Ohio prevailing wage rates: OH20260106
Building construction in Carroll, Stark Counties.
OH20260106, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 2 removed or reworded
- removed LABORER: Mason Tender - Cement/Concrete was $29.55 + $10.90 fringe
- removed OPERATOR: Oiler was $27.56 + $16.37 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 | ASBE0002-003 eff. 08/01/2024 |
| BRICKLAYER | $35.59 | $22.71 | $58.30 | BROH0006-003 eff. 05/01/2024 |
| TILE SETTER | $33.46 | $21.37 | $54.83 | BROH0006-008 eff. 05/01/2023 |
| TILE FINISHER | $25.37 | $17.42 | $42.79 | BROH0008-007 eff. 06/01/2024 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $33.09 | $23.06 | $56.15 | CARP0285-007 eff. 05/01/2024 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $25.15 | $17.44 | $42.59 | ELEC0540-001 eff. 08/28/2023 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $39.86 | $29.19 | $69.05 | ELEC0540-008 eff. 06/30/2025 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 | ENGI0018-035 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 | ENGI0066-045 eff. 06/01/2017 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 | ENGI0066-045 eff. 06/01/2017 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 | ENGI0066-045 eff. 06/01/2017 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $36.00 | $23.57 | $59.57 | IRON0550-010 eff. 05/01/2025 |
| LABORER: MASON TENDER - BRICK | $34.62 | $12.95 | $47.57 | LABO1015-006 eff. 05/01/2024 |
| LABORER: COMMON OR GENERAL | $32.62 | $12.95 | $45.57 | LABO1015-006 eff. 05/01/2024 |
| PAINTER: BRUSH AND ROLLER | $31.93 | $18.15 | $50.08 | PAIN0841-003 eff. 07/01/2025 |
| GLAZIER | $32.87 | $15.17 | $48.04 | PAIN1162-003 eff. 07/01/2025 |
| PLUMBER (INCLUDES HVAC UNIT INSTALLATION) | $47.48 | $27.14 | $74.62 | PLUM0094-007 eff. 05/01/2025 |
| PIPEFITTER (EXCLUDES HVAC UNIT INSTALLATION) | $40.92 | $37.20 | $78.12 | PLUM0168-005 eff. 06/01/2025 |
| ROOFER | $32.10 | $21.45 | $53.55 | ROOF0088-003 eff. 06/01/2024 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.66 | $32.23 | $69.89 | SHEE0033-027 eff. 06/01/2025 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $22.78 | $12.61 | $35.39 | SUOH2012-108 eff. 08/29/2014 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $34.16 | $0.00 | $34.16 | SUOH2012-108 eff. 08/29/2014 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 | SUOH2012-108 eff. 08/29/2014 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 | SUOH2012-108 eff. 08/29/2014 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 | SUOH2012-108 eff. 08/29/2014 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 | SUOH2012-108 eff. 08/29/2014 |
| OPERATOR: CRANE | $29.51 | $11.77 | $41.28 | SUOH2012-108 eff. 08/29/2014 |
| OPERATOR: BULLDOZER | $22.55 | $8.03 | $30.58 | SUOH2012-108 eff. 08/29/2014 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 | SUOH2012-108 eff. 08/29/2014 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 | SUOH2012-108 eff. 08/29/2014 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 | SUOH2012-108 eff. 08/29/2014 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $24.30 | $10.71 | $35.01 | SUOH2012-108 eff. 08/29/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.