Pennsylvania prevailing wage rates: PA20260005
Residential construction in Beaver, Fayette, Washington Counties.
PA20260005, modification 3, published 08/20/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 2
- changed SHEET METAL (EXCLUDING HVAC DUCT) base $19.49 → $28.00 (+$8.51), fringe $10.08 → $10.87 (+$0.79) New rates effective 07/01/2026 (previously 07/01/2018).
3 classifications added, 3 removed or reworded
- added POWER EQUIPMENT OPERATOR: CLASS I ASPHALT PAVER, ASPHALT ROLLER, ASPHALT PLANT OPERATOR, ATHEY LOADER, AUGER (TRUCK OR TRACTOR MOUNTED), AUTO GRADER (C.M.I. AND SIMILAR), BACKHOE (180' AND 360' SWING), BACK-FILLING MACHINE, BATCH PLANT, BULLDOZER, CABLE LAYER, CABLEWAY, CAISSON DRILL, CENTRAL MIX PLANT, COMPACTOR WITH BLADE, CONCRETE PUMP (ALL TYPES), OVER-HEAD CRANE, CRANE (CRAWLER OR TRUCK MOUNTED)*, TOWER CRANE (STATIONARY OR CLIMBING TYPE), ROUGH TERRAIN CRANE**, WAGON CRANE, CRUSHING AND/OR SCREENING PLANT, DERRICK TRAVELER, DERRICK (ALL TYPES)(WHEN ASSISTANCE IS NEEDED IT WILL BE AN OILER OR APPRENTICE), DERRICK BOATS, DRAGLINE, DRILL (DAVEY OR SIMILAR), DREDGE, DRILL (WELL AND CORE)(TRUCK OR SKID MOUNTED), ELEVATOR, EXCAVATING EQUIPMENT (ALL OTHER), FORK LIFT (LULL OR SIMILAR), FRANKI PILE MACHINE (OR SIMILAR), GUARD POST DRIVER, GRADALL (ALL TYPES), GRADER, ELEVATING GRADER, EQUIPMENT GREASER, HELICOPTER, HELICOPTER HOIST OPERATORS, FRONT END LOADER, HOIST, HYDRAULIC BOOM TRUCK, JUMBO OPERATOR, KOCAL, KOEHRING SCOOPER, LOCOMOTIVE, METRO CHIP HARVESTER (OR SIMILAR), MIX MOBILE, MIXER - PAVER, MUCKING MACHINE, MULTIPLE BOWL MACHINES, PILE DRIVER (SONIC OR SIMILAR), SCRAPERS, SHOVELS (POWERED), SLIP FORM PAVER (C.M.I. AND SIMILAR), SPREADER (CONCRETE, ASPHALT, OR STONE), TIRE REPAIRMAN (WHEN ASSIGNED TO A JOBSITE), TOWER MOBILE, TRACTORS (ALL TYPES), TRENCHER, TUG BOAT, VERMEER SAW, WELDER (REPAIRMAN), WHIRLEY * CRANES WITH BOOM OR MAST LENGTH (INCLUDING JIB) 100 FT OR OVER SHALL BE PAID AN ADDITIONAL $.50 PER HOUR FOR EACH 50-FOOT INCREMENT OF ADDITIONAL BOOM AND/OR JIB LENGTH) ** ROUGH TERRAIN CRANES WITH BOOM OR MAST LENGTH (INCLUDING JIB) 101 FT OR OVER SHALL BE PAID AN ADDITIONAL $.50 PER HOUR FOR EACH 50-FOOT INCREMENT OF ADDITIONAL BOOM AND/OR JIB LENGTH) NOTE: AN ADDITIONAL $1.25 PER HOUR (NOT COUNTING BOOM PAY) SHALL BE PAID FOR ANY CRANE (EXCLUDING OVERHEAD CRANES) RATED 100 TON OR OVER. GENERAL NOTE: HAZARDOUS MATERIAL SITES LEVEL C & D RECEIVE $1.00 PER HOUR PREMIUM FOR ALL CLASSIFICATIONS AND LEVELS A & B RECEIVE $2.50 PREMIUM FOR ALL CLASSIFICATIONS $31.05 + $15.75 fringe
