Oklahoma prevailing wage rates: OK20260015
Highway construction in Oklahoma County.
OK20260015, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| TRUCK DRIVER (WATER TRUCK) | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUOK2011-002 eff. 04/18/2011 |
| TRUCK DRIVER (TANDEM AXLE/SEMI TRAILER) | $14.64 | $0.00 | $14.64 | SUOK2011-002 eff. 04/18/2011 |
| TRUCK DRIVER (PICKUP TRUCK) | $12.48 EO 13658 minimum $13.65 may apply | $0.00 | $12.48 | SUOK2011-002 eff. 04/18/2011 |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | $14.39 | $0.00 | $14.39 | SUOK2011-002 eff. 04/18/2011 |
| TRUCK DRIVER (LOWBOY/FLOAT) | $13.90 | $0.00 | $13.90 | SUOK2011-002 eff. 04/18/2011 |
| TRUCK DRIVER (FLATBED TRUCK) | $14.69 | $0.00 | $14.69 | SUOK2011-002 eff. 04/18/2011 |
| TRUCK DRIVER (DUMP TRUCK) | $13.08 EO 13658 minimum $13.65 may apply | $0.00 | $13.08 | SUOK2011-002 eff. 04/18/2011 |
| TRAFFIC SIGNAL INSTALLER | $17.37 | $0.00 | $17.37 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $13.66 | $0.00 | $13.66 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | $16.50 | $0.00 | $16.50 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | $12.56 EO 13658 minimum $13.65 may apply | $0.00 | $12.56 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (SCRAPER) | $13.55 EO 13658 minimum $13.65 may apply | $0.00 | $13.55 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | $12.36 EO 13658 minimum $13.65 may apply | $0.00 | $12.36 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT)) | $13.02 EO 13658 minimum $13.65 may apply | $0.00 | $13.02 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (OILER) | $14.06 | $0.00 | $14.06 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (MIXER) | $14.43 | $0.00 | $14.43 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $14.62 | $0.00 | $14.62 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (MECHANIC) | $15.61 | $0.00 | $15.61 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (LOADER (FRONT END)) | $12.95 EO 13658 minimum $13.65 may apply | $0.00 | $12.95 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE) | $16.36 | $0.00 | $16.36 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | $15.85 | $0.00 | $15.85 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | $13.81 | $0.00 | $13.81 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (CRANE) | $17.03 | $0.00 | $17.03 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (CONCRETE SAW) | $11.69 EO 13658 minimum $13.65 may apply | $0.00 | $11.69 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE) | $13.61 EO 13658 minimum $13.65 may apply | $0.00 | $13.61 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (BULLDOZER) | $15.09 | $0.00 | $15.09 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (BROOM) | $11.97 EO 13658 minimum $13.65 may apply | $0.00 | $11.97 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) | $12.79 EO 13658 minimum $13.65 may apply | $0.00 | $12.79 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/TRACKHOE) | $13.78 | $0.00 | $13.78 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | $14.34 | $0.00 | $14.34 | SUOK2011-002 eff. 04/18/2011 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | $12.44 EO 13658 minimum $13.65 may apply | $0.00 | $12.44 | SUOK2011-002 eff. 04/18/2011 |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS)) | $11.69 EO 13658 minimum $13.65 may apply | $0.00 | $11.69 | SUOK2011-002 eff. 04/18/2011 |
| LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS)) | $12.89 EO 13658 minimum $13.65 may apply | $0.00 | $12.89 | SUOK2011-002 eff. 04/18/2011 |
| LABORER (PIPELAYER) | $12.84 EO 13658 minimum $13.65 may apply | $0.00 | $12.84 | SUOK2011-002 eff. 04/18/2011 |
| LABORER (LANDSCAPE) | $9.63 EO 13658 minimum $13.65 may apply | $0.00 | $9.63 | SUOK2011-002 eff. 04/18/2011 |
| LABORER (COMMON OR GENERAL) | $10.64 EO 13658 minimum $13.65 may apply | $0.00 | $10.64 | SUOK2011-002 eff. 04/18/2011 |
| LABORER (ASPHALT RAKER AND SHOVELER) | $11.31 EO 13658 minimum $13.65 may apply | $0.00 | $11.31 | SUOK2011-002 eff. 04/18/2011 |
| IRONWORKER: REINFORCING | $13.00 EO 13658 minimum $13.65 may apply | $0.00 | $13.00 | SUOK2011-002 eff. 04/18/2011 |
| IRONWORKER, STRUCTURAL | $14.21 | $0.00 | $14.21 | SUOK2011-002 eff. 04/18/2011 |
| CEMENT MASON/CONCRETE FINISHER | $12.50 EO 13658 minimum $13.65 may apply | $0.00 | $12.50 | SUOK2011-002 eff. 04/18/2011 |
| CARPENTER (INCLUDES FORM WORK) | $12.78 EO 13658 minimum $13.65 may apply | $0.00 | $12.78 | SUOK2011-002 eff. 04/18/2011 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.