Pennsylvania prevailing wage rates: PA20260088
Building construction in Erie County.
PA20260088, modification 7, published 09/24/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 6
- changed MILLWRIGHT base $43.00 → $49.00 (+$6.00), fringe $23.44 → $26.29 (+$2.85) New rates effective 06/01/2026 (previously 06/01/2024).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BOILERMAKER | $48.28 | $33.17 | $81.45 | BOIL0154-007 eff. 01/01/2025 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | BRPA0009-011 eff. 12/01/2022 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | BRPA0009-011 eff. 12/01/2022 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $31.24 | $22.92 | $54.16 | BRPA0009-056 eff. 05/01/2022 |
| MASON - STONE | $31.24 | $22.92 | $54.16 | BRPA0009-056 eff. 05/01/2022 |
| CARPENTER (INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET, VINYL, AND FORM WORK; EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $35.83 | $19.53 | $55.36 | CARP0081-010 eff. 05/01/2025 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $38.92 | $20.06 | $58.98 | CARP0142-012 eff. 06/01/2023 |
| PILEDRIVERMAN | $43.13 | $23.42 | $66.55 | CARP0274-003 eff. 01/01/2026 |
| MILLWRIGHT | $49.00 | $26.29 | $75.29 | CARP0443-004 eff. 06/01/2026 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION) | $43.25 | $26.56 | $69.81 | ELEC0056-006 eff. 06/01/2025 |
| ELECTRICIAN (ALARM INSTALLATION AND LOW VOLTAGE WIRING ONLY) | $51.45 | $29.77 | $81.22 | ELEC0712-011 eff. 12/29/2025 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER,CRANE*, DRILL RIG CAISSONS, HIGHLIFT, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $0.50 BOOMS 151-200 JIBS- ADD $1.00 BOOMS OVER 200 JIBS-ADD $1.50 | $34.10 | $22.07 | $56.17 | ENGI0066-043 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: BULLDOZER, COMPACTOR, DRILL, GRADALL, GRADER/BLADE, MECHANIC, FORKLIFT (LULL) | $34.10 | $22.07 | $56.17 | ENGI0066-043 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $34.10 | $22.07 | $56.17 | ENGI0066-043 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: LOADER | $34.10 | $22.07 | $56.17 | ENGI0066-043 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: OILER | $29.25 | $22.07 | $51.32 | ENGI0066-043 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATOR: ROLLER | $33.43 | $22.07 | $55.50 | ENGI0066-043 eff. 05/01/2025 |
| IRONWORKER (ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL; METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION) | $33.57 | $32.23 | $65.80 | IRON0003-023 eff. 06/01/2023 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 | LABO0125-005 eff. 06/01/2022 |
| LABORER: MASON TENDER-BRICK | $21.92 | $12.81 | $34.73 | LABO0323-005 eff. 01/01/2014 |
| PAINTER (BRUSH AND ROLLER) | $26.37 | $24.89 | $51.26 | PAIN0549-002 eff. 05/01/2024 |
| PAINTER (DRYWALL FINISHING/TAPING) | $26.62 | $24.89 | $51.51 | PAIN0549-002 eff. 05/01/2024 |
| PAINTER: SPRAY | $27.12 | $24.89 | $52.01 | PAIN0549-002 eff. 05/01/2024 |
| CEMENT MASON/CONCRETE FINISHER | $31.89 | $17.39 | $49.28 | PLAS0526-013 eff. 05/01/2022 |
| PLUMBER | $46.98 | $25.47 | $72.45 | PLUM0027-006 eff. 06/01/2023 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $48.15 | $29.17 | $77.32 | PLUM0449-006 eff. 06/01/2024 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $36.70 | $18.09 | $54.79 | ROOF0210-007 eff. 05/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 | SFPA0669-004 eff. 01/01/2026 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT, METAL ROOF, AND METAL FLASHING INSTALLATION) | $46.75 | $35.93 | $82.68 | SHEE0012-013 eff. 07/01/2026 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $30.41 | $20.04 | $50.45 | SUPA2011-046 eff. 08/20/2014 |
| LABORER: COMMON OR GENERAL | $17.40 | $6.93 | $24.33 | SUPA2011-046 eff. 08/20/2014 |
| ROOFER: WATERPROOFING ONLY | $26.77 | $12.57 | $39.34 | SUPA2011-046 eff. 08/20/2014 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 | SUPA2011-046 eff. 08/20/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 7 published 09/24/2026. We format and check the official text; the determination in your contract is what applies.