PrevailCrew

Pennsylvania prevailing wage rates: PA20260003

Building construction in Philadelphia County.

PA20260003, modification 2, published 10/01/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

  • changed CARPENTER/LATHER base $55.82 → $57.72 (+$1.90), fringe $30.09 → $30.39 (+$0.30) New rates effective 05/01/2026 (previously 05/01/2025).
  • changed ELECTRICIAN base $70.97 → $75.05 (+$4.08), fringe $46.13 → $47.02 (+$0.89) New rates effective 05/04/2026 (previously 05/05/2025).
  • changed ELECTRICIAN (SOUND AND COMMUNICATION TECHNICIAN) (INSTALLATION OF VOICE DATA, IT NETWORK, WIFI)) base $63.97 → $69.62 (+$5.65), fringe $30.40 → $38.39 (+$7.99) New rates effective 05/04/2026 (previously 05/02/2022).
  • changed MILLWRIGHT base $54.54 → $55.54 (+$1.00), fringe $38.78 → $40.47 (+$1.69) New rates effective 05/01/2026 (previously 05/01/2025).
  • changed PLUMBER base $70.53 → $73.73 (+$3.20), fringe $38.81 → $39.86 (+$1.05) New rates effective 05/01/2026 (previously 05/01/2025).
14 classifications added, 14 removed or reworded
  • added ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) $60.84 + $48.38 fringe
  • removed ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) was $60.84 + $48.38 fringe
  • added PAINTER: BRUSH, ROLLER $41.24 + $28.10 fringe
  • added PAINTER: SPRAY, STEEL AND SWING $42.49 + $28.10 fringe
  • removed PAINTERS: (BRUSH, ROLLER) was $41.24 + $28.10 fringe
  • removed PAINTERS: (SPRAY, STEEL AND SWING) was $42.49 + $28.10 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELICOPTERS, CONCRETE PUMPS BUILDING MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. $54.52 + $34.49 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTORY RATING; CRANES DOING HOOK WORK 15 TON AND OVER FACTORY RATING; ANY MACHINES HANDLING MACHINERY; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (BUILDING) 120 FEET OF BOOM LENGTH OR LESS (200 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. $57.52 + $35.38 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS 21E AND OVER, TRENCHING MACHINES, TRENCH SHOVEL, GRADALLS, FRONT-END LOADERS, BOAT CAPTAIN, PIPPIN TYPE BACKHOES, TANDEMS SCRAPERS, TOWERS TYPE CRANE OPERATION ERECTING, DISMANTLING, JUMPING OR JACKING, DRILLS (SELF-CONTAINES), (DRILLMASTER TYPE) FORKLIFT (20 FT. AND OVER), MOTER PATROLS (FINE GRADE), BATCH PLANT WITH MIXER, CARRYALLS, SCRAPER, TROUNAPULLS, ROLLER (HITH GRADE FINISHING), SPREADERS (ASPHALT), BULLDOZERS AND TRACTORS, MECHANIC WELDER, CONVEYOR LOADERS (EUCLID-TYPE WHEEL), CONCRETE PUMP, MILLING MACHINES, HOIST WITH TWO TOWERS, BUILDING HOIST DOUBLE DRUM (UNLESS USED AS A SINGLE DRUM), MUCKING MACHINES IN TUNNEL, ALL AUTO GRADE AND CONCRETE FINISHING MACHINES, BUNDLE PULLERS/EXTRACTORS (TUBLAR), BOBCAT. SIDE BROOM, DIRECTIONAL BORING MACHINES, VERMEER SAW TYPE MACHINES(OTHER THAN THAN HAND HELD TRACTOR MOUNTED HYDRO AXE, CHIPPER WITH BOOM, ALL) MACHINE SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY $54.27 + $34.42 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (HEAVY/HIGHWAY); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. $57.29 + $35.29 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS ELEVATOR OPERATOR (NEW CONSTRUCTION) MACHINE SIMILAR TO THE ABOVE,INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY $50.18 + $33.22 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK, TOXIC/HAZARDOUS WATE REMOVAL RATE 20 PER CENT ADDED TO ALL CLASSIFICATIONS AND MACHIINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY $49.88 + $33.13 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (POWER BOATS),ELEVATOR OPERATORS (RENOVATIONS) AND MACHINE SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY $48.16 + $32.62 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 6 FIREMAN, OILERS AND DECK HANDS (PERSONNEL BOATS), GREASE TRUCK. MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY $47.17 + $32.33 fringe
  • removed POWER EQUIPMENT OPERATORS: GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELICOPTERS, CONCRETE PUMPS BUILDING MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. was $54.52 + $34.49 fringe
  • removed POWER EQUIPMENT OPERATORS: GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTORY RATING; CRANES DOING HOOK WORK 15 TON AND OVER FACTORY RATING; ANY MACHINES HANDLING MACHINERY; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (BUILDING) 120 FEET OF BOOM LENGTH OR LESS (200 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. was $57.52 + $35.38 fringe
  • removed POWER EQUIPMENT OPERATORS: GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS 21E AND OVER, TRENCHING MACHINES, TRENCH SHOVEL, GRADALLS, FRONT-END LOADERS, BOAT CAPTAIN, PIPPIN TYPE BACKHOES, TANDEMS SCRAPERS, TOWERS TYPE CRANE OPERATION ERECTING, DISMANTLING, JUMPING OR JACKING, DRILLS (SELF-CONTAINES), (DRILLMASTER TYPE) FORKLIFT (20 FT. AND OVER), MOTER PATROLS (FINE GRADE), BATCH PLANT WITH MIXER, CARRYALLS, SCRAPER, TROUNAPULLS, ROLLER (HITH GRADE FINISHING), SPREADERS (ASPHALT), BULLDOZERS AND TRACTORS, MECHANIC WELDER, CONVEYOR LOADERS (EUCLID-TYPE WHEEL), CONCRETE PUMP, MILLING MACHINES, HOIST WITH TWO TOWERS, BUILDING HOIST DOUBLE DRUM (UNLESS USED AS A SINGLE DRUM), MUCKING MACHINES IN TUNNEL, ALL AUTO GRADE AND CONCRETE FINISHING MACHINES, BUNDLE PULLERS/EXTRACTORS (TUBLAR), BOBCAT. SIDE BROOM, DIRECTIONAL BORING MACHINES, VERMEER SAW TYPE MACHINES(OTHER THAN THAN HAND HELD TRACTOR MOUNTED HYDRO AXE, CHIPPER WITH BOOM, ALL) MACHINE SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY was $54.27 + $34.42 fringe
  • removed POWER EQUIPMENT OPERATORS: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (HEAVY/HIGHWAY); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. was $57.29 + $35.29 fringe
  • removed POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS ELEVATOR OPERATOR (NEW CONSTRUCTION) MACHINE SIMILAR TO THE ABOVE,INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY was $50.18 + $33.22 fringe
  • removed POWER EQUIPMENT OPERATORS: GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK, TOXIC/HAZARDOUS WATE REMOVAL RATE 20 PER CENT ADDED TO ALL CLASSIFICATIONS AND MACHIINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY was $49.88 + $33.13 fringe
  • removed POWER EQUIPMENT OPERATORS: GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (POWER BOATS),ELEVATOR OPERATORS (RENOVATIONS) AND MACHINE SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY was $48.16 + $32.62 fringe
  • removed POWER EQUIPMENT OPERATORS: GROUP 6 FIREMAN, OILERS AND DECK HANDS (PERSONNEL BOATS), GREASE TRUCK. MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY was $47.17 + $32.33 fringe
  • added ROOFER: COMPOSITION $41.48 + $33.37 fringe
  • added ROOFER: SHINGLES $31.25 + $21.75 fringe
  • added ROOFER: SLATE AND TILE $34.25 + $21.75 fringe
  • removed ROOFERS: COMPOSITION was $41.48 + $33.37 fringe
  • removed ROOFERS: SHINGLES was $31.25 + $21.75 fringe
  • removed ROOFERS: SLATE AND TILE was $34.25 + $21.75 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

