $0.00 | $16.95 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (DRILL OPERATOR STRUCTURE) | $20.89 | $0.00 | $20.89 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (DRILL OPERATOR ROCK) | $14.28 | $0.00 | $14.28 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (CRANE ROUGH/ALL-TERRAIN) | $19.10 | $0.00 | $19.10 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (CRANE OTHER) | $19.83 | $0.00 | $19.83 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (CRANE BOOM TRUCKS) | $18.19 | $0.00 | $18.19 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (CONCRETE GRINDER/GROOVER) | $17.92 | $0.00 | $17.92 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (BULLDOZER ROUGH) | $14.36 | $0.00 | $14.36 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (BULLDOZER FINE) | $16.13 | $0.00 | $16.13 | SUNC2014-003 eff. 11/14/2014 |
| POWER EQUIPMENT OPERATOR (ASPHALT BROOM TRACTOR) | $10.00 EO 13658 minimum $13.65 may apply | $0.00 | $10.00 | SUNC2014-003 eff. 11/14/2014 |
| PAINTER (BRIDGE) | $23.77 | $0.00 | $23.77 | SUNC2014-003 eff. 11/14/2014 |
| LABORER: PIPELAYER | $12.43 EO 13658 minimum $13.65 may apply | $0.00 | $12.43 | SUNC2014-003 eff. 11/14/2014 |
| LABORER: COMMON OR GENERAL | $10.40 EO 13658 minimum $13.65 may apply | $0.01 | $10.41 | SUNC2014-003 eff. 11/14/2014 |
| LABORER (TRAFFIC SIGNAL/LIGHTING INSTALLER) | $15.65 | $0.24 | $15.89 | SUNC2014-003 eff. 11/14/2014 |
| LABORER (GUARDRAIL/FENCE INSTALLER) | $13.22 EO 13658 minimum $13.65 may apply | $0.00 | $13.22 | SUNC2014-003 eff. 11/14/2014 |
| LABORER (CEMENT MASON/CONCRETE FINISHER TENDER) | $11.04 EO 13658 minimum $13.65 may apply | $0.00 | $11.04 | SUNC2014-003 eff. 11/14/2014 |
| LABORER (CARPENTER TENDER) | $12.51 EO 13658 minimum $13.65 may apply | $0.27 | $12.78 | SUNC2014-003 eff. 11/14/2014 |
| LABORER (ASPHALT SCREED/JACKMAN) | $14.50 | $0.00 | $14.50 | SUNC2014-003 eff. 11/14/2014 |
| LABORER (ASPHALT RAKER AND SPREADER) | $12.78 EO 13658 minimum $13.65 may apply | $0.00 | $12.78 | SUNC2014-003 eff. 11/14/2014 |
| IRONWORKER | $13.30 EO 13658 minimum $13.65 may apply | $0.00 | $13.30 | SUNC2014-003 eff. 11/14/2014 |
| ELECTRICIAN (TELECOMMUNICATIONS TECHNICIAN) | $15.19 | $1.25 | $16.44 | SUNC2014-003 eff. 11/14/2014 |
| ELECTRICIAN (ELECTRICIAN) | $18.79 | $2.72 | $21.51 | SUNC2014-003 eff. 11/14/2014 |
| CEMENT MASON/CONCRETE FINISHER | $13.93 | $0.00 | $13.93 | SUNC2014-003 eff. 11/14/2014 |
| CARPENTER | $13.68 | $0.05 | $13.73 | SUNC2014-003 eff. 11/14/2014 |
| BLASTER | $18.64 | $0.00 | $18.64 | SUNC2014-003 eff. 11/14/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.