Ohio prevailing wage rates: OH20260058

Building construction in Tuscarawas County.

OH20260058, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No existing rate changed amount.

0 classifications added, 2 removed or reworded
  • removed IRONWORKER, REINFORCING was $29.10 + $19.73 fringe
  • removed ROOFER was $29.59 + $15.17 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

OH20260058 wage rates
ClassificationBaseFringeTotalRate ID
ASBESTOS WORKER/HEAT & FROST INSULATOR$46.50$29.43$75.93ASBE0002-003
eff. 08/01/2024
BRICKLAYER$35.59$22.71$58.30BROH0006-001
eff. 05/01/2024
TILE SETTER$32.41$16.36$48.77BROH0046-004
eff. 09/01/2023
TILE FINISHER$27.87$16.31$44.18BROH0046-004
eff. 09/01/2023
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$25.15$17.44$42.59ELEC0540-001
eff. 08/28/2023
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$40.00$33.32$73.32ELEC0972-006
eff. 06/01/2024
POWER EQUIPMENT OPERATOR: FORKLIFT$42.98$16.41$59.39ENGI0018-025
eff. 05/01/2024
POWER EQUIPMENT OPERATOR (BOBCAT/SKID STEER/SKID LOADER; BULLDOZER)$44.02$16.41$60.43ENGI0018-025
eff. 05/01/2024
POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; CRANE)$44.14$16.41$60.55ENGI0018-025
eff. 05/01/2024
IRONWORKER: ORNAMENTAL AND STRUCTURAL$36.00$23.57$59.57IRON0550-008
eff. 05/01/2025
LABORER (MASON TENDER - CEMENT/CONCRETE)$40.97$14.10$55.07LABO0083-004
eff. 06/01/2024
LABORER: MASON TENDER - BRICK$32.16$12.95$45.11LABO0134-002
eff. 05/01/2024
LABORER: COMMON OR GENERAL$31.23$12.95$44.18LABO0134-003
eff. 05/01/2024
PAINTER: BRUSH AND ROLLER$30.28$24.46$54.74PAIN0093-003
eff. 12/01/2024
CEMENT MASON/CONCRETE FINISHER$35.12$17.40$52.52PLAS0132-011
eff. 06/01/2025
PLUMBER (EXCLUDES HVAC PIPE INSTALLATION)$34.73$37.60$72.33PLUM0495-007
eff. 06/01/2025
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION)$34.73$37.60$72.33PLUM0495-007
eff. 06/01/2025
SPRINKLER FITTER (FIRE SPRINKLERS)$48.28$28.08$76.36SFOH0669-009
eff. 04/01/2025
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$33.53$26.36$59.89SHEE0024-024
eff. 06/01/2022
SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION)$35.52$29.87$65.39SHEE0033-015
eff. 07/01/2024
TRUCK DRIVER: DUMP (ALL TYPES)$19.33$6.55$25.88SUOH2012-060
eff. 08/29/2014
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$23.91$10.42$34.33SUOH2012-060
eff. 08/29/2014
OPERATOR: LOADER$22.69$8.01$30.70SUOH2012-060
eff. 08/29/2014
LABORER: PIPELAYER$18.37$4.79$23.16SUOH2012-060
eff. 08/29/2014
CARPENTER$25.75$12.99$38.74SUOH2012-060
eff. 08/29/2014

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.