PA20260003 wage rates
ClassificationBaseFringeTotalRate ID
ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$60.84$48.38$109.22ASBE0014-001
eff. 05/01/2025
BOILERMAKER$55.00$35.48$90.48BOIL0013-001
eff. 01/01/2025
BRICKLAYER$48.70$31.61$80.31BRPA0001-006
eff. 05/01/2024
TILE SETTER$51.36$30.02$81.38BRPA0001-008
eff. 05/01/2024
MASON - STONE$48.40$31.95$80.35BRPA0001-011
eff. 05/01/2024
POINTER, CAULKER AND CLEANER$50.00$30.70$80.70BRPA0001-015
eff. 05/01/2024
CARPENTER/LATHER$57.72$30.39$88.11CARP0158-001
eff. 05/01/2026
MILLWRIGHT$55.54$40.47$96.01CARP0219-005
eff. 05/01/2026
FLOOR LAYER: CARPET$56.51$32.39$88.90CARP0251-001
eff. 05/01/2025
PILEDRIVERMAN$48.25$44.92$93.17CARP0474-004
eff. 05/01/2025
ELECTRICIAN$75.05$47.02$122.07ELEC0098-003
eff. 05/04/2026
ELECTRICIAN (SOUND AND COMMUNICATION TECHNICIAN) (INSTALLATION OF VOICE DATA, IT NETWORK, WIFI))$69.62$38.39$108.01ELEC0098-014
eff. 05/04/2026
ELEVATOR MECHANIC
Scope and notes