- added POWER EQUIPMENT OPERATOR: CLASS II BALLAST REGULATOR, BOAT (MATERIAL OR PERSONNEL)(POWERED), BOILER, BORING MACHINE, COMPRESSOR (COMBINED WITH AIR TUGGER, AIR PUMP, GUNITE MACHINE, OR SAND BLASTER), CONCRETE BELT PLACER, CONCRETE SAW, CONVEYOR, CARRY CRANE, CRUSHING/SCREENING PLANTS, CURB BUILDER (SELF-PROPELLED), FORKLIFTS (RIDDEN OR SELF-PROPELLED), FORM LINE MACHINE, GENERATOR (OVER 5KW), GROUT PUMP, HEATERS, HOIST (MONORAIL, ROOF, ONE DRUM-REGARDLESS OF POWER USED), HUCK MACHINE (OR SIMILAR), HYDRAULIC JACK (SINGLE OR MULTIPLE)(POWER DRIVEN), LADAVATOR, MORTAR MIXER, MULCHING MACHINE, PAVEMENT BREAKER (SELF-PROPELLED OR RIDDEN), PIN PULLER (POWERED), PIPE CLEANING MACHINE, PIPE DREAM, POWER BROOM (EXCEPT PUSH TYPE), PULVERIZER, PUMPS (REGARDLESS OF POWER USED), ROLLER/COMPACTOR (DIRT), REFRIGERATION PLANT, ROSS CARRIER (OR SIMILAR), SEEDING MACHINE, SKID STEER LOADER (OR SIMILAR), SLAB LIFTING MACHINE (HYDRAULIC), SOIL STABILIZER (PUMP TYPE), SPRAY CURE MACHINE (POWER DRIVEN), SIDE DELIVERY SHOULDER SPREADER (ATTACHMENT), STEAM JENNY (OR SIMILAR), STONE CRUSHER, STONE SPREADER (SELF-PROPELLED), SIPHON (STEAM OR AIR), TIE TAMPER (MULTIPLE HEADS), TRACTOR (WHEN USED FOR LANDSCAPING, SNAKING, OR HAULING), TRUCK (WINCH)(WHEN HOISTING AND PLACING), TUBE FINISHER (C.M.I. AND SIMILAR), TUGGER, WATER BLASTER, WELDING MACHINE, WELL POINT SYSTEM. GENERAL $27.36 + $15.75 fringe
- added POWER EQUIPMENT OPERATOR: CLASS III BRAKEMAN, DECK HAND, HELICOPTER SIGNALMAN, OILER*, ELEVATOR (ALTERATIONS & REMODELING COMMERCIAL BUILDINGS), * OILERS ON TRUCK CRANES: LESS THAN 50 TON SHALL RECEIVE $.10 OVER THE CLASS III BASE RATE; 50 TON UP TO 100 TON RATED CAPACITY SHALL BE PAID AN ADDITIONAL $.25 PER HOUR OVER THE CLASS III BASE RATE; 100 TON AND OVER SHALL BE PAID AN ADDITIONAL $1.00 PER HOUR OVER THE CLASS III BASE RATE. GENERAL $25.64 + $15.75 fringe
- removed POWER EQUIPMENT OPERATORS: CLASS I ASPHALT PAVER, ASPHALT ROLLER, ASPHALT PLANT OPERATOR, ATHEY LOADER, AUGER (TRUCK OR TRACTOR MOUNTED), AUTO GRADER (C.M.I. AND SIMILAR), BACKHOE (180' AND 360' SWING), BACK-FILLING MACHINE, BATCH PLANT, BULLDOZER, CABLE LAYER, CABLEWAY, CAISSON DRILL, CENTRAL MIX PLANT, COMPACTOR WITH BLADE, CONCRETE PUMP (ALL TYPES), OVER-HEAD CRANE, CRANE (CRAWLER OR TRUCK MOUNTED)*, TOWER CRANE (STATIONARY OR CLIMBING TYPE), ROUGH TERRAIN CRANE**, WAGON CRANE, CRUSHING AND/OR SCREENING PLANT, DERRICK TRAVELER, DERRICK (ALL TYPES)(WHEN ASSISTANCE IS NEEDED IT WILL BE AN OILER OR APPRENTICE), DERRICK BOATS, DRAGLINE, DRILL (DAVEY OR SIMILAR), DREDGE, DRILL (WELL AND CORE)(TRUCK OR SKID MOUNTED), ELEVATOR, EXCAVATING EQUIPMENT (ALL OTHER), FORK LIFT (LULL OR SIMILAR), FRANKI PILE MACHINE (OR SIMILAR), GUARD POST DRIVER, GRADALL (ALL TYPES), GRADER, ELEVATING GRADER, EQUIPMENT GREASER, HELICOPTER, HELICOPTER HOIST OPERATORS, FRONT END LOADER, HOIST, HYDRAULIC BOOM TRUCK, JUMBO OPERATOR, KOCAL, KOEHRING SCOOPER, LOCOMOTIVE, METRO CHIP HARVESTER (OR SIMILAR), MIX MOBILE, MIXER - PAVER, MUCKING MACHINE, MULTIPLE BOWL MACHINES, PILE DRIVER (SONIC OR SIMILAR), SCRAPERS, SHOVELS (POWERED), SLIP FORM PAVER (C.M.I. AND SIMILAR), SPREADER (CONCRETE, ASPHALT, OR STONE), TIRE REPAIRMAN (WHEN ASSIGNED TO A JOBSITE), TOWER MOBILE, TRACTORS (ALL TYPES), TRENCHER, TUG BOAT, VERMEER SAW, WELDER (REPAIRMAN), WHIRLEY * CRANES WITH BOOM OR MAST LENGTH (INCLUDING JIB) 100 FT OR OVER SHALL BE PAID AN ADDITIONAL $.50 PER HOUR FOR EACH 50-FOOT INCREMENT OF ADDITIONAL BOOM AND/OR JIB LENGTH) ** ROUGH TERRAIN CRANES WITH BOOM OR MAST LENGTH (INCLUDING JIB) 101 FT OR OVER SHALL BE PAID AN ADDITIONAL $.50 PER HOUR FOR EACH 50-FOOT INCREMENT OF ADDITIONAL BOOM AND/OR JIB LENGTH) NOTE: AN ADDITIONAL $1.25 PER HOUR (NOT COUNTING BOOM PAY) SHALL BE PAID FOR ANY CRANE (EXCLUDING OVERHEAD CRANES) RATED 100 TON OR OVER. GENERAL NOTE: HAZARDOUS MATERIAL SITES LEVEL C & D RECEIVE $1.00 PER HOUR PREMIUM FOR ALL CLASSIFICATIONS AND LEVELS A & B RECEIVE $2.50 PREMIUM FOR ALL CLASSIFICATIONS was $31.05 + $15.75 fringe
- removed POWER EQUIPMENT OPERATORS: CLASS II BALLAST REGULATOR, BOAT (MATERIAL OR PERSONNEL)(POWERED), BOILER, BORING MACHINE, COMPRESSOR (COMBINED WITH AIR TUGGER, AIR PUMP, GUNITE MACHINE, OR SAND BLASTER), CONCRETE BELT PLACER, CONCRETE SAW, CONVEYOR, CARRY CRANE, CRUSHING/SCREENING PLANTS, CURB BUILDER (SELF-PROPELLED), FORKLIFTS (RIDDEN OR SELF-PROPELLED), FORM LINE MACHINE, GENERATOR (OVER 5KW), GROUT PUMP, HEATERS, HOIST (MONORAIL, ROOF, ONE DRUM-REGARDLESS OF POWER USED), HUCK MACHINE (OR SIMILAR), HYDRAULIC JACK (SINGLE OR MULTIPLE)(POWER DRIVEN), LADAVATOR, MORTAR MIXER, MULCHING MACHINE, PAVEMENT BREAKER (SELF-PROPELLED OR RIDDEN), PIN PULLER (POWERED), PIPE CLEANING MACHINE, PIPE DREAM, POWER BROOM (EXCEPT PUSH TYPE), PULVERIZER, PUMPS (REGARDLESS OF POWER USED), ROLLER/COMPACTOR (DIRT), REFRIGERATION PLANT, ROSS CARRIER (OR SIMILAR), SEEDING MACHINE, SKID STEER LOADER (OR SIMILAR), SLAB LIFTING MACHINE (HYDRAULIC), SOIL STABILIZER (PUMP TYPE), SPRAY CURE MACHINE (POWER DRIVEN), SIDE DELIVERY SHOULDER SPREADER (ATTACHMENT), STEAM JENNY (OR SIMILAR), STONE CRUSHER, STONE SPREADER (SELF-PROPELLED), SIPHON (STEAM OR AIR), TIE TAMPER (MULTIPLE HEADS), TRACTOR (WHEN USED FOR LANDSCAPING, SNAKING, OR HAULING), TRUCK (WINCH)(WHEN HOISTING AND PLACING), TUBE FINISHER (C.M.I. AND SIMILAR), TUGGER, WATER BLASTER, WELDING MACHINE, WELL POINT SYSTEM. GENERAL was $27.36 + $15.75 fringe
