Tennessee prevailing wage rates: TN20260147
Highway construction in Anderson, Bedford, Benton, Bledsoe, Blount, Bradley, Campbell, Cannon, Carroll, Carter, Cheatham, Chester, Claiborne, Clay, Cocke, Coffee, Crockett, Cumberland, Davidson, De Kalb, Decatur, Dickson, Dyer, Fayette, Fentress, Franklin, Gibson, Giles, Grainger, Greene, Grundy, Hamblen, Hamilton, Hancock, Hardeman, Hardin, Hawkins, Haywood, Henderson, Henry, Hickman, Houston, Humphreys, Jackson, Jefferson, Johnson, Knox, Lake, Lauderdale, Lawrence, Lewis, Lincoln, Loudon, Macon, Madison, Marion, Marshall, Maury, McMinn, McNairy, Meigs, Monroe, Montgomery, Moore, Morgan, Obion, Overton, Perry, Pickett, Polk, Putnam, Rhea, Roane, Robertson, Rutherford, Scott, Sequatchie, Sevier, Shelby, Smith, Stewart, Sullivan, Sumner, Tipton, Trousdale, Unicoi, Union, Van Buren, Warren, Washington, Wayne, Weakley, White, Williamson, Wilson Counties.
TN20260147, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
1 classifications added, 0 removed or reworded
- added POWER EQUIPMENT OPERATOR: BOBCAT, CENTRAL MINING PLANT, CONCRETE PUMP, CONCRETE SAW, CURB MACHINE (AUTOMATIC OR MANUAL), DOZER OR LOADER (STOCKPILE), DRILL (PILING), MULCHER OR SEEDER, ROCK DRILL (TRUCK MOUNTED), ROLLER (ASPHALT), ROLLER (COMPACTION SELF-PROPELLED), SOIL STABILIZATION MACHINE, TRACTOR (BOOM AND HOIST), BITUMINOUS DISTRIBUTOR MACHINE, PUMP, TRACK DRILL, STRIPING MACHINE (GROUP 4) $16.48 + $0.00 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| TRUCK DRIVER (5 OR MORE AXLES) | $16.27 | $0.00 | $16.27 | SUTN2016-001 eff. 07/13/2016 |
| TRUCK DRIVER (3-4 AXLES) | $14.86 | $0.00 | $14.86 | SUTN2016-001 eff. 07/13/2016 |
| TRUCK DRIVER (2 AXLES) | $15.36 | $0.00 | $15.36 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 4 SWEEPING MACHINE (VACUUM) OPERATOR | $15.56 | $0.00 | $15.56 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT, CENTRAL MINING PLANT, CONCRETE PUMP, CONCRETE SAW, CURB MACHINE (AUTOMATIC OR MANUAL), DOZER OR LOADER (STOCKPILE), DRILL (PILING), MULCHER OR SEEDER, ROCK DRILL (TRUCK MOUNTED), ROLLER (ASPHALT), ROLLER (COMPACTION SELF-PROPELLED), SOIL STABILIZATION MACHINE, TRACTOR (BOOM AND HOIST), BITUMINOUS DISTRIBUTOR MACHINE, PUMP, TRACK DRILL, STRIPING MACHINE | $16.48 | $0.00 | $16.48 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LIGHT DUTY MECHANIC | $19.53 | $0.00 | $19.53 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 4 HEAVY DUTY MECHANIC | $20.33 | $0.00 | $20.33 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT PAVER, CONCRETE FINISHING MACHINE, CONCRETE PAVER, SCALE, SPREADER (SELF-PROPELLED), CONCRETE GRINDER, ASPHALT MILLING MACHINE, BORING MACHINE (HORIZONTAL) | $17.75 | $0.00 | $17.75 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE/HYDRAULIC EXCAVATOR (LESS THAN 3/4 YD), BULLDOZER OR PUSH DOZER, END LOADER (LESS THAN 3 YD), MOTOR PATROL (ROUGH), TRACTOR (CRAWLER/ UTILITY), TRUCK DRIVER (HEAVY DUTY, OFF ROAD) SCRAPER, SHOVEL, OR TRENCHING MACHINE | $17.08 | $0.00 | $17.08 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 1A FARM TRACTOR OPERATOR (POWER BROOM) | $13.50 EO 13658 minimum $13.65 may apply | $0.00 | $13.50 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 1A DRILL OPERATOR (CAISSON) | $25.26 | $0.00 | $25.26 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE/HYDRAULIC EXCAVATOR (3/4 YD & OVER), CRANE (LESS THAN 20 TONS), END LOADER (3 YD & OVER), MOTOR PATROL (FINISH),PILEDRIVER, DRAGLINE | $19.14 | $0.00 | $19.14 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: BOBCAT, CENTRAL MINING PLANT, CONCRETE PUMP, CONCRETE SAW, CURB MACHINE (AUTOMATIC OR MANUAL), DOZER OR LOADER (STOCKPILE), DRILL (PILING), MULCHER OR SEEDER, ROCK DRILL (TRUCK MOUNTED), ROLLER (ASPHALT), ROLLER (COMPACTION SELF-PROPELLED), SOIL STABILIZATION MACHINE, TRACTOR (BOOM AND HOIST), BITUMINOUS DISTRIBUTOR MACHINE, PUMP, TRACK DRILL, STRIPING MACHINE (GROUP 4) | $16.48 | $0.00 | $16.48 | SUTN2016-001 eff. 07/13/2016 |
| POWER EQUIPMENT OPERATOR: GROUP 5 CRANE (OVER 20 TONS) | $20.44 | $0.00 | $20.44 | SUTN2016-001 eff. 07/13/2016 |
| PAINTER (INCLUDES SANDBLASTER) | $26.36 | $0.00 | $26.36 | SUTN2016-001 eff. 07/13/2016 |
| LABORER, SKILLED (AIR TOOL OPERATOR, ASPHALT RAKER, CHAIN SAW OPERATOR, CONCRETE MIXER (LESS THAN 1 YD), CONCRETE RUBBER, EDGER, FENCE ERECTOR, FORM SETTER (STEEL), GUARD RAIL ERECTOR, MECHANIC'S TENDER (TIRE CHANGER OR OILER), MORTAR MIXER, NOZZLEMAN OR GUN OPERATOR (GUNITE), PIPELAYER, SIGN ERECTOR) | $15.27 | $0.00 | $15.27 | SUTN2016-001 eff. 07/13/2016 |
| LABORER (COMMON/UNSKILLED) | $13.11 EO 13658 minimum $13.65 may apply | $0.00 | $13.11 | SUTN2016-001 eff. 07/13/2016 |
| IRONWORKER (STRUCTURAL) | $16.89 | $0.00 | $16.89 | SUTN2016-001 eff. 07/13/2016 |
| IRONWORKER (REINFORCING) | $16.29 | $0.00 | $16.29 | SUTN2016-001 eff. 07/13/2016 |
| ELECTRICIAN | $24.08 | $0.00 | $24.08 | SUTN2016-001 eff. 07/13/2016 |
| CEMENT MASON/CONCRETE FINISHER | $15.55 | $0.00 | $15.55 | SUTN2016-001 eff. 07/13/2016 |
| CARPENTER | $17.52 | $0.00 | $17.52 | SUTN2016-001 eff. 07/13/2016 |
| BRICKLAYER | $14.26 | $0.00 | $14.26 | SUTN2016-001 eff. 07/13/2016 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.