Pennsylvania prevailing wage rates: PA20260065
Building construction in Somerset County.
PA20260065, modification 4, published 09/24/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 3
- changed MILLWRIGHT base $43.00 → $49.00 (+$6.00), fringe $23.44 → $26.29 (+$2.85) New rates effective 06/01/2026 (previously 06/01/2024).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BOILERMAKER | $48.28 | $33.17 | $81.45 | BOIL0154-007 eff. 01/01/2025 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | BRPA0009-011 eff. 12/01/2022 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | BRPA0009-011 eff. 12/01/2022 |
BRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING, AND BRICK REFRACTORY WORKScope and notesADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $34.14 | $22.00 | $56.14 | BRPA0009-026 eff. 12/01/2022 |
MASON - STONEScope and notesADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $34.14 | $22.00 | $56.14 | BRPA0009-026 eff. 12/01/2022 |
| CARPENTER (SCAFFOLD BUILDING AND FLOOR LAYING-VINYL ONLY) | $33.01 | $18.09 | $51.10 | CARP0423-010 eff. 06/01/2023 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET, FORM WORK AND GUTTER INSTALLATION; EXCLUDES SCAFFOLD BUILDING) | $33.01 | $18.09 | $51.10 | CARP0423-011 eff. 06/01/2023 |
| MILLWRIGHT | $49.00 | $26.29 | $75.29 | CARP0443-004 eff. 06/01/2026 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM, LOW VOLTAGE WIRING AND HVAC TEMPERATURE CONTROL INSTALLATION) | $50.86 | $31.78 | $82.64 | ELEC0005-016 eff. 12/27/2024 |
| POWER EQUIPMENT OPERATOR PAVER: ASPHALT, AGGREGATE, AND CONCRETE | $36.87 | $21.32 | $58.19 | ENGI0066-034 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $36.87 | $21.32 | $58.19 | ENGI0066-034 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 | ENGI0066-034 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | $21.32 | $53.57 | ENGI0066-034 eff. 07/01/2024 |
| IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | $32.29 | $32.41 | $64.70 | IRON0003-013 eff. 06/01/2023 |
| LABORER (CONCRETE WORKER) | $25.98 | $19.53 | $45.51 | LABO0910-004 eff. 01/01/2025 |
| PAINTER (SPRAY ONLY) | $27.95 | $16.12 | $44.07 | PAIN0041-001 eff. 05/01/2014 |
| PAINTER: BRUSH AND ROLLER ONLY | $30.56 | $23.72 | $54.28 | PAIN0057-001 eff. 06/01/2023 |
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 | $55.65 | PAIN0057-001 eff. 06/01/2023 |
| GLAZIER | $25.40 | $25.47 | $50.87 | PAIN0751-002 eff. 09/01/2023 |
| CEMENT MASON/CONCRETE FINISHER | $31.97 | $21.35 | $53.32 | PLAS0526-014 eff. 01/01/2025 |
| PIPEFITTER (INDUSTRIAL) | $47.75 | $26.55 | $74.30 | PLUM0354-010 eff. 06/01/2024 |
| PLUMBER | $40.02 | $26.55 | $66.57 | PLUM0354-011 eff. 06/01/2024 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION AND HVAC UNIT INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | $40.02 | $26.55 | $66.57 | PLUM0354-020 eff. 06/01/2024 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $28.96 | $78.71 | SFPA0669-004 eff. 04/01/2025 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $46.75 | $35.93 | $82.68 | SHEE0012-008 eff. 07/01/2026 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $33.62 | $18.79 | $52.41 | SUPA2011-023 eff. 08/20/2014 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $18.43 | $9.74 | $28.17 | SUPA2011-023 eff. 08/20/2014 |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | $12.97 | $36.66 | SUPA2011-023 eff. 08/20/2014 |
| PLASTERER | $20.97 | $10.78 | $31.75 | SUPA2011-023 eff. 08/20/2014 |
| ROOFER | $27.00 | $12.19 | $39.19 | SUPA2011-023 eff. 08/20/2014 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $30.58 | $24.04 | $54.62 | SUPA2011-023 eff. 08/20/2014 |
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $12.17 | $37.15 | SUPA2011-023 eff. 08/20/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 4 published 09/24/2026. We format and check the official text; the determination in your contract is what applies.