- removed POWER EQUIPMENT OPERATORS: CLASS III BRAKEMAN, DECK HAND, HELICOPTER SIGNALMAN, OILER*, ELEVATOR (ALTERATIONS & REMODELING COMMERCIAL BUILDINGS), * OILERS ON TRUCK CRANES: LESS THAN 50 TON SHALL RECEIVE $.10 OVER THE CLASS III BASE RATE; 50 TON UP TO 100 TON RATED CAPACITY SHALL BE PAID AN ADDITIONAL $.25 PER HOUR OVER THE CLASS III BASE RATE; 100 TON AND OVER SHALL BE PAID AN ADDITIONAL $1.00 PER HOUR OVER THE CLASS III BASE RATE. GENERAL was $25.64 + $15.75 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BRICKLAYER (BEAVER COUNTY) | $35.28 | $24.49 | $59.77 | BRPA0009-023 eff. 12/01/2022 |
| BRICKLAYER (WASHINGTON (CROSS CREEK, HANOVER, JEFFERSON, MT PLEASANT, NOTTINGHAM, PETERS, ROBINSON, SMITH, UNION TWPS) COUNTY) | $36.99 | $24.67 | $61.66 | BRPA0009-024 eff. 12/01/2022 |
| BRICKLAYER (FAYETTE (JEFFERSON & WASHINGTON TWPS) COUNTY) | $36.55 | $24.46 | $61.01 | BRPA0009-030 eff. 12/01/2022 |
| BRICKLAYER (FAYETTE (EXCEPT JEFFERSON & WASHINGTON TWPS) COUNTY) | $36.55 | $24.46 | $61.01 | BRPA0009-031 eff. 12/01/2022 |
| CARPENTER (INCLUDING DRYWALL HANGING, VINYL SIDING INSTALLATION,AND ASPHALT ROOFING) | $32.29 | $15.27 | $47.56 | CARP0142-003 eff. 06/01/2023 |
| FLOOR LAYER: CARPET | $33.01 | $16.45 | $49.46 | CARP1759-008 eff. 06/01/2017 |
| ELECTRICIAN (FAYETTE AND WASHINGTON COUNTIES) | $30.20 | $19.14 | $49.34 | ELEC0005-012 eff. 12/27/2024 |
| ELECTRICIAN (BEAVER COUNTY) | $27.15 | $16.72 | $43.87 | ELEC0712-006 eff. 01/01/2024 |
| POWER EQUIPMENT OPERATOR: CLASS I ASPHALT PAVER, ASPHALT ROLLER, ASPHALT PLANT OPERATOR, ATHEY LOADER, AUGER (TRUCK OR TRACTOR MOUNTED), AUTO GRADER (C.M.I. AND SIMILAR), BACKHOE (180' AND 360' SWING), BACK-FILLING MACHINE, BATCH PLANT, BULLDOZER, CABLE LAYER, CABLEWAY, CAISSON DRILL, CENTRAL MIX PLANT, COMPACTOR WITH BLADE, CONCRETE PUMP (ALL TYPES), OVER-HEAD CRANE, CRANE (CRAWLER OR TRUCK MOUNTED)*, TOWER CRANE (STATIONARY OR CLIMBING TYPE), ROUGH TERRAIN CRANE**, WAGON CRANE, CRUSHING AND/OR SCREENING PLANT, DERRICK TRAVELER, DERRICK (ALL TYPES)(WHEN ASSISTANCE IS NEEDED IT WILL BE AN OILER OR APPRENTICE), DERRICK BOATS, DRAGLINE, DRILL (DAVEY OR SIMILAR), DREDGE, DRILL (WELL AND CORE)(TRUCK OR SKID