Pennsylvania prevailing wage rates: PA20260082
Building construction in Centre County.
PA20260082, modification 3, published 09/24/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 2
- changed MILLWRIGHT base $43.00 → $49.00 (+$6.00), fringe $23.44 → $26.29 (+$2.85) New rates effective 06/01/2026 (previously 06/01/2024).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $43.00 | $29.81 | $72.81 | ASBE0023-009 eff. 07/01/2024 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 | BOIL0154-003 eff. 01/01/2025 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $31.35 | $13.85 | $45.20 | BRPA0005-065 eff. 05/01/2014 |
| MASON - STONE | $31.35 | $13.85 | $45.20 | BRPA0005-065 eff. 05/01/2014 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | BRPA0009-011 eff. 12/01/2022 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | BRPA0009-011 eff. 12/01/2022 |
| CARPENTER (SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD ONLY) | $33.01 | $18.09 | $51.10 | CARP0423-007 eff. 06/01/2023 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND VINYL, FORM WORK AND GUTTER INSTALLATION; EXCLUDES SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD FLOORS.) | $33.01 | $18.09 | $51.10 | CARP0423-008 eff. 06/01/2023 |
| MILLWRIGHT | $49.00 | $26.29 | $75.29 | CARP0443-004 eff. 06/01/2026 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION) | $50.86 | $31.78 | $82.64 | ELEC0005-014 eff. 12/27/2024 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $40.00 | $27.42 | $67.42 | ELEC0143-009 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $36.87 | $21.32 | $58.19 | ENGI0066-041 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | $21.32 | $58.19 | ENGI0066-041 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | $29.70 | $21.32 | $51.02 | ENGI0066-041 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | $21.32 | $51.02 | ENGI0066-041 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | $21.32 | $53.57 | ENGI0066-041 eff. 07/01/2024 |
| IRONWORKER: ORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | $32.29 | $32.41 | $64.70 | IRON0003-013 eff. 06/01/2023 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 | LABO0125-005 eff. 06/01/2022 |
| LABORER: MASON TENDER-BRICK | $29.56 | $17.05 | $46.61 | LABO0824-002 eff. 01/01/2024 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $32.39 | $23.26 | $55.65 | PAIN0057-035 eff. 06/01/2023 |
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $30.56 | $23.72 | $54.28 | PAIN0057-035 eff. 06/01/2023 |
| GLAZIER | $25.40 | $25.47 | $50.87 | PAIN0751-002 eff. 09/01/2023 |
| PLASTERER | $29.20 | $12.86 | $42.06 | PLAS0526-025 eff. 06/01/2021 |
| PLUMBER (INDUSTRIAL) | $47.75 | $26.55 | $74.30 | PLUM0354-009 eff. 06/01/2024 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $41.36 | $29.45 | $70.81 | PLUM0520-019 eff. 05/01/2023 |
| PLUMBER (EXCLUDES WORK ON INDUSTRIAL SITES) | $41.36 | $29.45 | $70.81 | PLUM0520-019 eff. 05/01/2023 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $28.96 | $78.71 | SFPA0669-004 eff. 04/01/2025 |
SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLYScope and notesFOOTNOTE: PAID HOLIDAY: ELECTION DAY | $45.02 | $44.09 | $89.11 | SHEE0019-017 eff. 06/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $26.02 | $13.86 | $39.88 | SUPA2011-040 eff. 08/20/2014 |
| LABORER: COMMON OR GENERAL | $18.55 | $9.67 | $28.22 | SUPA2011-040 eff. 08/20/2014 |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | $13.13 | $36.82 | SUPA2011-040 eff. 08/20/2014 |
| ROOFER, EXCLUDES WATERPROOFING | $33.50 | $22.10 | $55.60 | SUPA2011-040 eff. 08/20/2014 |
| ROOFER: WATERPROOFING ONLY | $29.50 | $21.10 | $50.60 | SUPA2011-040 eff. 08/20/2014 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $32.03 | $22.87 | $54.90 | SUPA2011-040 eff. 08/20/2014 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 | SUPA2011-040 eff. 08/20/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 3 published 09/24/2026. We format and check the official text; the determination in your contract is what applies.