PrevailCrew

Oregon prevailing wage rates: OR20260056

Heavy construction in Jackson County.

OR20260056, modification 2, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

No base or fringe rates changed. The modification may have changed notes or other text.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

OR20260056 wage rates
ClassificationBaseFringeTotalRate ID
CARPENTERS: (INCLUDING FORM WORK)$53.94$16.81$70.75CARP0503-013
eff. 06/01/2025
ELECTRICIAN$47.04$21.84$68.88ELEC0659-012
eff. 01/01/2026
POWER EQUIPMENT OPERATOR GROUP 6 OILER; BOBCAT/SKID LOADER; GRADE CHECKER; CRANE OILER; ASPHALT SPREADER; BROOM OPERATOR; FORKLIFT; ROLLER (NON-ASPHALT)$45.81$16.90$62.71ENGI0701-032
eff. 01/01/2024
POWER EQUIPMENT OPERATOR GROUP 5 TRACKHOE HYDRAULIC: UP TO AND INCLUDING 20,000 LBS.; BOOM TRUCK OPERATOR; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR LESS THAN 20,000 LBS PULLBACK; CONCRETE PUMPER; CONCRETE PAVER: COMPACTOR; FORKLIFT OVER 5 TON, BULLDOZER 20,000 LBS OR 100 HORSES OR LESS; MIXER OPERATOR; ROLLER$49.03$16.90$65.93ENGI0701-032
eff. 01/01/2024
POWER EQUIPMENT OPERATOR GROUP 4 CRANE: HYDRAULIC CRANE OPERATOR, UNDER 50 TONS; LATTICE BOOM CRANE OPERATOR: LATTICE BOOM CRANE OPERATOR, UNDER 50 TONS; TRACKHOE-ROBOTIC: UP TO AND INCLUDING 20,0000 LBS. WITH ANY OR ALL ATTACHMENTS; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR OVER 20,000 LBS PULLBACK; CRANE: CHICAGO BOOM AND SIMILAR TYPES; BOOM TYPE LIFTING DEVICE, 5 TON CAPACITY OR LESS; ASPHALT PAVER; RUBBER-TIRED SCRAPER, SINGLE ENGINE, SINGLE SCRAPER; COMPACTOR-SELF PROPELLED; BULLDOZER OVER 20,000 LBS AND MORE THAN 100 HORSE UP TO 70,000 LBS; CRANE: DERRICK BARGE OPERATOR LESS THAN 30 TON; PILEDRIVER; SCREED; BLADE OPERATOR$50.27$16.90$67.17ENGI0701-032
eff. 01/01/2024
POWER EQUIPMENT OPERATOR GROUP 3 HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANES: LATTICE BOOM CRANE-50 THROUGH 89 TONS (AND LESS THAN 150 FEET BOOM); RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS; BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS$53.60$16.90$70.50ENGI0701-032
eff. 01/01/2024
POWER EQUIPMENT OPERATOR GROUP 2 CRANE: CABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); TOWER/WHIRLEY OPERATOR: TOWER CRANE OPERATOR; WHIRLEY OPERATOR, UNDER 90 TONS; LATTICE BOOM CRANE: 90 THROUGH 199 TONS AND/OR 150 TO 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITH LUFFING OR TOWER ATTACHMENT); RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS; BULLDOZER OVER 120,000 LBS AND ABOVE; CRANE: DERRICK BARGE OPERATOR 30 TON BUT LESS THAN 150 TON; BLADE OPERATOR-ROBOTIC$54.75$16.90$71.65ENGI0701-032
eff. 01/01/2024
POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER$60.98$16.90$77.88ENGI0701-032
eff. 01/01/2024
POWER EQUIPMENT OPERATOR GROUP 1A HYDRAULIC CRANE: HYDRAULIC OPERATOR, 200 TONS AND OVER (WITH LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANE: OPERATOR, 200 TONS THROUGH 299 TONS, WITH OVER 200 FEET BOOM;$58.82$16.90$75.72ENGI0701-032
eff. 01/01/2024
POWER EQUIPMENT OPERATOR GROUP 1 CRANE: HELICOPTER OPERATOR, WHEN USED IN ERECTING WORK; WHIRLEY OPERATOR, 90 TON AND OVER; LATTICE BOOM CRANE: OPERATOR 200 TONS THROUGH 299 TONS, AND/OR OVER 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS WITH LUFFING OR TOWER ATTACHMENTS;$56.66$16.90$73.56ENGI0701-032
eff. 01/01/2024
IRONWORKER (ORNAMENTAL, REINFORCING, AND STRUCTURAL)$48.31$34.52$82.83IRON0029-011
eff. 07/07/2025
LABORERS: (MASON TENDER-CEMENT/CONCRETE)$43.79$17.05$60.84LABO0737-005
eff. 06/01/2024
LABORERS: (MASON TENDER-BRICK)$43.79$17.05$60.84LABO0737-006
eff. 06/01/2024
LABORERS: GROUP 3 FLAGGER, TRAFFIC CONTROL-CONE SETTER$34.39$17.30$51.69LABO0737-027
eff. 06/01/2024
LABORERS: GROUP 2 VIBRATING PLATE$40.41$17.30$57.71LABO0737-027
eff. 06/01/2024
LABORERS: GROUP 1 BLASTER, DEMOLITION; GENERAL LABORER; CHAIN SAW$39.11$17.30$56.41LABO0737-027
eff. 06/01/2024
PAINTERS: (INCLUDING BRUSH AND ROLLER)$39.94$16.68$56.62PAIN0010-007
eff. 07/01/2025
CEMENT MASON/CONCRETE FINISHER$46.13$20.31$66.44PLAS0555-006
eff. 06/01/2025
TRUCK DRIVER: WATER TRUCK$18.41$6.58$24.99SUOR2009-054
eff. 11/23/2009
TRUCK DRIVER: OFF THE ROAD TRUCK$21.86$7.08$28.94SUOR2009-054
eff. 11/23/2009
TRUCK DRIVER: LOWBOY TRUCK$17.07$5.50$22.57SUOR2009-054
eff. 11/23/2009
TRUCK DRIVER: DUMP TRUCK$16.00$4.33$20.33SUOR2009-054
eff. 11/23/2009
PAINTER: SPRAY$19.77$0.00$19.77SUOR2009-054
eff. 11/23/2009
OPERATOR: TRACTOR$20.00$0.73$20.73SUOR2009-054
eff. 11/23/2009
OPERATOR: MECHANIC$26.57$9.97$36.54SUOR2009-054
eff. 11/23/2009
OPERATOR: LOADER$22.91$7.72$30.63SUOR2009-054
eff. 11/23/2009
OPERATOR: EXCAVATOR$21.61$7.05$28.66SUOR2009-054
eff. 11/23/2009
OPERATOR: BACKHOE$21.68$5.88$27.56SUOR2009-054
eff. 11/23/2009
LABORER: PIPELAYER$18.57$6.24$24.81SUOR2009-054
eff. 11/23/2009
LABORER: LANDSCAPE$10.60
EO 13658 minimum $13.65 may apply
$1.80$12.40SUOR2009-054
eff. 11/23/2009
LABORER: GRADE CHECKER$20.02$7.22$27.24SUOR2009-054
eff. 11/23/2009
LABORER: FORM-STRIPPING$19.27$6.32$25.59SUOR2009-054
eff. 11/23/2009
LABORER: ASPHALT SPREADER$22.18$9.39$31.57SUOR2009-054
eff. 11/23/2009
HIGHWAY/PARKING LOT STRIPING: PAINTER$23.79$6.57$30.36SUOR2009-054
eff. 11/23/2009
TRUCK DRIVER GROUP 1 FLATBED TRUCK$35.41$18.30$53.71TEAM0037-011
eff. 06/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.