MOUNTED), ELEVATOR, EXCAVATING EQUIPMENT (ALL OTHER), FORK LIFT (LULL OR SIMILAR), FRANKI PILE MACHINE (OR SIMILAR), GUARD POST DRIVER, GRADALL (ALL TYPES), GRADER, ELEVATING GRADER, EQUIPMENT GREASER, HELICOPTER, HELICOPTER HOIST OPERATORS, FRONT END LOADER, HOIST, HYDRAULIC BOOM TRUCK, JUMBO OPERATOR, KOCAL, KOEHRING SCOOPER, LOCOMOTIVE, METRO CHIP HARVESTER (OR SIMILAR), MIX MOBILE, MIXER - PAVER, MUCKING MACHINE, MULTIPLE BOWL MACHINES, PILE DRIVER (SONIC OR SIMILAR), SCRAPERS, SHOVELS (POWERED), SLIP FORM PAVER (C.M.I. AND SIMILAR), SPREADER (CONCRETE, ASPHALT, OR STONE), TIRE REPAIRMAN (WHEN ASSIGNED TO A JOBSITE), TOWER MOBILE, TRACTORS (ALL TYPES), TRENCHER, TUG BOAT, VERMEER SAW, WELDER (REPAIRMAN), WHIRLEY * CRANES WITH BOOM OR MAST LENGTH (INCLUDING JIB) 100 FT OR OVER SHALL BE PAID AN ADDITIONAL $.50 PER HOUR FOR EACH 50-FOOT INCREMENT OF ADDITIONAL BOOM AND/OR JIB LENGTH) ** ROUGH TERRAIN CRANES WITH BOOM OR MAST LENGTH (INCLUDING JIB) 101 FT OR OVER SHALL BE PAID AN ADDITIONAL $.50 PER HOUR FOR EACH 50-FOOT INCREMENT OF ADDITIONAL BOOM AND/OR JIB LENGTH) NOTE: AN ADDITIONAL $1.25 PER HOUR (NOT COUNTING BOOM PAY) SHALL BE PAID FOR ANY CRANE (EXCLUDING OVERHEAD CRANES) RATED 100 TON OR OVER. GENERAL NOTE: HAZARDOUS MATERIAL SITES LEVEL C & D RECEIVE $1.00 PER HOUR PREMIUM FOR ALL CLASSIFICATIONS AND LEVELS A & B RECEIVE $2.50 PREMIUM FOR ALL CLASSIFICATIONS | $31.05 | $15.75 | $46.80 | ENGI0066-020 eff. 07/01/2011 |
POWER EQUIPMENT OPERATOR: CLASS II BALLAST REGULATOR, BOAT (MATERIAL OR PERSONNEL)(POWERED), BOILER, BORING MACHINE, COMPRESSOR (COMBINED WITH AIR TUGGER, AIR PUMP, GUNITE MACHINE, OR SAND BLASTER), CONCRETE BELT PLACER, CONCRETE SAW, CONVEYOR, CARRY CRANE, CRUSHING/SCREENING PLANTS, CURB BUILDER (SELF-PROPELLED), FORKLIFTS (RIDDEN OR SELF-PROPELLED), FORM LINE MACHINE, GENERATOR (OVER 5KW), GROUT PUMP, HEATERS, HOIST (MONORAIL, ROOF, ONE DRUM-REGARDLESS OF POWER USED), HUCK MACHINE (OR SIMILAR), HYDRAULIC JACK (SINGLE OR MULTIPLE)(POWER DRIVEN), LADAVATOR, MORTAR MIXER, MULCHING MACHINE, PAVEMENT BREAKER (SELF-PROPELLED OR RIDDEN), PIN PULLER (POWERED), PIPE CLEANING MACHINE, PIPE DREAM, POWER BROOM (EXCEPT PUSH TYPE), PULVERIZER, PUMPS (REGARDLESS OF POWER USED), ROLLER/COMPACTOR (DIRT), REFRIGERATION PLANT, ROSS CARRIER (OR SIMILAR), SEEDING MACHINE, SKID STEER LOADER (OR SIMILAR), SLAB LIFTING MACHINE (HYDRAULIC), SOIL STABILIZER (PUMP TYPE), SPRAY CURE MACHINE (POWER DRIVEN), SIDE DELIVERY SHOULDER SPREADER (ATTACHMENT), STEAM JENNY (OR SIMILAR), STONE CRUSHER, STONE SPREADER (SELF-PROPELLED), SIPHON (STEAM OR AIR), TIE TAMPER (MULTIPLE HEADS), TRACTOR (WHEN USED FOR LANDSCAPING, SNAKING, OR HAULING), TRUCK (WINCH)(WHEN HOISTING AND PLACING), TUBE FINISHER (C.M.I. AND SIMILAR), TUGGER, WATER BLASTER, WELDING MACHINE, WELL POINT SYSTEM. GENERALScope and notesNOTE: HAZARDOUS MATERIAL SITES LEVEL C & D RECEIVE $1.00 PER HOUR PREMIUM FOR ALL CLASSIFICATIONS AND LEVELS A & B RECEIVE $2.50 PREMIUM FOR ALL CLASSIFICATIONS | $27.36 | $15.75 | $43.11 | ENGI0066-020 eff. 07/01/2011 |
POWER EQUIPMENT OPERATOR: CLASS III BRAKEMAN, DECK HAND, HELICOPTER SIGNALMAN, OILER*, ELEVATOR (ALTERATIONS & REMODELING COMMERCIAL BUILDINGS), * OILERS ON TRUCK CRANES: LESS THAN 50 TON SHALL RECEIVE $.10 OVER THE CLASS III BASE RATE; 50 TON UP TO 100 TON RATED CAPACITY SHALL BE PAID AN ADDITIONAL $.25 PER HOUR OVER THE CLASS III BASE RATE; 100 TON AND OVER SHALL BE PAID AN ADDITIONAL $1.00 PER HOUR OVER THE CLASS III BASE RATE. GENERALScope and notesNOTE: HAZARDOUS MATERIAL SITES LEVEL C & D RECEIVE $1.00 PER HOUR PREMIUM FOR ALL CLASSIFICATIONS AND LEVELS A & B RECEIVE $2.50 PREMIUM FOR ALL CLASSIFICATIONS | $25.64 | $15.75 | $41.39 | ENGI0066-020 eff. 07/01/2011 |
| IRONWORKER: ORNAMENTAL | $38.89 | $34.54 | $73.43 | IRON0003-005 eff. 06/01/2023 |
| CEMENT MASON | $21.94 | $10.39 | $32.33 | PLAS0526-010 eff. 06/01/2014 |
| PLUMBER (WASHINGTON COUNTY (AREA WEST OF A NORTH- SOUTH LINE DRAWN FROM EAST OF MCMURRAY TO WEST OF FREDERICKTOWN)) | $48.65 | $25.47 | $74.12 | PLUM0027-004 eff. 06/01/2023 |
| PLUMBER (BEAVER COUNTY) | $20.76 | $9.98 | $30.74 | PLUM0047-008 eff. 05/01/2013 |
| PLUMBER (FAYETTE AND WASHINGTON (AREA EAST OF A NORTH-SOUTH LINE DRAWN FROM EAST OF MCMURRAY TO WEST OF FREDERICKTOWN) COUNTIES) | $18.27 | $12.74 | $31.01 | PLUM0354-007 eff. 08/01/2011 |
| SHEET METAL (EXCLUDING HVAC DUCT) | $28.00 | $10.87 | $38.87 | SHEE0012-007 eff. 07/01/2026 |
| DRYWALL FINISHER/TAPER | $16.35 | $5.39 | $21.74 | SUPA2002-002 eff. 11/25/2002 |
| LABORER, UNSKILLED | $13.88 | $3.26 | $17.14 | SUPA2002-002 eff. 11/25/2002 |
| PAINTER: BRUSH AND ROLLER | $16.36 | $4.79 | $21.15 | SUPA2002-002 eff. 11/25/2002 |
| PLASTERER | $18.04 | $4.94 | $22.98 | SUPA2002-002 eff. 11/25/2002 |
| ROOFER (EXCLUDING ASPHALT ROOFING) | $18.94 | $5.62 | $24.56 | SUPA2002-002 eff. 11/25/2002 |
| SHEET METAL WORKER | $16.00 | $3.08 | $19.08 | SUPA2002-002 eff. 11/25/2002 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 3 published 08/20/2026. We format and check the official text; the determination in your contract is what applies.