Oklahoma prevailing wage rates: OK20260049
Building construction in Oklahoma County.
OK20260049, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 | BROK0005-004 eff. 06/01/2023 |
| MILLWRIGHT | $29.15 | $11.81 | $40.96 | CARP0216-002 eff. 01/01/2022 |
| CARPENTER (FORM WORK ONLY) | $27.79 | $10.05 | $37.84 | CARP0329-003 eff. 01/01/2024 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | $41.40 | $13.14 | $54.54 | ELEC1141-010 eff. 05/26/2025 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $24.26 | $9.76 | $34.02 | ELEC1141-030 eff. 05/26/2025 |
ELEVATOR MECHANICScope and notesPAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $51.11 | $38.44 | $89.55 | ELEV0063-004 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH LESS THAN 50 TON CAPACITY AND CRANES (AS RATED BY MFG.) LESS THAN 3CU. YD., INCLUDING ALL OVERHEAD CRANS TYPES, GOLDHOFER/MODULAR POWERED TRAILER, MOBILE GANTRY SYSTEM, HEAVY DUTY MECHANIC, WELDER OVERHEAD MONORAIL TYPES CRANE, PANEL BOARD BATCH, PLANT OPERATOR, PILEDRIVER ENGINEER, DRAGLINE, CLAMSHELL SIDEBOOM OR SIMILAR TYPE EQUIPMENT, GRADALL, CHERRY PICKER, HOSIT (WHILE OPERATING 2 OR MORE DUMS); ALL HOIST (WHILE DOING STACK AND CHIMNEY WORK) POWER DRIVEN HOLE DIGGER WITH LESS THAN 30' MAST. VACUUMTRUCK, DOZER, LOADER OR HIGH LIFT (TRACK LOADER-NOT SKIDSTEER TYPE) AND BULLDOZER | $34.07 | $19.05 | $53.12 | ENGI0627-023 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY, INCLUDING ALL OVERHEAD CRANES TYPES. CRANES EQUIPMENT (AS RATED BY MFG.) 3 CU.YD. AND OVER GUY DERRICK, WHIRLEY, POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) EXCAVATOR, BACKHOE, MOTOR PATROL (BLADE) | $35.40 | $19.05 | $54.45 | ENGI0627-023 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY, INCLUDING ALL OVERHEAD CRANES TYPES | $36.14 | $19.05 | $55.19 | ENGI0627-023 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 10 TRCUK CRANE OILER AND DRIVER, CRANE OILER, PERMANENT BUILDING TYPE ELEVATOR OPERATOR, OILER/ ASSISTNAT ENGINEERS NO CERTIFICATION OR LESS CERTIFICATION THAN ANY ABOVE GROUP | $27.25 | $19.05 | $46.30 | ENGI0627-023 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. INCLUDUNG ALL OVERHEAD CRANE TYPES. #CRANCES OVER 400 TONS UP TO AND INCLUDING 500 TONS ADD ADDITIONAL $.75 PER HOUR. CRANES OVER 500 TONS AND UP TO AND INCLUDING 700 TONS ASS AN ADDITIONAL $1.50 PER HOUR. CRANES OVER 700 TONS SHALL ADD ADDITIONAL $3.00 PER HOUR. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 | ENGI0627-023 eff. 06/01/2025 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $32.10 | $17.38 | $49.48 | IRON0048-014 eff. 06/01/2025 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $41.00 | $16.03 | $57.03 | PLUM0344-006 eff. 07/01/2025 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $38.25 | $15.54 | $53.79 | PLUM0344-019 eff. 07/01/2023 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $41.00 | $16.03 | $57.03 | PLUM0344-024 eff. 07/01/2025 |
| ROOFER | $26.30 | $10.34 | $36.64 | ROOF0143-001 eff. 07/01/2024 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $39.05 | $25.77 | $64.82 | SFOK0669-002 eff. 04/01/2025 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $33.38 | $16.36 | $49.74 | SHEE0124-010 eff. 07/01/2021 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.60 EO 13658 minimum $13.65 may apply | $0.00 | $11.60 | SUOK2012-029 eff. 07/30/2012 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $17.57 | $4.64 | $22.21 | SUOK2012-029 eff. 07/30/2012 |
| PLASTERER | $16.10 | $0.00 | $16.10 | SUOK2012-029 eff. 07/30/2012 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.42 EO 13658 minimum $13.65 may apply | $0.00 | $12.42 | SUOK2012-029 eff. 07/30/2012 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $13.38 EO 13658 minimum $13.65 may apply | $1.54 | $14.92 | SUOK2012-029 eff. 07/30/2012 |
| OPERATOR: LOADER (FRONT END) | $16.18 | $0.00 | $16.18 | SUOK2012-029 eff. 07/30/2012 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 | SUOK2012-029 eff. 07/30/2012 |
| OPERATOR: FORKLIFT | $20.55 | $0.00 | $20.55 | SUOK2012-029 eff. 07/30/2012 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 | $22.99 | SUOK2012-029 eff. 07/30/2012 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.25 | $4.35 | $25.60 | SUOK2012-029 eff. 07/30/2012 |
| LABORER: PLASTER TENDER | $11.00 EO 13658 minimum $13.65 may apply | $0.00 | $11.00 | SUOK2012-029 eff. 07/30/2012 |
| LABORER: PIPELAYER | $12.39 EO 13658 minimum $13.65 may apply | $0.00 | $12.39 | SUOK2012-029 eff. 07/30/2012 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 EO 13658 minimum $13.65 may apply | $1.91 | $14.91 | SUOK2012-029 eff. 07/30/2012 |
| LABORER: MASON TENDER - BRICK | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUOK2012-029 eff. 07/30/2012 |
| LABORER: LANDSCAPE | $13.75 | $0.00 | $13.75 | SUOK2012-029 eff. 07/30/2012 |
| LABORER: COMMON OR GENERAL | $11.70 EO 13658 minimum $13.65 may apply | $0.00 | $11.70 | SUOK2012-029 eff. 07/30/2012 |
| IRONWORKER, REINFORCING | $17.11 | $0.00 | $17.11 | SUOK2012-029 eff. 07/30/2012 |
| GLAZIER | $12.02 EO 13658 minimum $13.65 may apply | $2.42 | $14.44 | SUOK2012-029 eff. 07/30/2012 |
| FENCE ERECTOR | $14.00 | $0.00 | $14.00 | SUOK2012-029 eff. 07/30/2012 |
| ELECTRICIAN: ALARM INSTALLATION | $20.97 | $5.22 | $26.19 | SUOK2012-029 eff. 07/30/2012 |
| DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $14.38 | $0.00 | $14.38 | SUOK2012-029 eff. 07/30/2012 |
| DRYWALL FINISHER/TAPER | $13.74 | $0.00 | $13.74 | SUOK2012-029 eff. 07/30/2012 |
| CEMENT MASON/CONCRETE FINISHER | $16.75 | $0.00 | $16.75 | SUOK2012-029 eff. 07/30/2012 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.61 | $3.00 | $19.61 | SUOK2012-029 eff. 07/30/2012 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $14.98 | $0.00 | $14.98 | SUOK2012-029 eff. 07/30/2012 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.