Pennsylvania prevailing wage rates: PA20260075
Building construction in Beaver County.
PA20260075, modification 6, published 09/24/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 5
- changed MILLWRIGHT base $43.00 → $49.00 (+$6.00), fringe $23.44 → $26.29 (+$2.85) New rates effective 06/01/2026 (previously 06/01/2024).
1 classifications added, 1 removed or reworded
- removed ADD $.75 BOOMS 151-200 JIBS- ADD $1.50: BOOMS 201-251 JIBS- ADD $2.25 was $41.69 + $24.05 fringe
- added POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, COMPACTOR, CRANE*, DRILL RIG CAISSONS, DRILL, GRADALL, GRADER/BLADE, MAN LIFT/OUTSIDE ELEVATOR, MECHANIC, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), SCRAPER, FORKLIFT (LULL) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 $41.69 + $24.05 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION AND INDUSTRIAL WORK (INCLUDING DUCT AND PIPE)) | $46.50 | $29.43 | $75.93 | ASBE0002-005 eff. 08/01/2024 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 | BOIL0154-007 eff. 01/01/2025 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | BRPA0009-011 eff. 12/01/2022 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | BRPA0009-011 eff. 12/01/2022 |
BRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING, AND BRICK REFRACTORY WORKScope and notesADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $35.28 | $24.49 | $59.77 | BRPA0009-055 eff. 12/01/2022 |
MASON - STONEScope and notesADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $35.28 | $24.49 | $59.77 | BRPA0009-055 eff. 12/01/2022 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-HARDWOOD FLOORS, CARPET, FORM WORK, AND SCAFFOLD BUILDING) | $38.92 | $20.06 | $58.98 | CARP0142-014 eff. 06/01/2023 |
| PILEDRIVERMAN | $43.13 | $23.42 | $66.55 | CARP0274-003 eff. 01/01/2026 |
| MILLWRIGHT | $49.00 | $26.29 | $75.29 | CARP0443-004 eff. 06/01/2026 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $49.11 | $36.79 | $85.90 | ELEC0005-019 eff. 12/26/2025 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION AND LOW VOLTAGE WIRING AND INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION) | $51.45 | $29.77 | $81.22 | ELEC0712-010 eff. 12/29/2025 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, COMPACTOR, CRANE*, DRILL RIG CAISSONS, DRILL, GRADALL, GRADER/BLADE, MAN LIFT/OUTSIDE ELEVATOR, MECHANIC, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), SCRAPER, FORKLIFT (LULL) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $41.69 | $24.05 | $65.74 | ENGI0066-040 eff. 06/01/2024 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER, COMPRESSOR, CONCRETE PUMP, HIGHLIFT, HOIST, PUMP, ROLLER, TUGBOAT, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $35.62 | $24.05 | $59.67 | ENGI0066-040 eff. 06/01/2024 |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | $24.05 | $65.74 | ENGI0066-040 eff. 06/01/2024 |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | $24.05 | $56.88 | ENGI0066-040 eff. 06/01/2024 |
| IRONWORKER (ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL; METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION) | $38.89 | $34.54 | $73.43 | IRON0003-025 eff. 06/01/2023 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 | LABO0125-005 eff. 06/01/2022 |
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS)) | $27.97 | $20.39 | $48.36 | LABO0833-001 eff. 01/01/2026 |
| LABORER (MASON TENDER- BRICK) | $30.97 | $20.39 | $51.36 | LABO0833-001 eff. 01/01/2026 |
| LABORER: COMMON OR GENERAL | $27.82 | $20.39 | $48.21 | LABO0833-001 eff. 01/01/2026 |
| PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDING WORK ON INDUSTRIAL SITES) | $30.56 | $23.72 | $54.28 | PAIN0057-033 eff. 06/01/2023 |
| PAINTER: DRYWALL FINISHING/TAPING | $32.39 | $23.26 | $55.65 | PAIN0057-033 eff. 06/01/2023 |
| PAINTER (INDUSTRIAL: BRUSH AND ROLLER ONLY) | $36.01 | $23.72 | $59.73 | PAIN0057-034 eff. 06/01/2023 |
| PAINTER (INDUSTRIAL: SPRAY AND SANDBLASTER ONLY) | $36.01 | $23.72 | $59.73 | PAIN0057-034 eff. 06/01/2023 |
| GLAZIER | $35.65 | $29.73 | $65.38 | PAIN0751-006 eff. 09/01/2023 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 | PLAS0526-015 eff. 06/01/2021 |
| PLASTERER | $30.69 | $18.99 | $49.68 | PLAS0526-026 eff. 06/01/2021 |
| PLUMBER | $48.65 | $25.47 | $74.12 | PLUM0027-003 eff. 06/01/2023 |
| PIPEFITTER (INDUSTRIAL) | $52.50 | $30.17 | $82.67 | PLUM0449-004 eff. 06/01/2024 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | $48.15 | $29.17 | $77.32 | PLUM0449-005 eff. 06/01/2024 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $41.21 | $21.46 | $62.67 | ROOF0037-005 eff. 12/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 | SFPA0669-004 eff. 01/01/2026 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $46.75 | $35.93 | $82.68 | SHEE0012-011 eff. 07/01/2026 |
| FLOOR LAYER: VINYL FLOORING | $28.11 | $7.03 | $35.14 | SUPA2011-033 eff. 08/20/2014 |
| LABORER: ASPHALT RAKER | $20.92 | $9.09 | $30.01 | SUPA2011-033 eff. 08/20/2014 |
| LABORER: LANDSCAPE | $18.10 | $0.00 | $18.10 | SUPA2011-033 eff. 08/20/2014 |
| LABORER: LUTEMAN | $21.13 | $8.23 | $29.36 | SUPA2011-033 eff. 08/20/2014 |
| ROOFER: WATERPROOFING ONLY | $25.07 | $7.33 | $32.40 | SUPA2011-033 eff. 08/20/2014 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 | SUPA2011-033 eff. 08/20/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.