FOOTNOTES FOR ELEVATOR MECHANICS: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY

$71.85$38.44$110.29ELEV0005-001
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELICOPTERS, CONCRETE PUMPS BUILDING MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT.
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY

$54.52$34.49$89.01ENGI0542-002
eff. 05/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTORY RATING; CRANES DOING HOOK WORK 15 TON AND OVER FACTORY RATING; ANY MACHINES HANDLING MACHINERY; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (BUILDING) 120 FEET OF BOOM LENGTH OR LESS (200 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER.
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY

$57.52$35.38$92.90ENGI0542-002
eff. 05/01/2025
POWER EQUIPMENT OPERATOR: GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS 21E AND OVER, TRENCHING MACHINES, TRENCH SHOVEL, GRADALLS, FRONT-END LOADERS, BOAT CAPTAIN, PIPPIN TYPE BACKHOES, TANDEMS SCRAPERS, TOWERS TYPE CRANE OPERATION ERECTING, DISMANTLING, JUMPING OR JACKING, DRILLS (SELF-CONTAINES), (DRILLMASTER TYPE) FORKLIFT (20 FT. AND OVER), MOTER PATROLS (FINE GRADE), BATCH PLANT WITH MIXER, CARRYALLS, SCRAPER, TROUNAPULLS, ROLLER (HITH GRADE FINISHING), SPREADERS (ASPHALT), BULLDOZERS AND TRACTORS, MECHANIC WELDER, CONVEYOR LOADERS (EUCLID-TYPE WHEEL), CONCRETE PUMP, MILLING MACHINES, HOIST WITH TWO TOWERS, BUILDING HOIST DOUBLE DRUM (UNLESS USED AS A SINGLE DRUM), MUCKING MACHINES IN TUNNEL, ALL AUTO GRADE AND CONCRETE FINISHING MACHINES, BUNDLE PULLERS/EXTRACTORS (TUBLAR), BOBCAT. SIDE BROOM, DIRECTIONAL BORING MACHINES, VERMEER SAW TYPE MACHINES(OTHER THAN THAN HAND HELD TRACTOR MOUNTED HYDRO AXE, CHIPPER WITH BOOM, ALL) MACHINE SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$54.27$34.42$88.69ENGI0542-002
eff. 05/01/2025
POWER EQUIPMENT OPERATOR: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (HEAVY/HIGHWAY); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER.
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY

$57.29$35.29$92.58ENGI0542-002
eff. 05/01/2025
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS ELEVATOR OPERATOR (NEW CONSTRUCTION) MACHINE SIMILAR TO THE ABOVE,INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$50.18$33.22$83.40ENGI0542-002
eff. 05/01/2025
POWER EQUIPMENT OPERATOR: GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK, TOXIC/HAZARDOUS WATE REMOVAL RATE 20 PER CENT ADDED TO ALL CLASSIFICATIONS AND MACHIINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$49.88$33.13$83.01ENGI0542-002
eff. 05/01/2025
POWER EQUIPMENT OPERATOR: GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (POWER BOATS),ELEVATOR OPERATORS (RENOVATIONS) AND MACHINE SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$48.16$32.62$80.78ENGI0542-002
eff. 05/01/2025
POWER EQUIPMENT OPERATOR: GROUP 6 FIREMAN, OILERS AND DECK HANDS (PERSONNEL BOATS), GREASE TRUCK. MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY$47.17$32.33$79.50ENGI0542-002
eff. 05/01/2025
IRONWORKER: STRUCTURAL AND ORNAMENTAL$56.50$45.30$101.80IRON0401-002
eff. 07/01/2025
IRONWORKER: REINFORCING
Scope and notes

THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY

$50.39$36.05$86.44IRON0405-002
eff. 07/01/2025
IRONWORKER: RIGGER AND MACHINERY MOVER
Scope and notes

THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY

$46.86$36.05$82.91IRON0405-004
eff. 07/01/2025
LABORER: GROUP 2 POWER BUGGIES; BURNERS ON DEMOLITION$39.20$26.69$65.89LABO0332-001
eff. 05/01/2025
LABORER: GROUP 3 WAGON DRILL OPERATOR (SINGLE)$39.25$26.69$65.94LABO0332-001
eff. 05/01/2025
LABORER: GROUP 4 POWDERMEN; WAGON DRILL OPERATOR (MULTIPLE); CIRCULAR CAISSON EXCAVATION; UNDERPINNING EXCAVATION$39.40$26.69$66.09LABO0332-001
eff. 05/01/2025
LABORER: GROUP 5 CAISSON BOTTOM MAN$39.45$26.69$66.14LABO0332-001
eff. 05/01/2025
LABORER: GROUP 6 YARD WORKERS$39.24$26.69$65.93LABO0332-001
eff. 05/01/2025
LABORER: GROUP 7 TRACKMEN; BRAKEMEN; GROUTMEN; BOTTOM SHAFT MEN; ALL OTHER MEN IN FREE AIR TUNNELS$40.38$26.69$67.07LABO0332-001
eff. 05/01/2025
LABORER: GROUP 8 FORM SETTERS$40.53$26.69$67.22LABO0332-001
eff. 05/01/2025
LABORER: GROUP 9 MINERS BORE DRIVER; BLASTERS; DRILLERS; PNEUMATIC SHIELD OPERATORS$40.68$26.69$67.37LABO0332-001
eff. 05/01/2025
LABORER: GROUP 1 BUILDING SITE WORK; STRIPPING AND DISMANTLING CONCRETE FORM WORK; LOADING, UNLOADING, CARRYING AND HANDLING OF ALL REINFORCED STEEL AND STEEL MESH; HANDLING LUMBER AND OTHER BUILDING MATERIALS; OPERATING JACKHAMMERS, PAVING BREAKERS AND ALL OTHER PNEUMATIC TOOLS; BUILDING SCAFFOLDS; RAKING, SHOVELING AND TAMPING OF ASPHALT; SPADING AND CONCRETE PIT WORK; GRADING; FORM PINNING; SHORING; DEMOLITION EXCEPT BURNERS; LAYING CONDUITS AND DUCTS; SHEATHING; LAGGING; LAYING NON-METALLIC PIPE AND CAULKING; ALL OTHER TYPES OF LABORERS; POURING CONCRETE; OPERATING VIBRATOR; FREE AIR TUNNELS: MINERS$39.10$26.69$65.79LABO0332-001
eff. 05/01/2025
LABORER: GROUP 10 WELDERS AND BURNERS$40.93$26.69$67.62LABO0332-001
eff. 05/01/2025
LABORER: GROUP 11 MASON TENDER$39.50$26.69$66.19LABO0332-001
eff. 05/01/2025
LABORER: ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE REMOVAL, LEAD BASED PAINT REMOVAL$41.00$27.04$68.04LABO0332-002
eff. 05/01/2025
LANDSCAPE LABORER FARM TRACTOR DRIVER, HYDROSEEDER NOZZLEMAN AND MULCHER NOZZLEMAN:
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY

$31.73$23.72$55.45LABO0413-004
eff. 05/01/2025
MARBLE FINISHER$25.10$20.75$45.85MARB0001-003
eff. 05/01/2021
TERRAZZO FINISHER$27.03$20.58$47.61MARB0001-003
eff. 05/01/2021
TILE FINISHER$25.10$20.75$45.85MARB0001-003
eff. 05/01/2021
MARBLE SETTER$44.90$30.75$75.65MARB0003-002
eff. 05/01/2021
TERRAZZO WORKER/SETTER$48.01$28.67$76.68MARB0003-002
eff. 05/01/2021
PAINTER: BRUSH, ROLLER$41.24$28.10$69.34PAIN0021-001
eff. 05/01/2021
PAINTER: SPRAY, STEEL AND SWING$42.49$28.10$70.59PAIN0021-001
eff. 05/01/2021
DRYWALL FINISHER/TAPER$42.25$32.16$74.41PAIN0021-012
eff. 05/01/2024
WINDOW TINTER$25.02$13.06$38.08PAIN0252-001
eff. 06/01/2021
GLAZIER$46.09$34.83$80.92PAIN0252-006
eff. 05/01/2022
CEMENT MASON/CONCRETE FINISHER$48.70$32.26$80.96PLAS0592-011
eff. 05/01/2025
PLASTERER$45.08$33.59$78.67PLAS0592-014
eff. 05/01/2025
STEAMFITTER$72.52$44.58$117.10PLUM0420-008
eff. 05/01/2025
PLUMBER$73.73$39.86$113.59PLUM0690-002
eff. 05/01/2026
ROOFER: COMPOSITION
Scope and notes

FOOTNOTE (COMPOSITION ROOFER ONLY): A. PAID HOLIDAY: ELECTION DAY

$41.48$33.37$74.85ROOF0030-001
eff. 05/01/2022
ROOFER: SHINGLES
Scope and notes

FOOTNOTE (COMPOSITION ROOFER ONLY): A. PAID HOLIDAY: ELECTION DAY

$31.25$21.75$53.00ROOF0030-001
eff. 05/01/2022
ROOFER: SLATE AND TILE$34.25$21.75$56.00ROOF0030-001
eff. 05/01/2022
SPRINKLER FITTER$66.22$34.25$100.47SFPA0692-001
eff. 01/01/2025
SHEET METAL WORKER$62.62$50.66$113.28SHEE0019-008
eff. 05/01/2025
SHEET METAL WORKER (SIGN MAKERS & HANGERS)$33.89$24.25$58.14SHEE0019-023
eff. 07/15/2024
TRUCK DRIVER, BUILDING CONSTRUCTION: GROUP 1 STAKE BODY TRUCK (SINGLE AXLE), 11/2 TON AND UNDER VEHICLES
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY

$37.57$23.32$60.89TEAM0107-001
eff. 05/01/2025
TRUCK DRIVER, BUILDING CONSTRUCTION: GROUP 2 TRUCK DRIVER OVER 11/2 TONS, DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS AND DUMCRETE TYPE VEHICLE, ASPHALT DISTRIBUTORS, FARM TRACTORS WHEN USED FOR TRANSPORTATION, STAKE BODY TRUCK (TANDEM)
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY

$37.67$23.32$60.99TEAM0107-001
eff. 05/01/2025
TRUCK DRIVER, BUILDING CONSTRUCTION: GROUP 3 EUCLID TYPE, OFF-HIGHWAY EQUIPMENT - BACK OR BELLY DUMP TRUCKS AND DOUBLE-HITCHED EQUIPMENT, STRADDLE (ROSS) CARRIER, LOWBED TRAILERS
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY

$37.92$23.32$61.24TEAM0107-001
eff. 05/01/2025
TRUCK DRIVER, SITE PREPARATION, PAVING AND UTILITIES ON BUILDING CONSTRUCTION: GROUP 1 - STAKE BODY TRUCK (SINGLE AXLE), DUMPSTER
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY

$37.57$23.32$60.89TEAM0107-001
eff. 05/01/2025
TRUCK DRIVER, SITE PREPARATION, PAVING AND UTILITIES ON BUILDING CONSTRUCTION: GROUP 2 - DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, AND DUMPCRETE TYPE VEHICLES, ASPHALT DISTRIBUTORS, FARM TRACTOR WHEN USED FOR TRANSPORTATION, STAKE BODY TRUCK (TANDEM)
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY

$37.67$23.32$60.99TEAM0107-001
eff. 05/01/2025
TRUCK DRIVER, SITE PREPARATION, PAVING AND UTILITIES ON BUILDING CONSTRUCTION: GROUP 3 - EUCLID TYPE, OFF-HIGHWAY EQUIPMENT OR BELL DUMP TRUCKS AND DOUBLE HITCHED EQUIPMENT, STADDLE (ROSS) CARRIER, LOW-BED TRAILERS
Scope and notes

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY

$37.92$23.32$61.24TEAM0107-001
eff. 05/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 10/01/2026. We format and check the official text; the determination in your contract is what applies.