Pennsylvania prevailing wage rates: PA20260080
Building construction in Cambria County.
PA20260080, modification 5, published 09/24/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 4
- changed MILLWRIGHT base $43.00 → $49.00 (+$6.00), fringe $23.44 → $26.29 (+$2.85) New rates effective 06/01/2026 (previously 06/01/2024).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 | $69.81 | ASBE0023-008 eff. 07/01/2024 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 | BOIL0154-003 eff. 01/01/2025 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | BRPA0009-011 eff. 12/01/2022 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | BRPA0009-011 eff. 12/01/2022 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, CLEANING) | $34.14 | $22.00 | $56.14 | BRPA0009-044 eff. 12/01/2022 |
| MASON - STONE | $34.14 | $22.00 | $56.14 | BRPA0009-044 eff. 12/01/2022 |
| CARPENTER (SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD ONLY) | $33.01 | $18.09 | $51.10 | CARP0423-007 eff. 06/01/2023 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND VINYL, FORM WORK AND GUTTER INSTALLATION; EXCLUDES SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD FLOORS.) | $33.01 | $18.09 | $51.10 | CARP0423-008 eff. 06/01/2023 |
| MILLWRIGHT | $49.00 | $26.29 | $75.29 | CARP0443-004 eff. 06/01/2026 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION) | $49.11 | $36.79 | $85.90 | ELEC0005-014 eff. 12/26/2025 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $36.87 | $21.32 | $58.19 | ENGI0066-041 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | $21.32 | $58.19 | ENGI0066-041 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | $29.70 | $21.32 | $51.02 | ENGI0066-041 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 | ENGI0066-041 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | $21.32 | $53.57 | ENGI0066-041 eff. 07/01/2024 |
| IRONWORKER (ORNAMENTAL, REINFORCING, RIGGER, STRUCTURAL) | $38.89 | $34.54 | $73.43 | IRON0003-022 eff. 06/01/2023 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 | LABO0125-005 eff. 06/01/2022 |
| LABORER: MASON TENDER-BRICK | $29.56 | $17.05 | $46.61 | LABO0824-002 eff. 01/01/2024 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $32.39 | $23.26 | $55.65 | PAIN0057-035 eff. 06/01/2023 |
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $30.56 | $23.72 | $54.28 | PAIN0057-035 eff. 06/01/2023 |
| GLAZIER | $25.40 | $25.47 | $50.87 | PAIN0751-002 eff. 09/01/2023 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 | PLAS0526-015 eff. 06/01/2021 |
| PLASTERER | $29.20 | $12.86 | $42.06 | PLAS0526-025 eff. 06/01/2021 |
| PLUMBER (INDUSTRIAL) | $47.75 | $26.55 | $74.30 | PLUM0354-009 eff. 06/01/2024 |
| PIPEFITTER | $41.36 | $29.45 | $70.81 | PLUM0520-018 eff. 05/01/2023 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $46.75 | $35.93 | $82.68 | SHEE0012-012 eff. 07/01/2026 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $34.86 | $18.55 | $53.41 | SUPA2011-038 eff. 08/20/2014 |
| LABORER: COMMON OR GENERAL | $17.53 | $10.02 | $27.55 | SUPA2011-038 eff. 08/20/2014 |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | $13.13 | $36.82 | SUPA2011-038 eff. 08/20/2014 |
| PLUMBER (HVAC PIPE INSTALLATION ONLY) | $30.44 | $18.73 | $49.17 | SUPA2011-038 eff. 08/20/2014 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION AND WORK ON INDUSTRIAL SITES | $30.14 | $18.83 | $48.97 | SUPA2011-038 eff. 08/20/2014 |
| ROOFER, EXCLUDES WATERPROOFING | $33.50 | $20.66 | $54.16 | SUPA2011-038 eff. 08/20/2014 |
| ROOFER: WATERPROOFING ONLY | $29.50 | $21.10 | $50.60 | SUPA2011-038 eff. 08/20/2014 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $31.38 | $19.73 | $51.11 | SUPA2011-038 eff. 08/20/2014 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 | SUPA2011-038 eff. 08/20/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 5 published 09/24/2026. We format and check the official text; the determination in your contract is what applies.