Oklahoma prevailing wage rates: OK20260059
Building construction in Mayes County.
OK20260059, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BOILERMAKER | $33.70 | $24.41 | $58.11 | BOIL0592-001 eff. 01/01/2025 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS) | $38.38 | $12.89 | $51.27 | ELEC0584-006 eff. 06/01/2025 |
ELEVATOR MECHANICScope and notesPAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $51.24 | $38.44 | $89.68 | ELEV0083-003 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKKLIFT | $28.77 | $19.05 | $47.82 | ENGI0627-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE;BACKHHOE; TRACKHOE; EXCAVATOR AND BULLDOZER | $34.07 | $19.05 | $53.12 | ENGI0627-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 | ENGI0627-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 | ENGI0627-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 | $46.30 | ENGI0627-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 | ENGI0627-022 eff. 06/01/2025 |
| IRONWORKER, STRUCTURAL | $30.35 | $16.83 | $47.18 | IRON0584-010 eff. 06/01/2024 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $36.65 | $16.03 | $52.68 | PLUM0430-007 eff. 07/01/2025 |
| PIPEFITTER (INCLUDING HVAC PIPE AND UNIT INSTALLATION) | $36.65 | $16.03 | $52.68 | PLUM0430-022 eff. 07/01/2025 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $35.49 | $14.60 | $50.09 | SHEE0270-009 eff. 06/01/2020 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $39.95 | $0.38 | $40.33 | SUOK2012-039 eff. 06/18/2012 |
| ROOFER | $15.00 | $0.29 | $15.29 | SUOK2012-039 eff. 06/18/2012 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.56 EO 13658 minimum $13.65 may apply | $0.00 | $13.56 | SUOK2012-039 eff. 06/18/2012 |
| LABORER: PIPELAYER | $12.93 EO 13658 minimum $13.65 may apply | $0.00 | $12.93 | SUOK2012-039 eff. 06/18/2012 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.04 EO 13658 minimum $13.65 may apply | $0.00 | $13.04 | SUOK2012-039 eff. 06/18/2012 |
| LABORER: MASON TENDER - BRICK | $10.25 EO 13658 minimum $13.65 may apply | $0.00 | $10.25 | SUOK2012-039 eff. 06/18/2012 |
| LABORER: COMMON OR GENERAL | $11.51 EO 13658 minimum $13.65 may apply | $0.00 | $11.51 | SUOK2012-039 eff. 06/18/2012 |
| ELECTRICIAN: ALARM INSTALLATION | $20.47 | $4.52 | $24.99 | SUOK2012-039 eff. 06/18/2012 |
| ELECTRICIAN (SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION) | $22.10 | $5.76 | $27.86 | SUOK2012-039 eff. 06/18/2012 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $21.14 | $4.96 | $26.10 | SUOK2012-039 eff. 06/18/2012 |
| CEMENT MASON/CONCRETE FINISHER | $16.91 | $0.61 | $17.52 | SUOK2012-039 eff. 06/18/2012 |
| CAULKER | $20.00 | $1.61 | $21.61 | SUOK2012-039 eff. 06/18/2012 |
| CARPENTER | $13.42 EO 13658 minimum $13.65 may apply | $0.00 | $13.42 | SUOK2012-039 eff. 06/18/2012 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 | SUOK2012-039 eff. 06/18/2012 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.