Tennessee prevailing wage rates: TN20260189
Building construction in Tipton County.
TN20260189, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
- changed ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) base $34.90 → $36.75 (+$1.85), fringe $15.90 → $16.19 (+$0.29) New rates effective 08/04/2025 (previously 08/05/2024).
- changed IRONWORKER, REINFORCING base $33.73 → $35.32 (+$1.59), fringe $17.73 → $17.07 (−$0.66) New rates effective 05/01/2025 (previously 05/01/2024).
- changed IRONWORKER, STRUCTURAL base $33.73 → $35.32 (+$1.59), fringe $17.73 → $17.07 (−$0.66) New rates effective 05/01/2025 (previously 05/01/2024).
- changed IRONWORKER: ORNAMENTAL base $33.73 → $35.32 (+$1.59), fringe $17.73 → $17.07 (−$0.66) New rates effective 05/01/2025 (previously 05/01/2024).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.17 | $18.82 | $56.99 | ASBE0086-002 eff. 03/01/2025 |
| CARPENTER | $30.20 | $14.74 | $44.94 | CARP0345-001 eff. 05/01/2024 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $36.75 | $16.19 | $52.94 | ELEC0474-002 eff. 08/04/2025 |
| IRONWORKER: ORNAMENTAL | $35.32 | $17.07 | $52.39 | IRON0492-002 eff. 05/01/2025 |
| IRONWORKER, STRUCTURAL | $35.32 | $17.07 | $52.39 | IRON0492-002 eff. 05/01/2025 |
| IRONWORKER, REINFORCING | $35.32 | $17.07 | $52.39 | IRON0492-002 eff. 05/01/2025 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $34.95 | $16.66 | $51.61 | SHEE0004-008 eff. 01/01/2024 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $34.95 | $16.66 | $51.61 | SHEE0004-008 eff. 01/01/2024 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $34.95 | $16.66 | $51.61 | SHEE0004-010 eff. 01/01/2024 |
| TRUCK DRIVER: DUMP TRUCK | $15.28 | $0.00 | $15.28 | SUTN2017-042 eff. 04/16/2021 |
| TILE SETTER | $19.65 | $0.00 | $19.65 | SUTN2017-042 eff. 04/16/2021 |
| TILE FINISHER | $14.00 | $0.00 | $14.00 | SUTN2017-042 eff. 04/16/2021 |
| ROOFER | $16.29 | $0.00 | $16.29 | SUTN2017-042 eff. 04/16/2021 |
| PLUMBER | $26.86 | $10.40 | $37.26 | SUTN2017-042 eff. 04/16/2021 |
| PIPEFITTER | $29.54 | $12.41 | $41.95 | SUTN2017-042 eff. 04/16/2021 |
| PAINTER (BRUSH AND ROLLER) | $17.00 | $0.00 | $17.00 | SUTN2017-042 eff. 04/16/2021 |
| OPERATOR: ROLLER | $14.35 | $0.00 | $14.35 | SUTN2017-042 eff. 04/16/2021 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $14.70 | $0.00 | $14.70 | SUTN2017-042 eff. 04/16/2021 |
| OPERATOR: FORKLIFT | $15.00 | $0.00 | $15.00 | SUTN2017-042 eff. 04/16/2021 |
| OPERATOR: DRILL | $26.50 | $4.09 | $30.59 | SUTN2017-042 eff. 04/16/2021 |
| OPERATOR: CRANE | $25.70 | $7.75 | $33.45 | SUTN2017-042 eff. 04/16/2021 |
| OPERATOR: BULLDOZER | $28.19 | $9.65 | $37.84 | SUTN2017-042 eff. 04/16/2021 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.84 | $0.00 | $16.84 | SUTN2017-042 eff. 04/16/2021 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.06 | $0.00 | $23.06 | SUTN2017-042 eff. 04/16/2021 |
| LABORER: PIPELAYER | $14.99 | $2.41 | $17.40 | SUTN2017-042 eff. 04/16/2021 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.33 | $0.00 | $15.33 | SUTN2017-042 eff. 04/16/2021 |
| LABORER: MASON TENDER - BRICK | $13.54 EO 13658 minimum $13.65 may apply | $0.00 | $13.54 | SUTN2017-042 eff. 04/16/2021 |
| LABORER: COMMON OR GENERAL | $13.97 | $1.30 | $15.27 | SUTN2017-042 eff. 04/16/2021 |
| LABORER GRADE CHECKER | $13.01 EO 13658 minimum $13.65 may apply | $0.00 | $13.01 | SUTN2017-042 eff. 04/16/2021 |
| LABORER DEMOLITION | $16.74 | $0.00 | $16.74 | SUTN2017-042 eff. 04/16/2021 |
| GLAZIER | $16.99 | $3.70 | $20.69 | SUTN2017-042 eff. 04/16/2021 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $25.31 | $9.18 | $34.49 | SUTN2017-042 eff. 04/16/2021 |
| CEMENT MASON/CONCRETE FINISHER | $20.25 | $0.00 | $20.25 | SUTN2017-042 eff. 04/16/2021 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 | SUTN2017-042 eff. 04/16/2021 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.