Ohio prevailing wage rates: OH20260071
Building construction in Butler County.
OH20260071, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
- changed ROOFER base $33.00 → $34.38 (+$1.38), fringe $19.42 → $19.94 (+$0.52) New rates effective 08/01/2025 (previously 08/01/2024).
0 classifications added, 2 removed or reworded
- removed OPERATOR: Backhoe/Excavator/Trackhoe was $36.89 + $14.79 fringe
- removed OPERATOR: Oiler was $27.56 + $16.37 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 | ASBE0008-010 eff. 03/01/2025 |
| TILE SETTER | $32.41 | $16.36 | $48.77 | BROH0018-005 eff. 09/01/2023 |
| TILE FINISHER | $27.87 | $16.31 | $44.18 | BROH0018-009 eff. 09/01/2023 |
| CARPENTER (ACCOUSTICAL CEILING INSTALLATION ONLY) | $32.26 | $19.10 | $51.36 | CARP0002-008 eff. 06/01/2024 |
| CARPENTER (INCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION; EXCLUDES FORM WORK) | $32.26 | $19.10 | $51.36 | CARP0002-015 eff. 06/01/2024 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $38.00 | $24.16 | $62.16 | ELEC0648-002 eff. 09/01/2025 |
ELEVATOR MECHANICScope and notesPAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 | ELEV0011-002 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $44.14 | $16.41 | $60.55 | ENGI0018-037 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: BULLDOZER; CRANE | $44.14 | $16.41 | $60.55 | ENGI0018-038 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 | ENGI0066-045 eff. 06/01/2017 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 | ENGI0066-045 eff. 06/01/2017 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 | ENGI0066-045 eff. 06/01/2017 |
| IRONWORKER, REINFORCING | $38.27 | $23.90 | $62.17 | IRON0044-003 eff. 06/01/2025 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $37.77 | $23.90 | $61.67 | IRON0044-019 eff. 06/01/2025 |
| LABORER: MASON TENDER - BRICK | $32.82 | $14.45 | $47.27 | LABO0534-002 eff. 06/01/2024 |
| LABORER: COMMON OR GENERAL; FORM WORK | $32.49 | $14.45 | $46.94 | LABO0534-002 eff. 06/01/2024 |
| PAINTER: BRUSH AND ROLLER | $28.29 | $13.75 | $42.04 | PAIN0123-001 eff. 05/01/2024 |
| GLAZIER | $31.95 | $18.20 | $50.15 | PAIN0387-002 eff. 11/01/2023 |
| PLASTERER | $31.35 | $17.65 | $49.00 | PLAS0132-019 eff. 07/01/2025 |
| PLUMBER (INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION) | $43.30 | $27.40 | $70.70 | PLUM0392-004 eff. 06/01/2025 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES HVAC UNIT INSTALLATION) | $43.30 | $27.40 | $70.70 | PLUM0392-004 eff. 06/01/2025 |
| ROOFER | $34.38 | $19.94 | $54.32 | ROOF0042-007 eff. 08/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 | SFOH0669-009 eff. 04/01/2025 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.23 | $25.79 | $57.02 | SHEE0024-025 eff. 06/01/2023 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) | $34.32 | $23.77 | $58.09 | SHEE0024-030 eff. 06/01/2023 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 | SUOH2012-073 eff. 08/29/2014 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 | SUOH2012-073 eff. 08/29/2014 |
| OPERATOR: ROLLER | $29.85 | $12.00 | $41.85 | SUOH2012-073 eff. 08/29/2014 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 | SUOH2012-073 eff. 08/29/2014 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 | SUOH2012-073 eff. 08/29/2014 |
| LABORER: PIPELAYER | $23.18 | $8.95 | $32.13 | SUOH2012-073 eff. 08/29/2014 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.87 | $9.80 | $33.67 | SUOH2012-073 eff. 08/29/2014 |
| LABORER: LANDSCAPE & IRRIGATION | $23.60 | $0.87 | $24.47 | SUOH2012-073 eff. 08/29/2014 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $26.19 | $8.99 | $35.18 | SUOH2012-073 eff. 08/29/2014 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $22.62 | $8.76 | $31.38 | SUOH2012-073 eff. 08/29/2014 |
| CEMENT MASON/CONCRETE FINISHER | $32.38 | $2.58 | $34.96 | SUOH2012-073 eff. 08/29/2014 |
| BRICKLAYER | $24.73 | $4.71 | $29.44 | SUOH2012-073 eff. 08/29/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.